Assembly of the International Space Station explained

The process of assembling the International Space Station (ISS) has been under way since the 1990s. Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.

The ISS has a pressurized volume of approximately, a mass of approximately, approximately 100 kilowatts of power output, a truss long, modules long, and a crew of seven.[1] Building the complete station required more than 40 assembly flights. As of 2020, 36 Space Shuttle flights delivered ISS elements. Other assembly flights consisted of modules lifted by the Falcon 9, Russian Proton rocket or, in the case of Pirs and Poisk, the Soyuz-U rocket.

Some of the larger modules include:

Logistics

The space station is located in orbit around the Earth at an altitude of approximately 410km (260miles), a type of orbit usually termed low Earth orbit (the actual height varies over time by several kilometers due to atmospheric drag and reboosts). It orbits Earth in a period of about 90 minutes; by August 2007 it had completed more than 50,000 orbits since launch of Zarya on 20 November 1998.

A total of 14 main pressurized modules were scheduled to be part of the ISS by its completion date in 2010.[2] A number of smaller pressurized sections will be adjunct to them (Soyuz spacecraft (permanently 2 as lifeboats – 6 months rotations), Progress transporters (2 or more), the Quest and Pirs airlocks, as well as periodically the H-II Transfer Vehicle).

The US Orbital Segment was completed in 2011 after the installation of the Alpha Magnetic Spectrometer during the STS-134 mission. The Russian Orbital Segment assembly has been on an indefinite hiatus since the installation of the Rassvet module in 2010 during the STS-132 mission. The Rassvet module on the ISS right now was originally supposed to be the on-ground dynamic testing mock-up of the now-cancelled Science Power Platform. The Nauka science laboratory module contains new crew quarters, life support equipment that can produce oxygen and water, and a new galley. The Nauka was originally supposed to be delivered to the ISS in 2007 but cost overruns and quality control problems delayed it for over a decade. The Nauka module finally launched in July 2021 and docked to the nadir port of Zvezda module after several days of free flight [3] followed by the Prichal which launched on 24 November 2021.

There are plans to add 2 or 3 more modules that would attach to Prichal during the mid-2020s. Adding more Russian modules will help the Zvezda module greatly because Zvezda's originally installed central command computers no longer work (three ThinkPad laptops are now the Zvezda's central command computers) and its Elektron oxygen generators are not replaceable and failed again for a short time in 2020 after multiple malfunctions throughout their history.[4] In Russian modules all the hardware is launched with the equipment permanently installed. It is impossible to replace hardware like in the US Orbital Segment with its very wide 51 inch (105 cm) hatch openings between modules. This potential problem with the Zvezda was made apparent when in October 2020 the toilet, oven, and Elektron all malfunctioned at the same time and the cosmonauts onboard had to make emergency repairs.[5]

The ISS, when completed, will consist of a set of communicating pressurized modules connected to a truss, on which four large pairs of photovoltaic modules (solar panels) are attached. The pressurized modules and the truss are perpendicular: the truss spanning from starboard to port and the habitable zone extending on the aft-forward axis. Although during the construction the station attitude may vary, when all four photovoltaic modules are in their definitive position the aft-forward axis will be parallel to the velocity vector.[6]

In addition to the assembly and utilization flights, approximately 30 Progress spacecraft flights are required to provide logistics until 2010. Experimental equipment, fuel and consumables are and will be delivered by all vehicles visiting the ISS: the SpaceX Dragon, the Russian Progress, the European ATV and the Japanese HTV, and space station downmass will be carried back to Earth facilities on the Dragon.[7]

Columbia disaster and changes in construction plans

Disaster and consequences

After the Space Shuttle Columbia disaster on 1 February 2003, there was some uncertainty over the future of the ISS. The subsequent two and a half-year suspension of the U.S. Space Shuttle program, followed by problems with resuming flight operations in 2005, were major obstacles.

The Space Shuttle program resumed flight on 26 July 2005, with the STS-114 mission of Discovery. This mission to the ISS was intended both to test new safety measures implemented since the Columbia disaster and deliver supplies to the station. Although the mission succeeded safely, it was not without risk; foam was shed by the external tank, leading NASA to announce future missions would be grounded until this issue was resolved.

Between the Columbia disaster and the resumption of Shuttle launches, crew exchanges were carried out solely using the Russian Soyuz spacecraft. Starting with Expedition 7, two-astronaut caretaker crews were launched in contrast to the previously launched crews of three. Because the ISS had not been visited by a shuttle for an extended period, a larger than planned amount of waste accumulated, temporarily hindering station operations in 2004. However Progress transports and the STS-114 shuttle flight took care of this problem.

Changes in construction plans

Many changes were made to the originally planned ISS, even before the Columbia disaster. Modules and other structures were cancelled or replaced, and the number of Shuttle flights to the ISS was reduced from previously planned numbers. However, more than 80% of the hardware intended to be part of the ISS in the late 1990s was orbited and is now part of the ISS's configuration.

During the shuttle stand-down, construction of the ISS was halted and the science conducted aboard was limited due to the crew size of two, adding to earlier delays due to Shuttle problems and the Russian space agency's budget constraints.

In March 2006, a meeting of the heads of the five participating space agencies accepted the new ISS construction schedule that planned to complete the ISS by 2010.[8]

As of May 2009, a crew of six has been established following 12 Shuttle construction flights after the second "Return to Flight" mission STS-121. Requirements for stepping up the crew size included enhanced environmental support on the ISS, a second Soyuz permanently docked on the station to function as a second 'lifeboat', more frequent Progress flights to provide double the amount of consumables, more fuel for orbit raising maneuvers, and a sufficient supply line of experimental equipment. As of November 2020, the crew capacity has increased to seven due to the launch of Crew Dragon by SpaceX, which can carry 4 astronauts to the ISS.

Later additions included the Bigelow Expandable Activity Module (BEAM) in 2016, and numerous Russian components are planned as part of the in-orbit construction of OPSEK.

Assembly sequence

The ISS is made up of 16 pressurized modules: six Russian modules (Zarya, Zvezda, Poisk, Rassvet, Nauka, and Prichal), eight US modules (BEAM,[9] Leonardo, Harmony, Quest, Tranquility, Unity, Cupola, and Destiny), one Japanese module (Kibō) and one European module (Columbus).

At least one Russian pressurized module (Pirs) is deorbited till now.[10]

Although not permanently docked with the ISS, Multi-Purpose Logistics Modules (MPLMs) formed part of the ISS during some Shuttle missions. An MPLM was attached to Harmony (initially to Unity) and was used for resupply and logistics flights.

Spacecraft attached to the ISS also extend the pressurized volume. At least one Soyuz spacecraft is always docked as a 'lifeboat' and is replaced every six months by a new Soyuz as part of crew rotation. Table below shows the sequence in which these components were added to the ISS.[11] Decommissioned and deorbited Modules are shown in gray.

ElementAssembly
flight
Launch
date
Launch
vehicle
LengthDiameterMassIsolated ViewStation View
Zarya (FGB)1A/R1998-11-20Proton-K
Unity (Node 1)2A1998-12-04 (STS-88)
PMA-1
PMA-2
Zvezda (Service Module)1R2000-07-12Proton-K
Z1 Truss3A2000-10-11 (STS-92)
PMA-3
P6 Truss & Solar Arrays4A2000-11-30 (STS-97) deployed
Destiny (US Laboratory)5A2001-02-07 (STS-98)
ESP-15A.12001-03-08 (STS-102)
Canadarm2 (SSRMS)6A2001-04-19 (STS-100)
Quest (Joint Airlock)7A2001-07-12 (STS-104)
Pirs (Docking Compartment)4R2001-09-14Soyuz-U (Progress M-SO1)
S0 Truss[12] 8A2002-04-08 (STS-110)
Mobile Base SystemUF22002-06-05 (STS-111)
S1 Truss9A2002-10-07 (STS-112)
P1 Truss11A2002-11-23 (STS-113)
ESP-2LF12005-07-26 (STS-114)
P3/P4 Truss & Solar Arrays[13] 12A2006-09-09 (STS-115)
P5 Truss[14] 12A.12006-12-09 (STS-116)
S3/S4 Truss & Solar Arrays13A2007-06-08 (STS-117)
S5 Truss13A.12007-08-08 (STS-118)
ESP-3
Harmony (Node 2)10A2007-10-23 (STS-120)7.2 m (24 ft)4.4 m (14 ft)14,300 kg (31,500 lb)
Relocation of
P6 Truss
deployed
Columbus (European Laboratory)[15] 1E2008-02-07 (STS-122)7 m (23 ft)4.5 m (15 ft)12,800 kg (28,219 lb)
Dextre (SPDM)1J/A2008-03-11 (STS-123)
Experiment Logistics Module (ELM)4.21 m (13.8 ft)4.39 m (14.4 ft)8,386 kg (18,488 lb)
JEM Pressurized Module (JEM-PM)[16] [17] 1J2008-05-31 (STS-124)11.19 m (36.7 ft)4.39 m (14.4 ft)15,900 kg (35,100 lb)
JEM Remote Manipulator System (JEMRMS)
S6 Truss & Solar Arrays15A2009-03-15 (STS-119) deployed
Kibo Exposed Facility (JEM-EF)2J/A2009-07-15 (STS-127)
Poisk (MRM-2)[18] [19] 5R2009-11-10Soyuz-U (Progress M-MIM2)
ELC-1ULF32009-11-16 (STS-129)
ELC-2
Tranquility (Node 3)20A2010-02-08 (STS-130)6.706 m (22.00 ft)4.48 m (14.7 ft)19,000 kg (42,000 lb)
Cupola
Rassvet (MRM-1)[20] ULF42010-05-14 (STS-132)
Nauka Science Airlock
Nauka RTOd Radiator
ERA portable workpost
Leonardo (PMM)ULF52011-02-24 (STS-133)6.6 m (22 ft)4.57 m (15.0 ft)4,082 kg (8,999 lb)
ELC-4
AMS-02ULF62011-05-16 (STS-134)
OBSS
ELC-3
HRSGFCRS SpX-22013-03-13Falcon 9 (SpaceX CRS-2)
BEAM[21] CRS SpX-82016-04-08Falcon 9 (SpaceX CRS-8)
IDA-2[22] [23] CRS SpX-92016-07-18Falcon 9 (SpaceX CRS-9)
IDA-3[24] CRS SpX-182019-07-25Falcon 9 (SpaceX CRS-18)
Bartolomeo[25] CRS SpX-202020-03-06Falcon 9 (SpaceX CRS-20).
Nanoracks Bishop AirlockCRS SpX-212020-12-06Falcon 9 (SpaceX CRS-21)
iROSA 1 and 2CRS SpX-222021-06-03Falcon 9 (SpaceX CRS-22)
Nauka (MLM-U)[26] 3R2021-07-21Proton-M
European Robotic Arm
Nauka SSPA-GM temporary docking adapter
MLM Means of Attachment of Large payloads
(LCCS Part)
79P2021-10-28Soyuz 2.1a (Progress MS-18)
Prichal6R2021-11-24Soyuz 2.1b (Progress M-UM)
MLM Means of Attachment of Large payloads
(SCCS Part)
82P2022-10-26Soyuz 2.1a (Progress MS-21)
iROSA 3 and 4CRS SpX-262022-11-26Falcon 9 (SpaceX CRS-26)
iROSA 5 and 6CRS SpX-282023-06-05Falcon 9 (SpaceX CRS-28)

Future elements

Cancelled modules

Unused modules

The following module was built, but has not been used in future plans for the ISS as of January 2021.

Cost

The ISS is credited as the most expensive item ever built, costing around $150 billion (USD),[36] making it more expensive than Skylab (costing US$2.2 billion) [37] and Mir (US$4.2 billion).[38]

See also

External links

Media articles

Notes and References

  1. Web site: 4 Astronauts Aboard SpaceX Crew Dragon Successfully Dock With Space Station. November 17, 2020. www.npr.org. August 16, 2021.
  2. Web site: Consolidated Launch Manifest. 2006-07-15. NASA. https://web.archive.org/web/20060707132806/http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html. 7 July 2006 . live.
  3. Web site: Новости. Подготовка "Науки" — идет четвёртый стартовый день. 2021-11-02. www.roscosmos.ru.
  4. Web site: Oxygen supply system deactivated in Russian ISS section due to malfunction . 2023-01-23 . TASS.
  5. https://www.themoscowtimes.com/2020/10/20/crew-in-no-danger-after-iss-issues-resolved-russia-a71799 Retrieved 15 December 2020
  6. Web site: What are the ISS attitudes?. 2006-09-11. Flash. NASA. https://web.archive.org/web/20060902031603/http://spaceflight.nasa.gov/station/flash/iss_attitude.html. 2 September 2006 . dead.
  7. Black. Charles . When Dragon made commercial spaceflight a reality. SEN. 24 December 2012 . 2012-12-26 . [Dragon's] ability to return goods is currently unique because all the other regular supply ships – Europe's Automated Transfer Vehicle (ATV), Japan's HTV (or "Kounotori") and Russia's Progress – all burn up during controlled re-entry..
  8. Web site: Coppinger . Rob . 3 March 2006 . NASA commits to Shuttle missions to International Space Station . FlightGlobal . 16 September 2006 .
  9. https://arstechnica.com/science/2017/10/nasa-tries-an-inflatable-room-on-the-space-station-likes-it/ Retrieved 27 November 2017.
  10. Web site: Gebhardt. Chris. Farewell, Pirs; ISS module decommissioned, destructively reentered. NASASpaceFlight.com. 25 July 2021. 9 April 2022.
  11. Web site: Reference Guide to the International Space Station. September 2015. NASA. 2019-06-08.
  12. Web site: Space Station Assembly: Integrated Truss Structure. NASA. 2007-12-02. https://web.archive.org/web/20071207081810/http://www.nasa.gov/mission_pages/station/structure/elements/its.html. 7 December 2007 . live.
  13. Web site: P3 and P4 to expand station capabilities, providing a third and fourth solar array. Boeing. July 2006. 2007-12-02.
  14. Web site: STS-118 MISSION OVERVIEW: BUILD THE STATION…BUILD THE FUTURE. NASA PAO. 2007-12-02. July 2007. https://web.archive.org/web/20071201130531/http://www.nasa.gov/pdf/182728main_STS-118_Press_Kit.pdf. 1 December 2007 . live.
  15. Web site: Columbus laboratory. ESA. 2009-03-06. 10 January 2009. https://web.archive.org/web/20090330191925/http://www.esa.int/esaHS/ESAAYI0VMOC_iss_0.html. 30 March 2009 . live.
  16. Web site: About Kibo . JAXA . 2009-03-06 . 25 September 2008 . dead . https://web.archive.org/web/20090310171550/http://kibo.jaxa.jp/en/about/ . 10 March 2009 .
  17. Web site: Kibo Japanese Experiment Module. NASA. 23 November 2007. 2008-11-22. https://web.archive.org/web/20081023071601/http://www.nasa.gov/mission_pages/station/structure/elements/jem.html. 23 October 2008 . live.
  18. Web site: Docking Compartment-1 and 2. RussianSpaceWeb.com. Anatoly . Zak. 26 March 2009. https://web.archive.org/web/20090210130224/http://www.russianspaceweb.com/iss_dc.html. 10 February 2009 . live.
  19. Web site: NASASpaceflight.com. Chris . Bergin. 9 November 2009. 10 November 2009. Russian module launches via Soyuz for Thursday ISS docking. https://web.archive.org/web/20091113190354/http://www.nasaspaceflight.com/2009/11/live-russian-module-launch-towards-iss-on-soyuz/. 13 November 2009 . live.
  20. NASA Extends Contract With Russia's Federal Space Agency . NASA. 9 April 2007. 2007-06-15. https://web.archive.org/web/20070623120556/http://www.nasa.gov/home/hqnews/2007/apr/HQ_C07-18_Roscosmos.html. 23 June 2007 . live.
  21. Web site: NASA to Test Bigelow Expandable Module on Space Station. 16 January 2013. NASA. 16 January 2013.
  22. News: SpaceX Conducts Second Ground Landing After Launch Of CRS-9 Dragon To ISS . Jason Rhian . 18 July 2016 . Spaceflight Insider .
  23. News: Harwood. William. Spacewalkers attach docking adapter to space station for commercial vehicles. 20 August 2016. Spaceflight. 19 August 2016.
  24. Web site: Spacewalkers Complete Installation of Second Commercial Docking Port – Space Station. blogs.nasa.gov.
  25. Successful launch for Airbus' Bartolomeo . . 9 March 2020 . 4 January 2021.
  26. Web site: FGB-based Multipurpose Lab Module (MLM-U). https://web.archive.org/web/20070927002737/http://www.khrunichev.ru/khrunichev_eng/live/full_mks.asp?id=13190. 27 September 2007. Khrunichev State Research and Production Space Centre. 2008-10-31.
  27. Web site: NASA to upgrade space station solar arrays. 12 January 2021. SpaceNews.
  28. Web site: New solar arrays ready to upgrade International Space Station's power grid. Spaceflight Now. 2 June 2021. 19 August 2022.
  29. Web site: Davenport . Justin . ISS finishes initial iROSA upgrade with two EVAs this month . NASASpaceFlight.com . June 15, 2023 . June 18, 2023.
  30. Web site: Axiom Commercial Space Station. Axiom Space.
  31. Web site: Nautilus X Holderman - 1 26 11 | PDF | Flight Controller | International Space Station. Scribd.
  32. Web site: Научно-энергетический модуль запустят на "Ангаре" с Восточного . The Science Power Module will be launched on an Angara from Vostochny . . 24 April 2021 . 26 April 2021 . ru.
  33. Web site: Zak . Anatoly . Russian Orbital Service Station, ROSS . RussianSpaceWeb . 16 April 2021 . 26 April 2021.
  34. Web site: ISS Managers review long-term configuration of International Space Station. Pete. Harding. 20 December 2010.
  35. Web site: Spaceflight Now | Breaking News | Test article could facilitate space station applications. spaceflightnow.com.
  36. Web site: Is The International Space Station The Most Expensive Single Item Ever Built?. 2014-08-27. Science 2.0. 2018-05-03.
  37. Web site: The Space Review: Costs of US piloted programs. www.thespacereview.com. 2018-05-03.
  38. News: Russians Find Pride, and Regret, in Mir's Splashdown. Tyler. Patrick E.. 2001-03-24. The New York Times. 2018-05-03. 0362-4331.