Type: | Rapid transit |
System: | Ürümqi Metro |
Status: | Operational |
Locale: | Ürümqi, Xinjiang, China |
Stations: | 21 |
Operator: | Ürümqi Metro Group Corporation Ltd |
Character: | Underground |
Stock: | 6-car Type A |
Linelength: | 27.6151NaN1 |
Tracks: | 2 |
Speed: | 80 km/h |
Map State: | collapsed |
Line 1 of the Ürümqi Metro is a subway line in Ürümqi.
The northern section from to, was opened on 25 October 2018. The southern section from Balou to Santunbei opened on 28 June 2019.[1]
Line 1 has a total length of 27.615 km and 21 stations.[2] It is fully underground.
The 27.615 kilometer long, 21 station line commenced construction in March 2014.[3] Tunneling works were completed in December 2017. The northern section of Line 1 (16.5 km) opened on 25 October 2018. The southern section of Line 1 (11.1 km[4]) opened on 28 June 2019.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
International Airport — Balou | 25 October 2018 | 16.51NaN1 | 12 | Phase 1 (northern section) | |
Balou — Santunbei | 28 June 2019 | 11.11NaN1 | 9 | Phase 1 (southern section) |
Station name | Transfer | Distance | Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | Uyghur | |||||
0.00 | 0.00 | Tianshan | |||||
0.66 | 0.66 | ||||||
1.24 | 1.90 | ||||||
1.49 | 3.39 | ||||||
0.95 | 4.34 | ||||||
1.29 | 5.63 | Shuimogou | |||||
1.09 | 6.72 | ||||||
1.27 | 7.99 | ||||||
1.15 | 9.14 | ||||||
1.55 | 10.69 | Saybag/Xinshi | |||||
1.08 | 11.77 | Xinshi | |||||
0.90 | 12.67 | ||||||
1.49 | 14.16 | ||||||
1.22 | 15.38 | ||||||
1.23 | 16.61 | ||||||
1.18 | 17.79 | ||||||
1.24 | 19.03 | ||||||
1.35 | 20.38 | ||||||
1.21 | 21.59 | ||||||
2.70 | 24.29 | ||||||
URC | 2.96 | 27.25 | |||||