Ivanhoe station (Illinois) explained

Style:Metra
Coordinates:41.6332°N -87.6305°W
Line:University Park Sub District
Tracks:2
Parking:Yes
Bicycle:Yes; Bicycle racks
Passengers:520 (average weekday)
Pass Year:2018
Pass Percent:-17.2
Pass Rank:96 out of 236
Rebuilt:June 25, 1994[1]
Accessible:yes
Zone:2
Other Services Header:Former services
Other Services Collapsible:yes
Map State:collapsed
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail
Marker-Color:
  1. ff4e00
Zoom:15

Ivanhoe is one of two commuter rail stations on the Metra Electric District main branch in Riverdale, Illinois. The station is located at 144th Street and Tracy Street, and is 18.2miles away from the northern terminus at Millennium Station.[2] In Metra's zone-based fare system, Ivanhoe Station is in zone 2., Ivanhoe is the 96th busiest of Metra's 236 non-downtown stations, with an average of 520 weekday boardings.[3]

Like the station, Ivanhoe is built on a bridge embankment south of 144th Street, which also carries Amtrak's City of New Orleans, Illini, and Saluki trains. The waiting room is open 24 hours, is located on the north sidewalk, and contains ticket vending machines. Parking is available on the east side of the tracks on primarily north of Illinois Street between 144th and 145th Streets. Another parking lot is available across from this one on 144th Street, and a third can be found off the northeast corner of 144th Street and Atlantic Avenue. Street-side parking can also be found on 145th Street between Illinois Street and Atlantic Avenue in front of C. Kelly Franson Park. No bus connections are available at this station.

External links

Notes and References

  1. https://www.flickr.com/photos/riverdalelibrary/sets/72157625888107725/ Ivanhoe Metra Station Dedication June 25, 1994
  2. http://web.me.com/willvdv/chirailfan/mmelec.html Metra Railfan Tips - Metra Electric
  3. Web site: Commuter Rail System Station Boarding/Alighting Count: Summary Results Fall 2018. April 2019. Metra. https://web.archive.org/web/20190526034459/https://metrarail.com/sites/default/files/assets/planning/ridership/2018_summary_results_report_final.pdf. 26 May 2019.