Indian Railways organisational structure explained

Indian Railways is a statutory body under the ownership of the Ministry of Railways of the Government of India that operates India's national railway system. It is headed by a Railway Board whose chairman reports to the Ministry of Railways. It is organized into separate functional groups or verticals while divided into 19 operational zones geographically. Each zone, headed by a General Manager, is semi-autonomous thus creating a matrix organization where the functional branches are under dual control.

Railway Board

In March 1905, the railway branch of the Public Works Department was transferred to the newly established railway board under the department of commerce and industry by the Indian Railway Board Act.[1] In 1908, the set up was re-organized on the recommendations of the Railway Finance Committee (1908) by constituting the Railway Board headed by a president as a separate department.[2] Pursuant to the Acworth committee's recommendations in 1921, the railway board was expanded to four members with the addition of a financial commissioner in 1924 apart from the chief commissioner, one commissioners responsible for ways and works, projects and stores and the other responsible for general administration, staff and traffic.[2] In 1929, an additional member was added to the board and was assigned the responsibility for staff, so that the member in charge of traffic could focus solely on transport and commercial matters.[3] In 1950,the railway board was re-constituted to four members with the senior-most functional member appointed the chairman of the board with no absolute over riding power.[4] [5] In October 1954, the chairman of the board was made responsible for decisions on technical and policy matters, with the status of a principal secretary to the Government of India with an additional member added.[5] The board was expanded with an additional member responsible for electrical engineering in 1972 and a further member responsible for health in 1976.[6] In 2004, the board is expanded by the introduction of two new members responsible for signalling & telecom and for stores respectively.[7] In December 2019, the Union Cabinet decided to reduce the size of the board from eight to five.[8] The chairman of the railway board reports to the Ministry of Railways and act on behalf of the ministry. The following report to the railway board:[9] [10]

Functional division

The organization is divided into separate functional groups of traction, engineering, traffic, rolling stock, signalling, materials, personnel, RPF, finance, health and safety.[11]

Zonal management

In 1944, all the railway companies in existence at the time were taken over by the Government.[12] In December 1950, the Central Advisory Committee for Railways approved the plan for re-organizing Indian Railways into six regional zones which were divided subsequently to create newer zones. As of 2024, there are 17 operational zones of Indian Railways.[13] The zones are headed by a General manager and are further sub-divided into divisions. Each division is headed by a Divisional Railway Manager (DRM), who are responsible for the operation and maintenance in the respective divisions.The 17 operational zones and their divisions are listed below. South Coast Railway zone is proposed to be created as the eighteenth zone, but is not yet operational as of 2023.[14]

!rowspan=2
Railway zoneCodeHeadquarters[15] Established[16] Route length[17] StationsDivisions[18]
kmmiles
7Southern RailwaySRChennai19515093disp=table1disp=table727[19] Chennai, Madurai, Palakkad, Salem, Thiruvananthapuram, Tiruchirappalli
8Central RailwayCRMumbai CSMT19514203.3disp=table1disp=table486[20] Bhusawal, Mumbai CR, Nagpur, Pune, Solapur
9Western RailwayWRMumbai Churchgate19516156.6disp=table1disp=table1046[21] Ahmedabad, Bhavnagar, Mumbai WR, Rajkot, Ratlam, Vadodara
4Eastern RailwayERKolkata19522823.2disp=table1disp=table587[22] Asansol, Howrah, Malda, Sealdah
1Northern RailwayNRDelhi19527363disp=table1disp=table1013[23] Ambala, Delhi, Firozpur, Lucknow, Moradabad
2North Eastern RailwayNERGorakhpur19523470.5disp=table1disp=table537[24] Izzatnagar, Lucknow, Varanasi
5South Eastern RailwaySERKolkata19552758.6disp=table1disp=table363[25] Adra, Chakradharpur, Kharagpur, Ranchi
3Northeast Frontier RailwayNFRGuwahati19584348disp=table1disp=table547[26] Alipurduar, Katihar, Lumding, Rangiya, Tinsukia
6South Central RailwaySCRSecunderabad19666560.5disp=table1disp=table156[27] Guntur, Guntakal, Hyderabad, Nanded, Secunderabad, Vijayawada
NAKolkata MetroKMKolkata198459.8disp=table1disp=table40[28]
14South East Central RailwaySECRBilaspur19882396.6disp=table1disp=table358[29] Bilaspur, Nagpur, Raipur
16East Central RailwayECRHajipur19964238disp=table1disp=table340[30] Danapur, Dhanbad, Mughalsarai, Samastipur, Sonpur
11North Western RailwayNWRJaipur20025705.6disp=table1disp=table578[31] Ajmer, Bikaner, Jaipur, Jodhpur
15East Coast RailwayECoRBhubaneswar20033017.2disp=table1disp=table133[32] Khurda Road, Sambalpur, Waltair
13North Central RailwayNCRPrayagraj20033522.6disp=table1disp=table411[33] Agra, Jhansi, Prayagraj
10South Western RailwaySWRHubballi20033661.8disp=table1disp=table381[34] Bengaluru, Hubballi, Mysuru
12West Central RailwayWCRJabalpur20033060disp=table1disp=table247[35] Bhopal, Jabalpur, Kota

Structure

In every zone, the functional verticals are represented by head of departments (HODs) responsible for the respective functions in the zone.[36] Each division has functional staff who report to the geographical divisional managers and functional HODs in a matrix organization and are tasked with the operation and maintenance of assets.[37]

Zonal administration! Department! HOD! Divisional manager!Function
StoresPrincipal Chief Materials Manager (PCMM)Sr. Divisional Material ManagerMaterial stores for maintenance of infrastructure
MechanicalPrincipal Chief Mechanical Engineer (PCME)Sr. Divisional Mechanical Engineer (Diesel)Maintenance of diesel locomotives
Sr. Divisional Mechanical Engineer (Carriage & Wagon)Maintenance of rolling stock
ElectricalPrincipal Chief Electrical Engineer (PCEE)Sr. Divisional Electrical Engineer (General)Maintenance of station lighting and power supply
Sr. Divisional Electrical Engineer (Traction distribution)Maintenance of overhead equipment
Sr. Divisional Electrical Engineer (Traction rolling stock)Maintenance of electric locomotives and Multiple units
Signal & TelecommunicationPrincipal Chief Signal & Telecom Engineer (PCSTE)Sr. Divisional Signal & Telecommunication Engineer (DSTE)Management of the signalling and telecommunication infrastructure
EngineeringPrincipal Chief Engineer (PCE)Sr. Divisional EngineerMaintenance of fixed assets
Sectional Sr. Divisional Engineer
OperationsPrincipal Chief Operations Manager (PCOM)Sr. Divisional Operations ManagerTrain operations
AccountsPrincipal Financial Advisor (PFA)Sr. Divisional Finance ManagerAccounting and financials
CommercialPrincipal Chief Commercial Manager (PCCM)Sr. Divisional Commercial ManagerPassenger ticketing, checking, freight booking and fare collection
MedicalPrincipal Chief Medical Director (PCMD)Chief Medical SuperintendentProviding medical facilities
SafetyPrincipal Chief Safety Officer (PCSO)Sr. Divisional Safety OfficerSafety of train operations
PersonnelPrincipal Chief Personnel Officer (PCPO)Sr. Divisional Personnel OfficerHuman resources
SecurityPrincipal Chief Security Commissioner (PCSC)Sr. Divisional Security CommissionerSecurity of railway material, passenger and belongings
ManagementAdditional General Manager (AGM)Divisional Railway ManagerManagement of all departments

Human Resources

See also: Indian Railways Management Service and Railway Recruitment Control Board.

Staff are classified into gazetted (Groups A and B) and non-gazetted (Groups C and D) employees with gazetted employees carrying out executive/managerial level tasks.[38] As of March 2022, Groups A & B constitute 1.5% of the total workforce, while Group C & D account for 98.5%.[15] 80% of Group-A employees are recruited through Indian Railways Management Service (IRMS) with remaining through promotions.[39] The various Group A cadres are as below include:[40]

Group B employees are recruited by departmental promotional exams of Group C employees. Recruitment of Group C employees are through exams conducted by the Railway Recruitment Control Board (RRCB) and Group D staffs are recruited by zonal Railway Recruitment Cells (RRC).[41] Indian Railways operates seven centralized training institutes and 295 training centers.[15]

See also

Notes and References

  1. The Indian Railway Board Act, 1905. Parliament of India. 1905.
  2. IRFC. Indian Railways. 1 December 2023.
  3. Web site: History of Indian Railways. 1 December 2023. IRFCA.
  4. Overview of Indian Railways. National Academy of Indian Railways. 1 January 2024.
  5. Web site: History of Indian Railways. 1 December 2023. IRFCA.
  6. Web site: History of Indian Railways. 1 December 2023. IRFCA.
  7. Web site: History of Indian Railways. 1 December 2023. IRFCA.
  8. News: Cabinet approves restructuring of Railway Board. 24 December 2019. Livemint. 1 December 2023.
  9. Book: Rao, M.A.. 1988. Indian Railways. New Delhi. National Book Trust. 978-8-1237-2589-5. 49-54.
  10. Organization chart. Indian Railways. 1 December 2023.
  11. Organization Chart. Indian Railways. 1 December 2023.
  12. Evolution of Indian Railways-Historical Background. Indian Railways. 1 December 2023.
  13. List of zones and divsions. 1 December 2023. Indian Railways.
  14. Cabinet approves South Coast Railway zone. Government of India. 20 May 2019. 2 April 2019. https://web.archive.org/web/20190402144738/http://pib.nic.in/newsite/PrintRelease.aspx?relid=189105. live.
  15. Year book 2021-22. 1 December 2023. Indian Railways.
  16. Indian railway zones. 1 December 2023. Indian Railways.
  17. Route map, 2023. 1 December 2023. Indian Railways.
  18. List of zones and divsions. 1 December 2023. Indian Railways.
  19. List of stations, SR. Indian Railways. 1 December 2023.
  20. Divisions of CR. Indian Railways. 1 December 2023.
  21. Web site: System map, WR. Indian Railways. 1 December 2023.
  22. Category wise stations, ER. Indian Railways. 1 December 2023.
  23. System map, NR. Indian Railways. 1 December 2023.
  24. Web site: System map, NER. Indian Railways. 1 December 2023.
  25. Web site: Category of stations, SER. Indian Railways. 1 December 2023.
  26. Station classification, NFR. Indian Railways. 1 December 2023.
  27. Web site: Category wise stations, SCR. Indian Railways. 1 December 2023.
  28. Web site: Kolkata metro map. Indian Railways. 1 December 2023.
  29. Web site: System map, SECR. Indian Railways. 1 December 2023.
  30. UTS locations, ECR. Indian Railways. 1 December 2023.
  31. Web site: About us, NWR. Indian Railways. 1 December 2023.
  32. Classification of stations, ECoR. Indian Railways. 1 December 2023.
  33. System map, NCR. Indian Railways. 1 December 2023.
  34. Web site: Category wise stations, SWR. Indian Railways. 1 December 2023.
  35. Web site: Category wise list of stations, WCR. Indian Railways. 1 December 2023.
  36. Organization chart, Zonal railway. Indian Railways. 1 December 2023.
  37. Book: India's railway history : a research handbook. 3 August 2012. Brill. 978-9-0042-3003-3. 270. 2 August 2019.
  38. Web site: Railway Board Directorates . live. https://web.archive.org/web/20120530064841/http://www.indianrailways.gov.in/railwayboard/view_section.jsp?lang=0&id=0,1,388. 30 May 2012. Indian Railways.
  39. Recruitment to Indian Railway Management Service (IRMS) to be done through a specially designed examination (IRMS Examination). Government of India. 1 December 2023.
  40. Web site: Railway board. 1 December 2023. Indian Railways.
  41. Indian Railways Establishment Manual. live. https://web.archive.org/web/20120525103317/http://rrcb.gov.in/RRBS.HTML. 25 May 2012 . RRCB. 1 December 2023.