Intuitive Machines Nova-C Explained

Nova-C lunar lander
Manufacturer:Intuitive Machines
Designer:Intuitive Machines
Country:United States
Operator:Intuitive Machines
Applications:Lunar payload delivery and support
Spacecraft Type:Lunar lander
Spacecraft Bus:Nova-C bus
Design Life:14 days after landing
Payload Capacity:[1]
Length: [2]
Status:In production
Built:2
Orders:3
Launched:1
Retired:1
First:01:05 a.m. EST, 15 February 2024[3]
Derivedfrom:Project Morpheus
Programme:Commercial Lunar Payload Services (CLPS)
Additional flight information
Launch vehicle Falcon 9 Block 5
Avg. cost per spacecraft$118 million US
Proximate missions
Last missionIM-1
Last mission launch date15 February 2024
Next missionIM-2
Next mission launch dateDecember 2024 (or after)

The Intuitive Machines Nova-C, or simply Nova-C, is a class of lunar landers designed by Intuitive Machines (IM) to deliver small payloads to the surface of the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.[4] The IM-1 lunar lander, named Odysseus (pronounced), was launched by a SpaceX Falcon 9[5] rocket on 15 February 2024, reached lunar orbit on 21 February, and landed on the lunar surface on 22 February. This marked the inaugural Nova-C landing on the Moon and the first American spacecraft to perform a soft landing on the Moon in over 50 years.[6] [7] It is the first spacecraft to use methalox propulsion to navigate between the Earth and the Moon.

The second Nova-C lander with the IM-2 mission is scheduled to launch no earlier than December 2024, and a third Nova-C lander on the IM-3 mission is scheduled for no earlier than October 2025. SpaceX is under contract to provide Falcon 9 launches for each of the three landers.[8] [9] [10] [11]

Funding

In 2017, Space Policy Directive 1 signaled the intention of returning NASA astronauts to the Moon. NASA documents obtained by The New York Times suggested the agency would involve the private spaceflight sector in the effort.In 2018, NASA solicited bids from nine companies, including Intuitive Machines, for the Commercial Lunar Payload Services (CLPS) program. CLPS is part of the NASA Artemis program; one of the long term goals of Artemis is establishing a permanent crewed base on the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.

In 2021, Intuitive Machines received a NASA contract that was initially valued at US$77 million to conduct lunar landings for NASA. After contract modifications, the total contract value came to US$118 million in 2024.

Overview

Structure

The lander structure is a hexagonal cylinder with six landing legs and is tall. It has a launch mass of and can hold a payload of .[1]

Propulsion

Nova-C was developed by Intuitive Machines, inheriting technology from NASA's Project Morpheus. Its gimbaled VR900 main engine used methane and oxygen (methalox) as liquid propellants, pressurized by helium gas, to produce of thrust. For attitude control the vehicle uses a helium reaction control system. Each thruster in the RCS uses cold helium gas to produce 4.45 N (1 lbf) of thrust to adjust the spacecraft's attitude.At launch Nova-C is filled with of liquid oxygen, kg of liquid methane and of gaseous helium. [12] Propellant is loaded onto Nova-C at the launch pad alongside propellant loading of the launch vehicle. Use of liquid methane and liquid oxygen is believed to be an enabling technology for future deep space missions. Propellants aboard the lander were stored in composite over-wrap liner-less cryogenic tanks. Thermodynamic venting systems provide cryogenic cooling.

Electric power

Nova-C landers use solar panels as a source of electrical power. Most areas of the lunar surface are sunlit during lunar days, which last approximately fourteen Earth days.

Electrical power is generated by a photovoltaic system with three solar panels, a top deck panel and two body panels, generating a combined maximum of 200 W on the lunar surface. A 25 amp-hour battery supplies power to a 28 VDC bus for use by the spacecraft when power generation lags consumption.

Communications

Nova-C is capable of 24/7 data coverage for its client payloads[1]

Landing

The lander is designed to stay upright when landing on a slope of up to 10 degrees.[13] The lander includes autonomous landing and hazard detection technology and once landed is still capable of relocating itself to a second landing site by performing a vertical takeoff, cruise, and vertical landing.[1]

Missions

Intuitive Machines is conducting the first three Nova-C missions for the NASA Commercial Lunar Payload Services program. The landers are tasked with delivering small science and technology-development payloads.[14]

IM-1 mission

See main article: article and IM-1. The lander for the first Nova-C mission, IM-1, was named Odysseus. A contract for the mission was signed in 2021, with later modifications. The mission launched 15 February 2024 on a Falcon 9 launch vehicle and landed with a "rough" - soft landing on 22 February 2024 in the South Pole region of the moon, approximately at 80.13° South latitude and 1.44° East longitude, inside a shallow 1 km diameter crater with a 12° slope. The lander came to rest about 1.5 km away from the intended landing site near the Malapert A crater. The line of approach brought Odysseus in from the northeast over Schomberger crater. Upon initial contact with the lunar surface, the lander broke a leg off of the hexagonal body, and bounced back along the line of approach, with the main engine and RCS firing to null out vertical and lateral velocities. After landing vertically, the lander slowly settled onto the lunar surface with the top solar array pointed in the general direction of Schomberger crater. One of the rectangular arrays, originally intended to be vertical, is on top and angled 30° with the horizontal, or about 18° with the lunar surface. [15] [16] IM announced that until entering standby mode on February 29, 2024, Odysseus had transmitted over 350 megabytes of science and engineering data from all payloads, and it will try to revive Odysseus during the next lunar day.[17]

Odysseuss "rough" - soft Moon landing is the first soft landing of any kind for an American made spacecraft since Apollo 17, more than 50 years ago, and the first by a private company. The soft Odysseus landing also qualifies the Odysseus mission as the first liquid methane and liquid oxygen (methalox) powered spacecraft to fire beyond low earth orbit, as well as the first methalox spacecraft to land on an off-world celestial body.[18]

After the landing Odysseus was resting on the surface at a 30° angle with the horizontal. It has been confirmed by Tim Crain, CTO of Intuitive Machines, that one of the landing leg struts broke off during the landing, and that the lander is resting on a helium tank and/or a computer shelf that was strapped outside of the main fuselage. Based on telemetry received by mission controllers Odysseus appeared in "good health." The antennas were not vertically aligned as initially planned, and transmissions from the lander were somewhat reduced. Both science and engineering data were received from the lander. It was hoped that a data link could be restored with Odysseus after lunar sunrise occurs at Malapert A crater, although this was not a requirement of the mission, On March 23 Intuitive Machines announced that Odysseus would not wake up and that the mission had ended [19] [20] [21]

Odysseus touched down on the Moon in the middle of a lunar day, and was expected to remain functional for approximately six Earth days (until February 27), when the cold lunar night will set in and the solar panels will no longer be able to supply power.[16] IM engineers announced that they may be able to maintain communication with Odysseus for an additional 10 to 20 hours after the sun has gone down over the Odysseus landing site, due to Odysseuss battery capacity. It was also announced that the Odysseus data feed back to Earth has been sending back payload related science data as well as images. [22]

IM and NASA held a joint press conference on February 28 to discuss and review the IM-1 mission.[23]

IM-2 mission

See main article: article and IM-2.

IM was selected in October 2020 in order to land its second Nova-C lander near the lunar south pole. As of August 2024, IM-2 is expected to be launched no earlier than December 2024. In May 2024, the company shared IM-2 entered into its final assembly stage.[24] The primary payload, PRIME-1, includes the TRIDENT ice drill to sample ice from below the lunar surface and the MSolo mass spectrometer to measure the amount of ice in the samples.[25] [26]

ILO-1 prime contractor Canadensys is working to deliver "a flight-ready low-cost optical payload for the ILO-1 mission, ruggedized for the Moon South Pole environment". It could potentially be ready for integration on the IM-2 mission.[27]

The μNova (Micro-Nova) Hopper will separate from the Nova-C lander after landing and function as a standalone hopper lander, exploring multiple difficult-to-reach areas such as deep craters on the lunar surface.[28]

A lunar communications satellite will be deployed on this mission to facilitate communications between the lander and ground stations on Earth.[29]

Spaceflight will deliver rideshare payloads on this mission aboard its Sherpa EScape (Sherpa-ES) space tug called Geo Pathfinder.[30] [31]

The MiniPIX TPX3 SPACE payload, provided by the Czech company ADVACAM, will be onboard the Nova-C lunar lander. This payload is designed to monitor the radiation field on the Moon and help understand how to protect crew and equipment from the negative effects of cosmic rays. This marks the first Czech payload planned to be delivered to the Moon's surface.[32] [33]

Space technology company Lunar Outpost will send their first lunar rover, the Mobile Autonomous Prospecting Platform (MAPP), on this mission in a partnership with Nokia Bell Labs and IM. MAPP will collect lunar samples for NASA under a contract worth just $1, which is symbolic of a new incentive for the emerging commercial space industry to access resources in space.[34] [35] Photos of the samples and other data will be transmitted through radio equipment and antennas to communicate with the Nova-C lander.[36] [37]

A collaboration in order to demonstrate 4G cellular connectivity, in partnership with Nokia Bell Labs and NASA will be aboard the lander.[38] Nokia's equipment is a Network-In-a-Box and will connect the Nova-C lander with Lunar Outpost's MAPP rover and IM's Micro-Nova Hopper. This 4G/LTE network will provide more bandwidth than the more conventional ultra-high frequency (UHF) systems used for space communication. Nokia says they hope that future missions will use shared infrastructure to interlink bases on the lunar surface.[39]

IM-3 mission

NASA selected a Nova-C mission for CLPS task order CP-11.[40] It will deliver payloads to the lunar swirl in the Reiner Gamma region.[41] In August 2021, Intuitive Machines selected SpaceX to launch its third lunar mission, IM-3.[42] As of August 2024, the launch of IM-3 is expected to take place no earlier than October 2025.[43] The lander will conduct experiments investigating the properties of the unexpected magnetic field that has been detected in the vicinity of the Reiner Gamma swirl.[44]

The Reiner Gamma landing site was announced for the first PRISM opportunity and the JHU Applied Physics Laboratory's Lunar Vertex payload was selected to conducted a detailed scientific analysis of the surface and surface environment. David Blewett (APL) is the principal investigator and leads the science team. Lunar Vertex includes payload elements on the Nova-C lander (APL magnetometer, SwRI plasma spectrometer, and Redwire camera arrays) and on a Lunar Outpost rover (APL magnetometer and Canadensys microscopic imager). APL also provided overall management, systems engineer, SMA, and rover integration and testing.[45]

Additional IM-3 payloads include the Cooperative Autonomous Distributed Robotic Explorers (CADRE) rovers, ESA's MoonLIGHT Pointing Actuator (MPAc) and KASI's Lunar Space Environment Monitor (LUSEM).

IM-C1 mission

Intuitive Machines have indicated that they are working on a 'commercial' mission, named IM-C1.[46]

Further Nova-C missions

The Nova-C lander was designed to be compatible with methane and oxygen fuel sources that are believed to be available on both the Moon and on Mars. For future missions, methane and oxygen could potentially be "harvested" wherever the Nova-C lander may be based using In-situ resource utilization (ISRU) (off-world resource processing technologies).[47] [48] The Nova-C lander technology platform can be scaled up to mid and large lander classes, capable of accommodating larger payloads.

Successors

Nova-D

In an interview with NASA recorded in October 2023, Tim Crain, CTO of Intuitive Machines, mentioned the possible development of a Nova-D lander.[49] Early reports of the in-development Nova-D state that it will use two of the VR-900 engines and be capable of carrying more than 500 kg to the lunar surface.[50]

In August 2024, Intuitive Machines proposed a mission to deliver NASA's VIPER rover to the Moon on a Nova-D lander no earlier than late 2027.[51]

Nova-M

Intuitive Machines is developing another lander, the Nova-M which, according to early reports, will use two VR-3500 engines originally developed for Boeing and their HLS to carry 5,000 kg to the lunar surface.

See also

Other commercial lunar lander programs
Lunar lander programs by country

Notes and References

  1. https://www.intuitivemachines.com/lunarlander Nova-C Lunar Lander
  2. https://www.msn.com/en-us/travel/article/houston-company-among-9-tapped-to-build-moon-landers/ar-BBQhtDm#image=2 Houston company among 9 tapped to build moon landers
  3. https://nextspaceflight.com/launches/details/1915 Status of Nova C (IM-1) Launch Time
  4. Web site: Houston-based Intuitive Machines to be among first private U.S. companies to land on the moon . 5 June 2019 . Houston Chronicle . 22 January 2024 . 1 February 2022 . https://web.archive.org/web/20220201222620/https://www.chron.com/business/bizfeed/article/Houston-based-Intuitive-Machines-to-be-among-13938130.php . live .
  5. Web site: IM-1 Mission Nova-C Lunar Lander Successfully Enroute to the Moon Following its launch on SpaceX's Falcon 9. Intuitive. Machines. 15 February 2024. Intuitive Machines. 25 February 2024. 25 February 2024. https://web.archive.org/web/20240225233601/https://www.intuitivemachines.com/post/im-1-mission-nova-c-lunar-lander-successfully-enroute-to-the-moon-following-its-launch-on-spacex-s-f. live.
  6. News: Chang . Kenneth . A U.S.-Built Spacecraft Lands on the Moon for the First Time Since 1972 . 22 February 2024 . . live . https://archive.today/20240223033817/https://www.nytimes.com/2024/02/22/science/intuitive-machines-lander-history.html . 23 February 2024 . 23 February 2024 .
  7. Web site: 2024-02-22 . Odysseus becomes first US spacecraft to land on moon in over 50 years . 2024-02-23 . . en . 23 February 2024 . https://web.archive.org/web/20240223015022/https://www.cnn.com/us/live-news/nasa-odysseus-moon-landing-intuitive-machines-scn/index.html . live .
  8. Web site: Intuitive Machines' first lunar lander mission slips to 2022. SpaceNews. 28 April 2021. 30 April 2021. 25 February 2024. https://web.archive.org/web/20240225075127/https://spacenews.com/intuitive-machines-first-lunar-lander-mission-slips-to-2022/. live.
  9. https://www.spacelaunchschedule.com/launch/falcon-9-block-5-nova-c-im-2/ Space Launch Schedule for Nova-C IM-2
  10. Web site: One Giant Leap . 19 February 2022 . 24 February 2022 . . 24 February 2022 . https://web.archive.org/web/20220224082549/https://www.columbia.com/omni-heat-infinity/moon-mission/?eid=twitter&mid=brand_organic_social&nid=general . live .
  11. Web site: Etherington. Darrell. Intuitive Machines picks a launch date and landing site for 2021 Moon cargo delivery mission. TechCrunch. 13 April 2020. 24 April 2021. 28 July 2020. https://web.archive.org/web/20200728180440/https://techcrunch.com/2020/04/13/intuitive-machines-picks-a-launch-date-and-landing-site-for-2021-moon-cargo-delivery-mission/. live.
  12. Web site: Gilliland . Tyler . "our LOx/LCH4 numbers are in fact swapped in our proposal." .
  13. News: Why It's So Challenging to Land Upright on the Moon . The New York Times . 4 March 2024 . Chang . Kenneth . 5 March 2024 . 5 March 2024 . https://web.archive.org/web/20240305052649/https://www.nytimes.com/2024/03/04/science/moon-landing-sideways-gravity.html . live .
  14. http://www.spaceminingnews.com/2018/11/30/intuitive-machines-headed-to-the-moon-in-2021/ Intuitive Machines Headed To The Moon In 2021
  15. https://www.nasa.gov/missions/lro/nasas-lro-images-intuitive-machines-odysseus-lander/ NASA’s LRO Images Intuitive Machine’s Odysseus Lander
  16. https://qz.com/sideways-moon-landing-cuts-mission-short-private-us-lu-1851286363 Sideways moon landing cuts mission short, private US lunar lander will stop working Tuesday
  17. https://investors.intuitivemachines.com/news-releases/news-release-details/intuitive-machines-historic-im-1-mission-success-american Intuitivemachines.com news update February 29, 2024
  18. https://www.dropbox.com/scl/fi/bxegh13yo6p8f3nwxv83z/24-02-28-b-reply-from-steve-altemus.pdf?rlkey=48m09hfmv9hkv5lftd4f84bp5&dl=0 Intuitive Machines Press Release
  19. Web site: Sriram . Akash . Varghese . Harshita . Roulette . Joey . February 23, 2024 . Intuitive Machines shares descend fast after the CEO says the moon lander is on its side . February 23, 2024 . Reuters.
  20. https://www.usatoday.com/story/news/nation/2024/02/28/odysseus-moon-lander-press-conference-nasa/72772049007/ Watch live: NASA, Intuitive Machines share updates on Odysseus moon lander
  21. https://twitter.com/Int_Machines/status/1771609255616909738
  22. https://www.intuitivemachines.com/im-1 Lunar Surface Day Five Update
  23. https://www.youtube.com/watch?v=xa2n2-_hLPM NASA, Intuitive Machines Moon Mission Update February 28, 2024
  24. Web site:
  25. Web site: NASA – NSSDCA – Spacecraft – Details . 18 July 2022 . 24 May 2022 . https://web.archive.org/web/20220524213348/https://nssdc.gsfc.nasa.gov/nmc/spacecraft/display.action?id=PRIME-1 . live .
  26. Web site: NASA Selects Intuitive Machines to Land Water-Measuring Payload on the Moon. Brown. Katherine. NASA. 16 October 2020. 15 November 2020. 18 October 2020. https://web.archive.org/web/20201018054728/https://www.nasa.gov/press-release/nasa-selects-intuitive-machines-to-land-water-measuring-payload-on-the-moon/. live.
  27. Web site: 2021-04-07 . The ILO Mission – ILOA Hawai'i . 2023-09-22 . en-US . 3 November 2021 . https://web.archive.org/web/20211103082627/https://iloa.org/the-ilo-mission/ . live .
  28. Web site: Lunar Services – Getting Around – Extreme Lunar Surface Mobility. Intuitive Machines. 22 June 2021. 28 June 2021. https://web.archive.org/web/20210628060759/https://www.intuitivemachines.com/copy-of-leadership-partners. dead.
  29. Web site: Intuitive Machines to Deploy and Operate First Lunar Communication Satellite in 2022. Intuitive Machines. 21 June 2021. 22 June 2021. 21 June 2021. https://web.archive.org/web/20210621183004/https://www.intuitivemachines.com/post/intuitive-machines-to-deploy-and-operate-first-lunar-communication-satellite-in-2022. live.
  30. Web site: IM-2 South Pole Mission Adds Secondary Rideshare Spaceflight Inc.. Intuitive Machines. 18 August 2021. 18 August 2021. 18 August 2021. https://web.archive.org/web/20210818204837/https://www.intuitivemachines.com/post/im-2-south-pole-mission-adds-secondary-rideshare-spaceflight-inc. live.
  31. Web site: Spaceflight Inc announces rideshare mission to the moon and geostationary orbit. nasaspaceflight.com. 15 September 2021. 15 September 2021. 14 September 2021. https://web.archive.org/web/20210914214310/https://www.nasaspaceflight.com/2021/09/spaceflight-inc-rideshare-moon-geostationary/. live.
  32. Web site: Advacam – MiniPIX TPX3 Space . 2 November 2023 . 1 November 2023 . https://web.archive.org/web/20231101094836/https://advacam.com/camera/minipix-space/ . live .
  33. Web site: LSU's Tiger Eye-1 to Monitor Radiation Environment in Deep Space . 2 November 2023 . 6 July 2022 . https://web.archive.org/web/20220706011244/https://lsu.edu/research/news/2021/0504-tiger-eye-1.php . live .
  34. Web site: Johnson . Arianna . 2022-11-09 . MIT Will Return To The Moon For The First Time Since Apollo, Thanks To This Space Startup . 2024-04-30 . Forbes.
  35. Web site: Thorbecke . Catherine . 2020-12-05 . NASA will pay a firm $1 to go to the moon and get a sample . 2024-04-30 . ABC News.
  36. Web site: An inside look at Nokia's Moon mission - images . 2024-04-30 . Nokia.
  37. Web site: 2023-07-25 . An inside look at Nokia's Moon mission . 2024-04-30 . Nokia.
  38. Web site: Bantock . Jack . 2024-04-24 . Streaming and texting on the Moon: Nokia and NASA are taking 4G into space CNN Business . 2024-04-27 . CNN . en.
  39. Web site: Waldek . Stefanie . 2024-04-30 . Private moon lander will carry Nokia's 4G cell network to the lunar surface this year . 2024-04-30 . Space.com.
  40. Web site: NASA Payloads for (CLPS PRISM) CP-11 – Intuitive Machines Nova-C Lander . NASA . 3 March 2024 . 27 February 2024 . https://web.archive.org/web/20240227025132/https://science.nasa.gov/lunar-science/clps-deliveries/cp-11/ . live .
  41. Web site: NASA Selects Intuitive Machines to Deliver 4 Lunar Payloads in 2024 . . 17 November 2021 . 17 November 2021 . 3 October 2023 . https://web.archive.org/web/20231003234537/https://www.intuitivemachines.com/post/nasa-selects-intuitive-machines-to-deliver-4-lunar-payloads-in-2024 . live .
  42. Web site: Three-peat: Intuitive Machines Selects SpaceX Falcon 9 Rocket for Third Moon Mission. Intuitive Machines. 10 August 2021. 10 August 2021. 12 February 2022. https://web.archive.org/web/20220212224827/https://www.intuitivemachines.com/post/three-peat-intuitive-machines-selects-spacex-falcon-9-rocket-for-third-moon-mission. live.
  43. NASA Selects Intuitive Machines for New Lunar Science Delivery . . 17 November 2021 . 17 November 2021 . 17 November 2021 . https://web.archive.org/web/20211117212728/https://www.nasa.gov/press-release/nasa-selects-intuitive-machines-for-new-lunar-science-delivery/ . live .
  44. https://www.nasa.gov/news-release/nasa-selects-intuitive-machines-for-new-lunar-science-delivery/ NASA Selects Intuitive Machines for New Lunar Science Delivery
  45. Web site: Lunar Vertex: Solving Mysteries Swirling Around the Moon's Magnetic Regions Johns Hopkins University Applied Physics Laboratory . 2024-07-03 . www.jhuapl.edu . en.
  46. Web site: NASA, Intuitive Machines Moon Mission Update . . 28 February 2024 . 28 February 2024 . https://web.archive.org/web/20240228201630/https://www.youtube.com/live/xa2n2-_hLPM?si=yT9BydDyM8WZYQqS . live .
  47. Web site: Innovative Partnership Tests Fuels of the Future. 3 March 2012. NASA. 13 October 2009. 17 September 2011. https://web.archive.org/web/20110917140027/http://www.nasa.gov/mission_pages/constellation/main/lox_methane_engine.html. dead.
  48. https://web.archive.org/web/20151002071438/http://www.telegraph.co.uk/news/science/science-video/9466145/Nasas-new-Mars-landing-craft-Morpheus-bursts-into-flames-on-take-off.html Nasa's new Mars landing craft Morpheus bursts into flames on take-off
  49. Web site: IM-1, Houston We Have a Podcast . NASA . 9 Feb 2024 . 9 February 2024 . 13 February 2024 . https://web.archive.org/web/20240213032549/https://www.nasa.gov/podcasts/houston-we-have-a-podcast/im-1/ . live .
  50. Web site: Neal . Mihir . Kanayama . Lee . Intuitive Machines adds third mission following first lunar landings in 2022 . . 13 August 2021 . 23 February 2024 . 23 February 2024 . https://web.archive.org/web/20240223235833/https://www.nasaspaceflight.com/2021/08/intuitive-machines-im-3/ . live .
  51. Web site: Foust . Jeff . Intuitive Machines seeks to take over NASA's VIPER lunar rover . . 13 August 2024 . 13 August 2024.