Inaruwa–Kakarvitta Rail Line | |
System: | Broad gauge |
Status: | Underconstruction |
Stations: | 10 |
Routes: | Single track |
Operator: | Department of Railway |
Linelength Km: | 126.763 |
Tracklength Km: | 126.763 |
Website: | http://www.dorw.gov.np/ |
Inaruwa - Kakarvitta Railway Project is an ongoing railway project in Nepal which is the eastern section of Mechi-Mahakali (East-West Railway) Electrified Railway Project. The DPR work which was started in 2015 is already completed. The length of the railway line is estimated. and estimated cost of this project is calculated 90,028,286,240 Nepali Rupees in 2017.[1] [2] [3] The railway line will run parallel 2 km south of Mahendra Highway. There will be 10 railway stations between Inaruwa to Kakarvitta.[4]