Italian offshore patrol vessel Paolo Thaon di Revel explained

Paolo Thaon di Revel (P430) is the lead ship of the s.

Development and design

The ships were designed as a "multipurpose offshore patrol vessel". The first seven vessels are built with different configurations: a basic "light" variant for the patrol task, an enhanced configuration with better self-defence capacity and a "full" variant incorporating a much broader capability.[1] Paolo Thaon di Revel, as the lead ship of the class, is built in the "light" configuration.

The Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missile with also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.[2] [3] [4]

Construction and career

Paolo Thaon di Revel was laid down on 9 May 2017 at Fincantieri Muggiano and launched on 15 June 2019.[5] [6] Expected to be commissioned in May 2021.[7] 15 November 2019, she underwent her first sea trial off the Gulf of La Spezia.[8] [9] The vessel was delivered to the Italian Navy in March, 2022.

In August 2022, the ship, with one SH-90A helicopter embarked, operates as flagship of Operation AGENOR, the military pillar of the European-Led Maritime Awareness in the Strait of Hormuz (EMASoH), being deployed in the Gulf region, Strait of Hormuz, and the Gulf of Oman, to promote the safe passage of merchant shipping in the region.[10]

External links

Notes and References

  1. Web site: Fincantieri Delivers First PPA 'Thaon di Revel' to Italian Navy . 18 March 2022 .
  2. Web site: Un nuovo TESEO land attack per la Marina – RID Portale Difesa . 3 November 2020 . 14 July 2018 . https://web.archive.org/web/20180714135240/http://www.portaledifesa.it/index~phppag,3_id,2349.html . dead .
  3. Web site: Airpressonline.it .
  4. Web site: Mbda, al via lo sviluppo del nuovo Teseo . 22 March 2018 .
  5. Web site: Fincantieri DRY DOCK WORKS START ON THE FIRST MULTIPURPOSE OFFSHORE PATROL SHIP. 2020-11-03. www.fincantieri.com. en.
  6. Web site: Fincantieri THE MULTIPURPOSE OFFSHORE PATROL SHIP "THAON DI REVEL" LAUNCHED IN MUGGIANO. 2020-11-03. www.fincantieri.com. en.
  7. Web site: PPA1 sails the waves of the Tyrrhenian Sea OCCAR. 2020-11-03. www.occar.int.
  8. Web site: First sea trials for Paolo Thaon di Revel PPA multipurpose offshore ships built for Italian Navy. 2020-11-03. www.navyrecognition.com.
  9. Web site: Archus. Dorian. 2019-11-16. Fincantieri begins sea trials of first OPV, Paolo Thaon di Revel. 2020-11-03. Naval News. en-US.
  10. Web site: Italian Navy FoC Thaon di Revel PPA joins EMASoH . 29 August 2022 .