Interstate 73 in North Carolina explained

State:NC
Type:I
Route:73
Map Custom:yes
Map Notes:I-73 highlighted in red; future sections in blue; unbuilt sections in orange
Established:1997
Length Mi:101.1
Length Round:1
Length Ref:[1]
Direction A:South
Direction B:North
Terminus A: near Ellerbe
Junction:
Terminus B: near Stokesdale
Counties:Richmond, Montgomery, Randolph, Guilford, Rockingham
Previous Type:NC
Previous Route:72
Next Type:NC
Next Route:73

Interstate 73 (I-73) is a partially completed Interstate Highway in the US state of North Carolina, traversing the state from south of Ellerbe to near Summerfield through Asheboro and Greensboro. When completed, it will continue south toward Myrtle Beach, South Carolina, and north to Price, North Carolina at the Virginia-North Carolina border.

Route description

, I-73 begins south of Ellerbe, in concurrency with I-74 and U.S. Highway 220 (US 220), to north of Asheboro. I-73 and I-74 travel north through northern Richmond County and into eastern Montgomery County. In Montgomery County, the Interstates pass between the county's eastern border and the Uwharrie National Forest. The freeway enters Randolph County and passes just west of Asheboro. In Randleman, I-74 splits northwest toward High Point and Winston-Salem. North of the I-74 split, I-73 passes over Randleman Lake, a reservoir formed by the blocking of the Deep River and passes into Guilford County. Entering Greensboro, it ends its concurrency with US 220 as it goes northwest along the Greensboro Urban Loop with US 421 after a brief parallel with I-85. At its connection with I-40, US 421 continues north (or geographically west) with I-40 to Winston-Salem, while I-73 continues and I-840 begins. At the Bryan Boulevard exit, I-73 separates from I-840, the latter continuing northeast along the loop. Meanwhile, I-73 turns westward, passing Piedmont Triad International Airport and continuing until it crosses NC 68. The road then resumes its northward direction, stretching 8miles before reconverging with US 220 near the Haw River.[2]

History

Authorized by the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), I-73 was established as a north–south high-priority corridor from Charleston, South Carolina, to Detroit, Michigan.[3] [4]

In North Carolina, because several U.S. Highways were already planned for improvements in the central Piedmont region, I-73 was initially aligned to go through Rockingham, Asheboro, High Point, Winston-Salem, and Mount Airy.[5] The route through High Point was approved in May 1993.[6] However, in November 1993, an organization called Job Link, made up of business leaders from northern North Carolina and southern Virginia, wanted a major highway to connect Roanoke with the Greensboro area. It could be I-73, the group said, but did not have to be.[7] In April 1995, John Warner, who chaired the Senate subcommittee which would select the route of I-73, announced his support for the Job Link proposal. This distressed Winston-Salem officials who were counting on I-73, though Greensboro had never publicly sought the road. But an aide to US Senator Lauch Faircloth said the 1991 law authorizing I-73 required the road to go through Winston-Salem. Faircloth got around this requirement, though, by asking Warner to call the highway to Winston-Salem I-74.[8] In May, Warner announced plans to propose legislation that made the plan for two Interstates official.[9]

When I-73 crossed a border between two states, the federal law authorizing the road required that the two states agree that their sections meet. Originally, both Carolinas selected a route running south from Rockingham. However, North Carolina had more money to spend on roads,[10] and, on May 10, 1995, the US Senate Environment and Public Works Committee approved North Carolina's plan for I-73 to run eastward to the coast and enter South Carolina at North Myrtle Beach.[11] Later that year, officials in both states agreed that I-73 would enter South Carolina south of Rockingham and that the other highway would be I-74. This raised the possibility of I-73 bypassing the Myrtle Beach area entirely, since I-74 would run to the Myrtle Beach area.[12]

The next section to be completed and signed I-73 was the 7.5miles southwestern section of the Greensboro Urban Loop, in concurrency with I-40, in February 2008. The concurrency later changed to US 421 in September of same year (signage corrected by July 2009).[13] [14] [15]

On July 11, 2012, NCDOT gave final approval an extension of I-73 from I-85 to Asheboro to be designated as part of its network.[16] A contract to change the Future I-73 signs to I-73 shields and replace current exit signage with Interstate standard ones was let on December 11, 2012.[17] In February 2013, work crews began converting a 70miles stretch of signage for I-73 work was completed in December 2013.[18]

Construction began in April 2014 on I-73 from NC 68, near Piedmont Triad International Airport, to US 220 near the Haw River.[19]

Future

I-73 from the South Carolina state line to US 74/NC 38 interchange is being planned and paid for by the South Carolina Department of Transportation (SCDOT). Environmental studies were completed in 2011, with a route that includes an interchange at Ghio Road and welcome centers at the state line. The time frame when construction will begin is unknown at this time.[20] [21]

The Western Rockingham Bypass, from the US 74/US 74 Bus. interchange to US 220, near Ellerbe, has all right-of-way purchases completed along the proposed route. Construction on a 3.724miles section, along US 220 (south of Ellerbe), began in March 2014; with a contracted amount of $49.8 million (equivalent to $ in), and was completed in April 2018. The remaining sections of the new bypass were scheduled to start construction by late 2017; however, under reprioritization of construction projects announced in 2014, they were first removed from the list of projects to be started through 2024[22] On January 9, 2019, it was announced that the North Carolina State Transportation Improvement Program for 2020 to 2029 included connecting I-73 with US 74 six years sooner than planned.[23] A $146.1-million (equivalent to $ in) contract was awarded for the 7.2miles of four-lane freeway with "substantial completion" by late 2023.[24] As of March 2022, the completion date was 2024.[25]

The extension of I-73 to the Virginia state line was listed in the NCDOT 2024-2033 State Transportation Improvement, although it is not fully funded.[26]

Notes and References

  1. Web site: Kevin . Adderly . January 30, 2018 . Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways as of December 31, 2017 . Federal Highway Administration . Route Log and Finder List . September 24, 2018 .
  2. News: Portion of I-73 in Guilford County opening to drivers . . May 17, 2017 . May 20, 2017 .
  3. News: Jack . Scism . New Interstates Likely Impossible Dream . News & Record . Greensboro, NC . June 9, 1991 . E1 . 0747-1858 .
  4. Web site: Stefan . Natzke . Mike . Neathery . Kevin . Adderly . June 18, 2012 . High Priority Corridors . National Highway System . . August 26, 2012 .
  5. News: Jack . Scism . Coming Soon—to a Highway Near You—I-73 . News & Record . Greensboro, NC . January 3, 1993 . E1 . 0747-1858 .
  6. News: Kelly . Thompson . Interstate to Run Through Triad Detroit to Charleston, SC . News & Record . Greensboro, NC . May 15, 1993 . B2 . 0747-1858 .
  7. News: Helen . Lounsbury . Road to Roanoke Vital, Group Says Lobbying for New Interstate . News & Record . Greensboro, NC . November 11, 1993 . B3 . 0747-1858 .
  8. News: Justin . Catanoso . New Proposal for I-73 Stirs Triad Rivalry . News & Record . Greensboro, NC . April 14, 1995 . B1 . 0747-1858 .
  9. News: Justin . Catanoso . New Interstates May Cross Triad . News & Record . Greensboro, NC . May 2, 1995 . A1 . 0747-1858 .
  10. News: John . Monk . Despite S.C. Objections, N.C. Prepares I-73 Link . The State . Columbia, SC . April 11, 1995 . B5 .
  11. News: Charles . Pope . I-73 Rolls Through Angry Thurmond's Roadblocks . The State . Columbia, SC . May 11, 1995 . B1 .
  12. News: Mike . Soraghan . Carolinas Make a Deal on Routes of New Interstates . The State . Columbia, SC . June 17, 1995 . B5 .
  13. News: Bruce . Siceloff . I-40 Bypass Opens in Greensboro . . Raleigh, NC . February 21, 2008 . b5 . 11750106 .
  14. News: Taft . Wireback . old I- 40 gets back on track . . Greensboro, NC . September 16, 2008 . A1 . 0747-1858 .
  15. News: Tricia L. . Nadolny . Mapping by car . News & Record . Greensboro, NC . July 31, 2009 . A1 . 0747-1858 .
  16. Web site: I-73 Route Change (2012-07-11) . North Carolina Department of Transportation . July 11, 2012 . February 23, 2012 .
  17. Web site: North Carolina Department of Transportation . TIP No. I-5329 (Contract DH00095) Upgrade signs to interstate standards along I-73/74 from I-85 in Guilford County to south of Ellerbe in Richmond County. Project Letting . Division 8 . December 11, 2012 .
  18. Web site: Work on the Signing of I-73 between Greensboro and Ellerbe starts Monday . North Carolina Department of Transportation . February 20, 2013 . February 23, 2012 .
  19. Web site: North Carolina Department of Transportation . Project #R-2413 . Project Details . North Carolina Department of Transportation . August 26, 2012 . https://web.archive.org/web/20111029193045/http://www.ncdot.gov/projects/search/details.html#id=1697 . October 29, 2011 . dead.
  20. South Carolina Department of Transportation . I-73 Northern Map . PDF . South Carolina Department of Transportation . Wallace . October 24, 2012 .
  21. Web site: North Carolina Department of Transportation . Project #I-4923 . Project Details . North Carolina Department of Transportation . August 27, 2012 . https://web.archive.org/web/20111029193045/http://www.ncdot.gov/projects/search/details.html#sfr=127 . October 29, 2011 . dead.
  22. Web site: North Carolina Department of Transportation . Project #R-3421 . Project Details . North Carolina Department of Transportation . August 26, 2012 . https://web.archive.org/web/20111029193045/http://www.ncdot.gov/projects/search/details.html#id=2188 . October 29, 2011 . dead.
  23. News: Bypass project accelerated: Bypass project around Rockingham accelerated from 2026 to 2020. Stone. Gavin. Richmond County Daily Journal. January 9, 2019.
  24. News: NCDOT awards contract for Rockingham bypass. Richmond County Daily Journal. November 6, 2019.
  25. Web site: NCDOT Constructing Interstate Bypass at Rockingham to Reduce Congestion. Hussain. Ruksana. Construction equipment Guide. March 3, 2022. September 4, 2022.
  26. Web site: North Carolina Department of Transportation . Current 2024-2033 STIP . North Carolina Department of Transportation . October 20, 2023 .