Indonesian Aerospace Explained

Indonesian Aerospace (IAe)
Native Name:Indonesian: PT Dirgantara Indonesia (Persero)
Type:State-owned company
Industry:Aerospace and Defense
Products:Commercial Airliners
Military aircraft
Aircraft Component
Aircraft Services
Defense
Engineering
Num Employees:3,689 (2021)
Foundation:23 August 1976 (as Nurtanio Aircraft Industry (Indonesian: Industri Pesawat Terbang Nurtanio)
Location:Bandung, West Java, Indonesia
Area Served:Worldwide
Parent:PT Len Industri

Indonesian Aerospace (IAe) (Indonesian: PT Dirgantara Indonesia), is an Indonesian aerospace company involved in aircraft design and the development and manufacture of civilian and military regional commuter aircraft, and a subsidiary of state-owned electronics manufacturer . The company was formerly known as Indonesian: PT Industri Pesawat Terbang Nusantara (Persero) (IPTN;).[1] [2] It was expanded from a research and industrial facility under the auspices of the Indonesian Air Force, namely Indonesian: Lembaga Industri Penerbangan Nurtanio (LIPNUR) or Nurtanio Aviation Industry Institute.[3]

Established in 1976 as a state owned company, it has developed its capability as an aircraft manufacturer and diversified into other areas, such as telecommunication, automotive, maritime, information technology, oil & gas, control & automation, military, simulation technology, industrial turbine, and engineering services.

History

Pioneering

Though aircraft production in Indonesia existed before independence in 1945, the National Aviation Industry was pioneered in 1946 at Yogyakarta by the formation of Planning and Construction Bureau (Indonesian: Biro Rencana dan Konstruksi) within the Indonesian Air Force. Wiweko Soepono, Nurtanio Pringgoadisurjo, and J. Sumarsono, opened a simple workshop at Magetan, near Madiun. With basic materials, gliders were designed and built – Zogling, NWG-1 (Nurtanio Wiweko Glider) among others.

In 1948, a motorised aircraft, WEL-X was built by Wiweko Soepono using a Harley Davidson engine. The small craft was registered as RI-X. This era marked the rise of several aeromodelling clubs.

The war for independence, however, halted all progress until 1953. In that year, The Experimental Section (Indonesian: Seksi Percobaan) was organised. Consisting of only 15 personnel, led by Nurtanio Pringgoadisurjo, The team built and tested three prototypes of a single-seat all metal aircraft at Andir Airport (Later renamed Husein Sastranegara International Airport) in Bandung.

On 24 April 1957, The Experimental Section graduated into The Inspection, Trial, and Production Sub-Depot (Indonesian: Sub Depot Penyelidikan, Percobaan dan Pembuatan) based on Decision Letter of Indonesian Air Force Chief of Staff number 68.

In 1958, a light training aircraft prototype named Belalang 89, or Grasshopper 89, was flown. The design was later produced as Indonesian: Belalang 90. Five Indonesian: Belalang 90 were built and used for military training. Within the same year, a sport plane, "Kunang 25", was also built and flown.

Preparation

On 1 August 1960, by the order of the Chief of Staff of the Indonesian Air Force (order #488), The Aviation Industry Preparation Agency was to be formed to establish the Indonesian aviation industry as part of national strategies on national industrial production. By 16 December 1961, the new body, known as LAPIP (Indonesian: Lembaga Persiapan Industri Penerbangan), was actively negotiating for technological transfers and contracts.

LAPIP was able to secure a joint licensing and production contract with the Polish People's Republic (through the latter's foreign trade monopoly, the Complete Industrial Facilities Export Centre (CEKOP)). Within the same year, Indonesia was producing the PZL-104 Wilga, locally named the Indonesian: Gelatik. 44 were manufactured for agriculture, transport, and aero club purposes.

In 1965, the Aircraft Industry Project Implementation Command (Indonesian: Komando Pelaksana Proyek Industri Pesawat Terbang; Indonesian: KOPELAPIP) and the Independent Aircraft Industry National Company (Indonesian: PN. Industri Pesawat Terbang Berdikari) were formed to expand and formulate specific uses of the young aviation industry.

Within the same timeline, Aviation Studies were promoted in the country's top universities. One of the first schools was founded within the machine department of the engineering faculty of the Bandung Institute of Technology by Oetarjo Diran and Liem Keng Kie.

In September 1974, Pertamina's Advanced Technology Division signed a license contract with MBB and CASA for producing Bölkow Bo 105 and CASA C.212 Aviocar.

Nurtanio Aircraft Industry

On 26 April 1976, mandated by Government Act No. 15, in Jakarta, PT Industri Pesawat Terbang Nurtanio was officially established with BJ. Habibie as the President and CEO. The infrastructure was completed and inaugurated on 23 August 1976 by President Suharto. The new body was a merger between Nurtanio Aviation Industry Institution (Indonesian: Lembaga Industri Penerbangan Nurtanio/LIPNUR) and Pertamina's Advanced Technology Division.

The name 'Nurtanio' is a tribute to Nurtanio Pringgoadisuryo, one of the first aviation pioneers in Indonesia, who designed the Sikumbang, an indigenous all metal aircraft (maiden flight: 1 August 1954). As a result of his death caused by a flight training accident on 1 March 1966, the Aviation Industry Preparation Agency was then renamed Nurtanio Aviation Industry Institution LLC (Indonesian: Lembaga Industri Penerbangan Nurtanio (Abbreviated as LIPNUR)).

Initially, IPTN manufactured the NBO 105 (MBB Bo 105) under license from MBB, followed by the NC 212 (CASA C-212 Aviocar), under license by CASA.

Nusantara Aircraft Industry

On 11 October 1985, the name Indonesian: PT Industri Pesawat Terbang Nurtanio was changed to the Indonesian: PT Industri Pesawat Terbang Nusantara or IPTN. Nusantara signifies the Indonesian 17,000 island archipelago.

The exclusion of "Nurtanio" from IPTN was due to some highly questionable accusations. One of the allegations was a personal use of company's letterhead by Nurtanio's family to appropriate some IPTN stocks. None was proven true.

Dirgantara Indonesia / Indonesian Aerospace

Following the 1997 Asian financial crisis, a major restructuring program was implemented. At its peak, in 2004, the Indonesian Aerospace reduced its payroll from 9670 to 3720. Furthermore, the 18 business divisions were reorganised into the following:

The restructuring focused on new business goals, downsizing and adaptation of man-power according to available workloads, and a pinpoint market targeting along with a concentrated business mission.

The IPTN was re-introduced as PT Dirgantara Indonesia (abbreviated DI) or Indonesian Aerospace (abbreviated IAe). IAe was officially inaugurated by the President of Indonesia, Abdurrahman Wahid, in Bandung on 24 August 2000.

On 4 July 2011, Indonesia's government said it will inject Rp.2 trillion ($234 million) to Indonesian Aerospace to keep the debt-ridden firm afloat with a view to making a joint venture with EADS. Before injection, the amount of unpaid debt to the government was Rp.1.1 trillion ($129 million).[4]

Services

Facilities

Indonesian Aerospace covers an area of 86.98 ha. The backbone of the production is sustained by 232 high tech operations. Apart from these, there are other minor high-tech facilities spread over various assembly lines, laboratories, and service & maintenance units. They are located mainly in Bandung.

Products

Indonesian Aerospace and its precursors

(PT Dirgantara Indonesia (DI) – (IAe) Indonesian Aerospace)

AURI

(Indonesian: Angkatan Udara Republik Indonesia, Depot Penjelidikan, Pertjobaan dan Pembuatan – Indonesian Air Force Research, Development, and Production Depot)

LIPNUR

(Lembaga Industri Penerbangan Nurtanio – Nurtanio Aviation Industry Institution)

IAe Aircraft production

Joint Development & production aircraft
License-built aircraft

IAe Armaments

Development projects

Indonesian Aerospace has plans to construct the N-245, designed to carry 50 passengers for about 400 kilometres in remote areas or where passenger demand is low. The design is based primarily on that of the CN-235, with body shape and tail modifications. The development cost of the aircraft has thus far reached $150 million, with an expected break even point of 50–70 aircraft sales. The aircraft is meant as a market competitor to the ATR 42 and Bombardier Dash 8 Q300.[24]

See also

External links

Notes and References

  1. Web site: PT Indonesian Aerospace [ PT Industri Pesawat Terbang Nusantara (IPTN)].
  2. Web site: Voi.co.id.
  3. Web site: Zend Framework Default Application. 14 August 2017. 16 August 2017. https://web.archive.org/web/20170816111713/http://indonesian-aerospace.com/aboutus.php?m=aboutus&t=aboutus8. dead.
  4. Web site: State Planemaker Dirgantara Indonesia Thrown Rp 2 trillion Lifeline. The Jakarta Globe. 29 July 2015. dead. https://web.archive.org/web/20120927093159/http://www.thejakartaglobe.com/home/state-planemaker-dirgantara-indonesia-thrown-rp-2-trillion-lifeline/450766. 27 September 2012. dmy-all.
  5. Web site: CN235 Family. indonesian-aerospace.com. 7 March 2021.
  6. Web site: PT. Dirgantara Indonesia (Persero). 2020-09-22. www.indonesian-aerospace.com.
  7. Web site: Indonesia certifies N219 regional turboprop. flightglobal.com. 28 December 2020. 7 March 2021.
  8. Jennifer Meszaros - ainonline.com " Indonesia's N219 On Track for 2019 Certification " ainonline, March 29, 2019.
  9. Laila Afifa - tempo.co " PT Dirgantara Indonesia to Produce First N219 Aircraft in 2020 " tempo.co, 24 August 2019.
  10. Ilyas Istianur Praditya - liputan6.com " Apa Kabar Proyek Pesawat N245 PT DI? " liputan6.com, 07 Nov 2018.
  11. Humas PTDI - indonesian-aerospace.com " PTDI Tandatangani NKB dengan Tim PINA Bappenas Terkait Fasilitasi Pembiayaan Investasi Non-Anggaran Pemerintah " indonesian-aerospace.com, Jakarta, 07 November 2018 – Humas PTDI.
  12. Reni Susanti - kompas.com " Kembangkan N219 dan N245, PT DI Dapat Kucuran 400 Juta Dollar AS " kompas.com, 07 November 2018.
  13. Web site: Perjanjian Proyek Pesawat N250 Sudah Ditandatangani. mediaindonesia.com. 11 August 2012. 7 March 2021. https://web.archive.org/web/20130105033257/http://www.mediaindonesia.com/read/2012/08/11/340047/21/2/Perjanjian-Proyek-Pesawat-N250-Sudah-Ditandatangani. 5 January 2013. id. dead.
  14. Web site: Indonesian Manufacturer RAI to Build R80 Prototype With Help From Leonardo, LAER. jakartaglobe.id. 23 February 2018. 7 March 2021.
  15. Web site: RI sending KFX jet-fighter production team to South Korea. 29 July 2015.
  16. Jon Grevatt, Bangkok - Jane's Defence Industry " KAI reaches early production milestone on KFX " Jane's 360, 18 February 2019.
  17. https://archive.today/20140215170713/http://www.defensenews.com/article/20140210/DEFREG/302100034/S-Korea-Weighs-Designs-KF-X S. Korea Weighs Designs for KF-X
  18. The Emerging Technological Trajectory of the Pacific Rim by Denis Fred Simon, page 193.
  19. Web site: PTDI to supply six ec725 choppers to air force . 10 April 2012.
  20. Web site: Eurocopter receives first main fuselage assembly from Indonesian Aerospace for EC725 & EC225 . 27 November 2013.
  21. Web site: Defence Helicopter - Shephard Media.
  22. Web site: IPTN suspended from Bell 412 production.
  23. Web site: NC212 Family. indonesian-aerospace.com. 7 March 2021.
  24. Web site: PT DI Bakal Bikin Pesawat Komersial untuk Rute Jarak Pendek . Soegeng Haryadi . 13 April 2015.