Huairou–Daxing Airport intercity railway | |
Status: | Under construction |
End: | Langfang North (Phase 1) |
Open: | 2024 (Phase 1) |
Linelength: | 39.438 km (Phase 1) |
Speed: | 200 km/h |
Map State: | collapsed |
Huairou–Daxing intercity railway, formerly known as Capital Airport–Daxing Airport intercity railway connecting line, is a higher-speed railway line currently under construction. The speed will be 200 km/h.[1] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed.[2]
Phase 1 of the railway, which is currently under construction, will connect station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province. Phase 1 of the railway will be finished in 2024.[3] [4]
The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning.
Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际铁路).
Station Name | Total distance (km) | Travel Time | Transfer | Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Daxing Airport East[5] | PKX | Guangyang District, Langfang, Hebei | ||||
Lixian | < | ----> | Daxing District, Beijing | |||
Langfang West | < | ----> | Guangyang District, Langfang, Hebei | |||
Langfang Kaifaqu | < | ----> | ||||
The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.