Interstate 85 in North Carolina explained
State: | NC |
Route: | 85 |
Type: | I |
Map Custom: | yes |
Map Notes: | I-85 highlighted in red |
Length Mi: | 234.6 |
Length Ref: | [1] |
Established: | 1958 |
Direction A: | South |
Terminus A: | at the South Carolina line near Blacksburg, SC |
Junction: |
|
Direction B: | North |
Terminus B: | at the Virginia line near Bracey, VA |
Counties: | Cleveland, Gaston, Mecklenburg, Cabarrus, Rowan, Davidson, Randolph, Guilford, Alamance, Orange, Durham, Granville, Vance, Warren |
Previous Type: | NC |
Previous Route: | 84 |
Next Type: | NC |
Next Route: | 86 |
Interstate 85 (I-85) is a part of the Interstate Highway System that runs from Montgomery, Alabama, to Petersburg, Virginia. In North Carolina, I-85 travels 231.23miles from the South Carolina state line near Grover to the Virginia state line near Wise. Despite being signed north–south, I-85 physically travels in a southwest–northeast direction across the state. The major landscapes traversed by I-85 include urban and rural pockets of the Piedmont region, with views of Kings Pinnacle seen from its southernmost stretch. The Interstate Highway connects the three most populous metropolitan areas of North Carolina: the Charlotte metropolitan area, Piedmont Triad, and Research Triangle, as well as nine of the 20 largest municipalities in the state. Outside of North Carolina, I-85 connects the state with Richmond, Virginia, to the north and Upstate South Carolina and Atlanta, Georgia, to the south. I-85 parallels several U.S. Highways including U.S. Route 29 (US 29) between South Carolina and Greensboro, US 70 between Greensboro and Durham, US 15 between Durham and Oxford, and US 1 between Henderson and Virginia.
Route description
I-85 is maintained by the North Carolina Department of Transportation (NCDOT) for its entire length in the state and designated as a Blue Star Memorial Highway.[2] The Interstate carries an average annual daily traffic volume of approximately 65,000 vehicles a day; roughly 25–40% of that traffic is commercial vehicles.[3] In 2023, the busiest stretch along the Interstate was from the I-77 interchange to Graham Street in Charlotte, which carried a total of 200,529 vehicles per day.[4] The lowest amount was 20,224 vehicles per day at the US 1 interchange near Henderson and Middleburg. I-85 for most of its length in the state is generally a four to eight-lane configuration, with the exception of Durham, where it widens to ten lanes briefly. All of I-85 is a part of the National Highway System, a network of roads important for the country's economy, defense, and mobility.[5] [6]
South Carolina to Charlotte
I-85 enters Cleveland County, North Carolina from Cherokee County, South Carolina, near the small town of Grover. Most of the Interstate for its first few miles passes through gently rolling terrain and is primarily rural in nature.[7] [8] It has its first interchange with NC 216,[9] which provides access to Kings Mountain National Military Park, with a welcome center shortly after.[10] [11] Later, the southbound lanes have an exit for US 29, which merges onto I-85 and begins a concurrency. At mile marker 10, the Interstate meets US 74 at a weave interchange and US 29 splits off from I-85 for US 74 east.[12] [13]
At this point, I-85 crosses into Gaston County. It enters suburban areas and traffic begins increasing from here.[14] The Interstate then reaches Gastonia and has an exit for NC 274 (Bessemer City Road). Then it has a major interchange with US 321, signed north for Lincolnton and south for the city's main business district.[15] Traffic from US 321 south before 2017 was often congested due to I-85, and a new interchange was developed to help relieve it.[16] Past it, I-85 turns southeast, then east as it goes through more suburban and residential areas of the city.[17] [18] Along here, it intersects more state highways serving as Gastonia's main thoroughfares, including NC 7 (Ozark Avenue), NC 279 (New Hope Road), and NC 7 (McAdenville Road/Main Street) again; NC 7 provides access to the town of McAdenville.[19] Just east of McAdenville, I-85 crosses the South Fork River on the William James Pharr Bridge.[20] From here, the Interstate passes through considerably high residential development as it continues on its eastward track to Belmont.[21] The Interstate then has an exit for Belmont at Main Street[22] and passes right off the campus of Belmont Abbey College as it reaches another interchange for Belmont with NC 273 (Beatty Drive) one mile later,[23] then crosses the Catawba River on the Cameron Morrison Bridge, entering Mecklenburg County.[24]
Charlotte to Greensboro
Right after entering Mecklenburg County, I-85 reaches a weigh station occasionally serving trucks in both directions. Crossing through more suburban development, the Interstate passes right next to the WJZY radio station building. After that, I-85 meets I-485 at a stack interchange. This portion of I-85 is often congested due to the lanes merging into one.[25] Drivers wanting to access I-77 can get off at the interchange, or simply keep driving on I-85 to reach the Charlotte Douglas International Airport. A couple of miles later, I-85 has an exit for the airport via Little Rock Road at a single-point urban interchange (SPUI) and enters the city of Charlotte. It has an interchange with Billy Graham Parkway, as well as two more single-point urban interchanges with NC 27 (Freedom Drive) and NC 16 (Brookshire Boulevard).[26]
I-85 then directly intersects with I-77 and US 21 at mile marker 38 with a hybrid interchange containing several flyover ramps.[27] It then traverses the northern part of Charlotte, and the routing through this portion, while it does not serve the central business district of the city directly, does pass through largely suburban and urbanized areas near Uptown.[28] More interchanges with minor but significant thoroughfares through the city such as Graham Street, Sugar Creek Road, and North Tryon Street appear.[29] [30] Here, I-85 turns northward and enters the University City area. it meets NC 24 (Harris Boulevard) in this stretch, crosses Mallard Creek, and has an interchange with I-485 again, this time at a turbine interchange.[31]
I-85 then crosses into Cabarrus County, immediately entering the city of Concord and dense commercial development. It passes exit 49 (Bruton Smith Boulevard/Concord Mills Boulevard), which provides access for several major attractions such as the Concord Mills Mall and Charlotte Motor Speedway.[32] [33] Several miles later, it has a diverging diamond interchange with NC 73 and then crosses Coddle Creek.[34] It meets US 29 a second time as well as US 601 nearing Kannapolis, the exit of which US 29 provides access to the North Carolina Research Campus.[35] US 601 merges onto I-85, forming another concurrency as the two routes continue northward and meet a rest area. The highway runs to the south of Kannapolis with several exits available,[36] then the road crosses the Cold Water Creek, which parallels the highway, before entering Rowan County.[37] Passing through a mix of suburban and rural development, the highway approaches Salisbury and US 601 splits from I-85 at exit 75 for Jake Alexander Boulevard.[38] The Interstate then enters Salisbury where it meets US 52 at exit 76 with a single-point urban interchange.[39] US 52 merges onto I-85 and the highway exits Salisbury. At Spencer, I-85/US 52 enters Davidson County and crosses the Yadkin River on the Yadkin River Veterans Memorial Bridge.[40] The route then meets with US 29, US 70, and NC 150 near the unincorporated community of Linwood at an unusual interchange. The interchange allows for direct access to NC 150 northbound and US 29/US 70 southbound.[41] US 29 and US 70 converge with I-85/US 52 for a very brief distance, about 2miles, before I-85 reaches an interchange that is accessible northbound only: I-285. At this point, all three U.S. Highways that overlapped I-85 leave the Interstate, with I-85 continuing on its own again.[42] [43]
After the interchange, I-85 passes underneath the bridge, turning slightly east for 1miles, and intersects NC 47 (Hargrave Road).[44] Because the previous exit is northbound-only, drivers going southbound must use NC 47 to access I-285.[45] After its interchange with NC 8 (Cotton Grove Road), which is the main exit for Lexington,[46] I-85 enters a large forest with tree-lined medians and crosses Abbotts Creek,[47] [48] then has an interchange with US 64. Past Holly Grove Road, the northbound lanes cut under the southbound lanes and cross Hamby Creek, diverting traffic to the left side of the road.[49] The reversed lanes of I-85 then pass over Squire Bowers Road and reach a rest area, as well as access to the North Carolina Vietnam Veterans Memorial Park.[50] Once the reversed lanes of the Interstate cross Johnsontown Road, the northbound lanes pass above the southbound lanes and return to the normal direction (right side of the road).[51] [52]
The tree-lined median then gives way to the city of Thomasville, where I-85 meets NC 109.[53] It crosses into Randolph County as it enters the city of Archdale and intersects NC 62.[54] I-85 enters High Point and has a parclo interchange with I-74 and the former routing of US 311. The exits are signed east for Asheboro and west for Winston-Salem. I-85 then passes through another forest with more trees lining the median and crosses the Randolph and Guilford branches of the Richland Creek as it enters Guilford County.[55] [56] Just outside Greensboro, it has a southbound interchange with US 29 (and the former routing of US 70) again.[57] US 29 forms a brief concurrency with I-85 before the route enters suburban areas once more and reaches a very large and complex interchange with Groometown Road, Grandover Parkway, I-73, US 220, and US 421.[58] US 29 splits off through the interchange, while US 421 joins I-85 from I-73 in a wrong-way concurrency. Because I-85 was rerouted around Greensboro after February 2004, it now follows the southern half of the Greensboro Urban Loop.[59] [60]
Greensboro to Durham
Leaving the massive interchange, I-85/US 421 stays connected for just 4miles before US 421 departs the concurrency at exit 126 to head southeast for Sanford. Meanwhile, I-85 maintains its northeastward track and passes by a couple more exits before reaching I-785 (its third auxiliary route), I-40, and I-840, the former and latter of which have their southern and eastern terminus at I-85 respectively.[61] I-40 merges onto I-85 and the two routes share a rather long concurrency which travels entirely east–west for 31miles. I-40/I-85 enters more industrial areas and meets NC 61 before entering Alamance County. It travels right through the heart of Burlington and large commercial areas upon mile marker 141, intersecting several of the city's main state highways, including NC 62 again, NC 49, NC 87, and NC 54, then crosses the Haw River.[62] [63] Past a diverging diamond interchange with NC 119 (Mebane-Oaks Road), the highway enters Orange County and reaches another truck weigh station. I-40 then splits off southeast from I-85 to serve the southern portion of Durham and downtown Raleigh while I-85 continues eastward towards northern Durham.[64] The following interchanges of I-85 before Durham County are rather substandard in quality due to the Interstate retaining its original narrow design of four lanes.[65] It meets NC 86 and later US 70, which forms another concurrency once again before entering Durham County.[66] At mile marker 172, it meets the northern terminus of NC 147 (Durham Freeway), which connects to downtown Durham.[67] I-85/US 70 then reaches the main city center, becoming somewhat urban in nature.[68] It then has an interchange with US 15 and US 501, which both also join the concurrency. The highway passes a diamond interchange with NC 157 (Guess Road), and then US 501 splits off at Duke Street to head north.[69] The other three highways continue on their way before meeting the western terminus of NC 55 (Avondale Drive). Just before exiting Durham, US 70 departs the concurrency as well to head east alongside I-85's fourth and final auxiliary route, I-885 (Durham East End Connector),[70] for the Raleigh–Durham International Airport and Raleigh itself while I-85 and US 15 remain connected together.[71]
Durham to Virginia
North of Durham, I-85/US 15 passes several more minor interchanges before entering Granville County and suburban areas. The landscape gives way to rural areas and yet another forest as the highway makes its way across Falls Lake.[72] US 15 departs I-85 at mile marker 186 to serve the town and city of Butner and Creedmoor respectively, whereas I-85 bypasses these areas but still contains some exits leading to Butner.[73] From here to Oxford, US 15 parallels I-85. The Interstate then intersects NC 56 outside of Butner and continues to make its way through the forest for about 10miles without any other interchanges.[74] I-85 then crosses the Tar River and comes to another rest area.[75] It meets US 15 at another interchange just near mile marker 202 nearing Oxford. Interchanges with NC 96 and US 158 immediately follow, then I-85 cuts into Vance County.[76]
It immediately reaches the city limits of Henderson before meeting up with US 158 (Dabney Drive), and US 158 merges on I-85 to follow a short concurrency with it. The highway intersects NC 39, the main exit for Henderson, then US 158 splits off from the concurrency shortly after. At mile marker 218, I-85 has a southbound exit for US 1, which begins paralleling it for the rest of the Interstate's length through the state.[77] I-85 passes just west of Middleburg and has a parclo interchange with US 1/US 158 (Flemingtown Road) for the town of Norlina.[78] I-85 then enters its final county in the state, Warren County. Before long, it bypasses Manson and continues to go through rolling hills and bumpy terrain with no development along the road.[79] Just before leaving North Carolina, I-85 has its final interchange in the state with US 1 and the northern terminus of US 401 near the unincorporated community of Wise, with the southbound lanes then having an exit for the welcome center.[80] Shortly after this, it exits North Carolina and crosses the state line into Mecklenburg County, Virginia.[81]
Dedicated and memorial names
I-85 in North Carolina features a few dedicated or memorialized stretches of freeway. The entire length of the Interstate is known as the Blue Star Memorial Highway, approved on May 5, 1967.[82] [83] Through Gaston County, the name of I-85 is known as the Senator Marshall Arthur Rauch Highway, being signed on October 3, 1997. Between the I-77/US 21 interchange and the I-85 Connector (exit 42) in Charlotte, the route is known as the Julius Chambers Highway, named in honor of Julius L. Chambers.[84] [85] From Charlotte to the Mecklenburg/Cabarrus county line, the route is known as the Jeff Gordon Expressway after NASCAR driver Jeff Gordon.[86] This section of the highway was signed on May 25, 2012.[87] [88] [89] [90] From mile marker 92 to 96, the Interstate is known as the Bob Timberlake Freeway after the artist of the same name.[91] [92] On mile marker 96 to 102, I-85 is known as the Richard Childress Freeway after the NASCAR driver.[93] [94] At Alamance Church Road (exit 128) to the I-40 interchange (exit 131), I-85 is known as the Congressman J. Howard Coble Highway, signed on December 1, 2016, after Howard Coble, who represented North Carolina's 6th congressional district for over 30 years.[95] [96] [97] From the Guilford−Alamance county line to east of NC 54 in Graham, I-85, concurrent with I-40, is known as the Sam Hunt Freeway, named after R. Samuel Hunt, a representative for North Carolina's 25th House district as well as the Secretary for NCDOT. This designation was approved on September 5, 1997.[98] From Cole Mill Road (exit 173) to its interchange with US 70 (exit 178) in Durham, I-85, concurrent with US 70, is known as the Dr. John H. Franklin Highway, named after John Hope Franklin, an American historian and recipient of the Presidential Medal of Freedom. This name was approved on October 5, 2017.[99] [100] Between Flemingtown Road (exit 220) to the Vance/Warren county line, the Interstate is known as the Andrea L. Harris Highway after Andrea Harris, a civil rights activist from the state. This designation was approved on December 15, 2023, by Governor Roy Cooper.[101] [102]
I-85 also has two dedicated bridges it crosses, both in Gaston County. The bridge which the Interstate crosses over the South Fork River, a branch of the Catawba River, is known as the William James Pharr Bridge, named after William James Pharr Sr., a mayor of McAdenville for over 25 years. This was approved on August 5, 1994.[103] The bridge which I-85 crosses over the main Catawba River between Gaston and Mecklenburg counties is known as the Cameron Morrison Bridge, which was named after Cameron A. Morrison, the 55th governor of North Carolina and known as the Good Roads Governor. It was signed on March 11, 1983.[104] Despite the naming of the bridge, it has sparked controversy due to Morrison being remembered for leading the Red Shirts group.[105] NCDOT has not announced any new petitions to change the name, but explained that applications could be considered.[106]
History
Predecessor highways
The path that would eventually be developed into I-85 existed as a long trail running from Petersburg, Virginia all the way to Augusta, Georgia with a distance of over 500miles, known as the "Great Trading Path". Most of this land was unexplored, with animals mainly traveling along it. American Indians had unique ways to mark their path by tying the sapling of a tree into a knot. Because of this, the top of the tree would always point to the correct direction. Although the tree was located somewhere within the territory of the present Cherokee tribe, authorities determined that the tree was located on or near the Great Trading Path within this area.[107] The path, lesser known as the "Occaneechi Path", was mainly traversed by the two Siouan tribes, the Saponi and Occaneechi, often trading with the Cherokee and Catawba tribes, both of whom were enemies at the time. While the path was rather narrow and made by animals, it later became much easier to navigate through. Starting with the Europeans' arrival in the 1670s, the fur trade boomed and increased the demand for furs, leading the trail to become a wagon road in the 1740s.[108]
Beginning in what was then known as Fort Henry and now is Petersburg, the travelers made their way into the state through the land now part of Granville County. This trail went through the counties of which I-85 would pass through, and the travelers eventually met the tribal groups that would form the names of several of the state's areas. The trail then made its way across the Tar, Haw, Uwharrie, and Yadkin rivers, most of them paralleling I-85. Upon reaching what would become Charlotte, the trail then split in two, with one of them heading for Columbia and the other towards Cherokee land near present-day Augusta. In 1670, John Lederer became the first European to explore the trail and describe it in his writings. In 1700, explorer John Lawson began his journey through the path. The trip took 59 days and covered a distance of over 550miles.[109] In 1799, when William Whedbee Kirkland built his house, Ayr Mount, the Great Trading Path had become a major thoroughfare through the state, with lots of cargo being transported. The amount of commerce brought through the route continued into the present day, where the road would then become known as I-85.[110]
Initial design and construction
Parts of I-85 were already constructed before federal aid was available in the 1950s, as the state had been constructing sections of the Interstate Highway System since 1949. The Lexington Bypass north of Lexington—which at the time was signed US 29 and US 70—is now a part of I-85 Bus.[111] This was part of an 80miles expressway completed in 1955 between Lexington and Hillsborough.[112] One planned road was the Salisbury Bypass, 15miles long with a $1-million (equivalent to $ in) 880feet twin-span bridge over the Yadkin River. Construction on the bridge started in 1955 (this date is shown on a plaque, and most sources have used the date), but the lanes were not as wide as federal standards required, and the road had a sharp curve north of the bridge. Both of these characteristics saved money, and the bridge, finished a year earlier, was grandfathered despite not meeting standards.[113] The very first stretch of I-85 would later be completed, an 11.3miles segment through Mecklenburg County. Known as the "Charlotte Bypass" at the time, this portion of the Interstate was fully opened to traffic on September 9, 1958. At the time, I-85 only served as a bypass of Charlotte, and was also referred to as the "US 29 bypass". Since I-85 was nothing more than a few segments of eleven and twelve-mile stretches, service stations were not far away by any means. Green guide signs were also erected to warn of any upcoming access roads ahead in case travelers would want to exit off the Interstate. To mitigate stress and panic, the common I-85 interstate shield with the colors red, white, and blue would occasionally show up to keep drivers relaxed, calm, and figuring out which way they were going.[114]
In 1960, I-85 underwent major renovations, with its first finished section in that year being an 18miles segment within Vance and Warren counties, with the next segment after that being a 46miles section between West Durham and Greensboro opening to traffic that year. A portion of US 29/US 70 also became I-85 after grade separations and access control were completed and secured. Before the end of the year, several other sections of I-85 were also completed and opened, with a 14miles section of the "Charlotte Bypass", a 15.4-mile segment of the Salisbury Bypass, a 13.8-mile segment between Greensboro and Whitsett, an 18.3-mile segment between Henderson and the Virginia line, and the last section being a 22.2-mile segment between Whitsett and Efland. A section of I-85 from the end of the "Charlotte Bypass" to the NC 273 interchange near Belmont was planned to open on December 1 by the end of the year. This section of the Interstate had an estimated cost of $3 million with a length of approximately 4.7miles and ended at NC 273. While the pavement at the interchange had been laid, traffic lights were not installed at the junction with Wilkinson Boulevard yet.[115] The proposal was indefinitely delayed later on due to complications. Although the interchange was mostly complete, construction was still progressing on the south side of the intersection with traffic lights still to be installed. In addition, cold weather had also played a role in the delay.[116] However, on January 17, 1961, this link of I-85 between Charlotte and Belmont opened to traffic at approximately 3:30 pm. To control traffic flow, special ultra-sonic vehicle detectors were placed over the Interstate. They were the first vehicle detectors to be used in the North Carolina highway system, and the detectors would count the amount of vehicles and regulate the traffic lights along the interchange to allow proper traffic safety. The Interstate would later on continue towards the South Carolina state line by avoiding Gastonia to the north.[117]
On December 9, 1963, the County Commissioner of the state received a letter notifying that the Gastonia link of I-85 would be set for dedication on January 10. This link of I-85 would allow drivers to bypass Franklin Boulevard, the main street through the city, which was often congested and avoid over 22 traffic lights along the road.[118] On January 10, 1964, the dedication of the I-85 link officially began with federal highway administrator Rex M. Whitton giving a rather short dedication speech. He noted that this link of I-85 was part of 107miles of the entire Interstate's length in North Carolina. A ribbon-cutting ceremony then commenced with Whitton and his wife being driven to a ribbon. Upon snipping the ribbon, it officially opened this segment of I-85 that would skirt around the northern portion of Gastonia.[119] By 1965, I-85 from the South Carolina border to Charlotte was complete, while it took until 1970 for the section between Charlotte and Durham to be completed. However, the "Temporary 85" designation would remain on the segment between Lexington and Greensboro until 1984 because there were too many access roads. That year, a new six-lane section opened, resulting in the "Temporary 85" designation to be dropped. The Interstate had a total mileage of 133.6miles through the state, which was more than any other Interstate in North Carolina at the time.[120]
From 1969 to 1972, several more segments of I-85 were opened to traffic. On December 22, 1969, an 11.4miles section from China Grove to Concord was opened, allowing traffic to use it, with the commission adding that around the next year, another 8.6miles portion of the highway from Concord to Mecklenburg County as well as a connector to Charlotte would also be completed.[121] The stretch of I-85 from Henderson to the Virginia state line, a distance of approximately 3.1miles opened to traffic on December 2, 1970, with a cost of $2 million. However, the segment of I-85 in Durham was still under development, but would open on December of 1971, closing the I-85 gap.[122] On December 15, 1970, governor Bob Scott announced that about a year from then, all of I-85 would be completed in the state except for a stretch between Greensboro and Lexington. Scott also announced that by June, the remaining 8miles of the Interstate in North Carolina would be opened. Explaining that the Henderson bypass was finished and the "missing link" from Durham to Henderson was still in construction but opens the year after, he noted that just 20miles of Interstate Highway built in a state costed a total of $19 million, or about $1 million every mile, but explained that interstate highways were much safer than regular highways.[123]
Through September of 1971, another 7miles section of I-85 from Oxford to Henderson was open, which left a 12.5miles portion of the highway from the Neuse River to Oxford remaining and under construction. Another 35miles segment of the highway from Greensboro to Salisbury was undergoing an environmental study and not planned to be let to contract yet.[124] On January 13, 1972, a 16miles stretch of I-85 north of Durham was completed and opened. Costing approximately $16 million, this stretch of the highway was often nicknamed "the missing link," considered as one of the deadliest roads in the state. The opening resulted in most of I-85 being interstate standard and four-laned. Initially in December 1970, the 2.3miles stretch in Henderson as well as the 11miles segment from Oxford to Henderson costed a total of $30 million, which was a part of the "missing link" segment of the Interstate. The opening of the section joined all sections north of Durham, resulting in a trip taking approximately 35 minutes from the city to Henderson. The completion of I-85 in this area officially connected the Interstate as a 235miles route through North Carolina.[125] [126]
Projects and later history
Since its completion, many widening projects have been undertaken on I-85, particularly along the stretch of highway between Gastonia and Durham. On December 19, 1958, a highway fencing project during the Interstate's construction began to experiment with safety along the highway. As the first fencing project in the state, the contract price, done by the Butler Brothers of Greensboro, was estimated at a total of $103,000. Authorities announced that the fence would be worth the price if it would help cut down the number of accidents along the Interstate. Both sides–north and southbound–would have fencing extend a total of about 18miles. Fencing would not be required if the highway passed over steep cuts or high fills. There were two types of fencing that would be used. Near interchanges and through cities, heavy chain-link fencing would be placed. On the northern and western ends, woven wire fastened to wooden posts would have barbed wire both top and bottom. The project was estimated to use over 47000feet of chain-link and 55000feet of woven wire.[127] In December 1971, a study was planned to try and remedy traffic along the corridor after 3 traffic jams occurred at Greensboro, Burlington, and through US 15. Commissioner Cliff Benson announced that an extension of I-40 could be done along a southern route between Durham and Raleigh. Another solution that was thought of was if I-85 could be widened to six lanes between Greensboro and Durham. Problems arose, however, due to the fact that if an Interstate was completed, it would be the state's responsibility to maintain the corridor. Due to this, engineers said that the widening of I-85 would possibly only be completed around 1976 or 1978.[128]
By 1988, widening I-85 to six lanes from Greensboro to Burlington was being considered.[129] The plan was later changed to eight lanes.[130] The $175-million (equivalent to $ in) project began in 1989. With the opening of a 2.3miles section in Alamance County on November 23, 1994, 21miles of I-85/I-40 were eight lanes. An additional 14miles were to be ready by 1996, giving the Interstate eight lanes to where I-40 turned southward at Hillsborough.[131] In addition, I-85 was relocated in 2004, south of Greensboro, forming part of the Greensboro Urban Loop, allowing through traffic to bypass that city's downtown area.[132] Between 2004 and 2008, I-85 was widened to eight lanes around Salisbury. From May 2010 through April 2014, I-85 was widened from four to eight lanes between exit 49 (near Charlotte Motor Speedway and Concord Mills) and exit 55.[133]
Following the completion of the widening of I-85 from milemarker 49 to 55, a new project was started to widen I-85 from exit 55 (NC 73) in Concord, Cabarrus County northward to exit 68 (NC 152) in the town of China Grove. Like the prior project, I-85 is being doubled in capacity, expanding from two travel lanes in each direction to four travel lanes in each direction. The project is now complete as of May 2021. The first phase (from exit 55 to exit 63) began in early 2014, and the second phase (from exit 63 to exit 68) began in early 2017.[134] Construction was completed by December 2017, which left I-85 with at least six lanes of highway between exits 10 (US 29 north/US 74—Kings Mountain and Shelby) and 164 (I-40 in Hillsborough).[135] Around November 2021, a new project by NCDOT called the "Integrated Corridor Management System" began along I-85 in Mecklenburg and Gaston counties. The project used cameras, electronic signs, and traffic lights that were remote-controlled. This also involved upgrading 94 traffic lights, adding two signs, and placing 11 cameras into the system to help predict any potential accident.[136] [137] In 2024, from the US 321 interchange to I-485 through Gaston and Mecklenburg counties, due to congestion along the Interstate, the lanes are being widened to accommodate larger amounts of traffic.[138]
I-85 Corridor Improvement Project
The I-85 Corridor Improvement Project, located in Rowan and Davidson counties, was a two-phase project to replace the narrow bridge over the Yadkin River and widen the freeway from four to eight lanes. In the first phase, all traffic from the old bridge moved to a new $201-million (equivalent to $ in) bridge in August 2012. The second phase of the project involved widening the northern segment of I-85 to a length of 3.8miles.[139] On March 9, 2013, all eight lanes of the I-85 bridge opened to the public.[140] The project finished eight months ahead of schedule and $44 million (equivalent to $ in) under budget.[141] In addition to this, it also included placing 1.2 million cubic yards of embankment material, install 4 new miles of storm drainage, and ready about 320,000 square yards of road to add new pavement on it. Storm water would also be controlled by adding and modifying over 1,000 erosion control features.[142] Other features of construction included temporary ramps to make the process of building the inner lanes easier. Trucks were also required to use these ramps to reduce the amount of truckloads that were along the Interstate. Upon completion of the project, this resulted in the Belmont Road interchange (exit 86) being reconstructed and the Clark Road interchange (exit 85) being closed permanently.[143]
Incidents
A study by GPS tracking company Teletrac determined that I-85 in North Carolina was one of the deadliest and most dangerous roads to travel on in Charlotte, ranking 15th out of 30. The Interstate was estimated to have over 0.613 deaths per mile of highway, with over 408 deaths over its entire length, and the most common month being May.[144]
The most deadly accident to ever occur along I-85 was in Salisbury, when a family from Maryland was traveling to South Carolina for vacation on July 8, 1995. Three members of the family were killed in the accident involving five cars. 11 others, including 5 children, were badly injured and taken to the hospital for treatment.[145] On May 31, 2023, a large tractor-trailer hit and damaged the NC 86 bridge (exit 165) over I-85. While the crash did not cause any damage to I-85 itself, the southbound lanes were closed for several days to repair and maintain the bridge while directing traffic along the interchange ramps.[146]
Related routes
There are four auxiliary routes and one business loop in the state. I-285 runs concurrently with US 52 connecting I-85 to I-40 in the Winston-Salem metropolitan area.[147] I-485 forms a beltway around Charlotte, serving as a bypass for I-85 and I-77.[148] [149] I-785 serves as a spur route, forming a portion of the eastern part of the Greensboro Urban Loop and in the future will connect to Danville, Virginia.[150] I-885 connects I-85 to I-40 in the Durham area.[151]
I-85 Bus. used to be a partial controlled-access highway, bypassing Lexington, Thomasville, High Point, and Greensboro which was decommissioned in 2019. Signage for I-85 Bus. remained until 2024, however.[152]
See also
External links
Notes and References
- Web site: Starks . Edward . January 27, 2022 . Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways . August 21, 2022 . FHWA Route Log and Finder List . . September 19, 2023 . https://web.archive.org/web/20230919225606/https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table01.cfm . live .
- Web site: North Carolina Department of Transportation . May 12, 2024 . Blue Star Memorial Highways Fact Sheet, 2019 . May 12, 2024 . North Carolina Department of Transportation . April 17, 2024 . https://web.archive.org/web/20240417152331/https://connect.ncdot.gov/municipalities/ProceduresPolicies/Blue%20Star%20Memorial%20Highways%20Fact%20Sheet,%202019.pdf . live .
- Web site: Applying the Principles of the Work Zone Rule to Design-Build Projects, Two Case Studies: North Carolina I-85 Corridor Improvement Project . April 3, 2024 . FHWA Work Zone . Federal Highway Administration . March 20, 2021 . https://web.archive.org/web/20210320134831/https://ops.fhwa.dot.gov/wz/resources/publications/fhwahop13024/s5.htm . live .
- Web site: Transportation Data Management System . live . https://web.archive.org/web/20230618140559/https://ncdot.public.ms2soft.com/tcds/tsearch.asp?loc=Ncdot&mod=TCDS . June 18, 2023 . 2024-07-30 . ncdot.public.ms2soft.com.
- Federal Highway Administration . National Highway System: North Carolina . Federal Highway Administration . Washington, DC . March 25, 2015 . April 6, 2016 . September 22, 2015 . https://web.archive.org/web/20150922023709/http://www.fhwa.dot.gov/planning/national_highway_system/nhs_maps/north_carolina/nc_northcarolina.pdf . live .
- Web site: February 26, 2016 . What is the National Highway System? . live . https://web.archive.org/web/20120924215257/http://www.fhwa.dot.gov/planning/national_highway_system/ . September 24, 2012 . April 6, 2016 . National Highway System . Federal Highway Administration .
- Web site: City of Kings Mountain . Kings Mountain at a Glance . July 4, 2024 . Kings Mountain Comprehensive Bicycle Plan . June 29, 2024 . https://web.archive.org/web/20240629025344/https://cityofkm.com/DocumentCenter/View/170/Section-2---Current-Conditions-PDF . live .
- United States Geological Survey . Grover, NC . United States Geological Survey . United States Geological Survey . Topographic map . 2022 . Reston, Virginia . 1:24,000 . 7.5 Minute Series . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816030739/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=17d1021d7f547db8bcafd654ada88379 . live .
- Web site: I85 SBL over NC216 Cleveland County, North Carolina Bridge Inspection Report . July 4, 2024 . Greenville News . en . August 16, 2024 . https://web.archive.org/web/20240816030932/https://data.greenvilleonline.com/bridge/north-carolina/cleveland/i85-sbl-over-nc216/37-000000000450026/ . live .
- Web site: Park Archives: Kings Mountain National Military Park . July 4, 2024 . npshistory.com . July 18, 2024 . https://web.archive.org/web/20240718075012/https://npshistory.com/publications/kimo/index.htm . live .
- Web site: Kings Mountain National Military Park (U.S. National Park Service) . July 4, 2024 . National Park Service . en . August 16, 2024 . https://web.archive.org/web/20240816030939/https://www.nps.gov/kimo/index.htm . live .
- Web site: North Carolina Department of Transportation . May 9, 2024 . Cleveland County . May 9, 2024 . North Carolina Department of Transportation . May 10, 2024 . https://web.archive.org/web/20240510020834/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDF_CountyOneSheet/Cleveland_CountyMap_OneSheet.pdf . live .
- United States Geological Survey. Kings Mountain, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. August 2, 2024.
- Web site: One-third of Gaston traffic is on I-85 . July 4, 2024 . Gaston Gazette . en-US . June 3, 2023 . https://web.archive.org/web/20230603151026/https://www.gastongazette.com/story/news/local/2019/02/25/one-third-of-all-gaston-traffic-is-on-i-85/5834013007/ . live .
- Web site: Contractors Complete New Interchange at I-85 and U.S. 321 in Gaston County . July 4, 2024 . North Carolina Department of Transportation . en-US . September 28, 2023 . https://web.archive.org/web/20230928215223/https://www.ncdot.gov/news/press-releases/Pages/2021/2021-02-25-gastonia-interstate-85-interchange.aspx . live .
- Web site: Nelson . Omar . December 14, 2017 . I-85/US 321 interchange construction underway in Gastonia . April 4, 2024 . City News Source . en-US .
- Web site: City of Gastonia . Location & Transportation . July 4, 2024 . City of Gastonia . en-us . May 1, 2024 . https://web.archive.org/web/20240501092544/https://gastonianc.gov/component/content/article/132-407-607-location-transportation.html . live .
- United States Geographical Survey . Gastonia North, NC . United States Geological Survey . Topographic map . 2022 . Reston, Virginia . 1:24,000 . 7.5 Minute Series . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816030745/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=bf9960d25cd4715e909bd1bf0bf21d91 . live .
- Web site: North Carolina Department of Transportation . May 10, 2024 . NC 7 Interchange – Gaston County . May 10, 2024 . North Carolina Department of Transportation . May 10, 2024 . https://web.archive.org/web/20240510173333/https://www.ncdot.gov/projects/i-85-widening-gaston-county/Documents/mcadenville-main-street-nc-7-interchange.pdf . live .
- Web site: North Carolina Department of Transportation . July 30, 2015 . Road_Bridge_Names . July 22, 2024 . connect.ncdot.gov . 16 . March 30, 2016 . https://web.archive.org/web/20160330205940/https://connect.ncdot.gov/resources/safety/Teppl/TEPPL%20All%20Documents%20Library/Road_Bridge_Names.pdf . live .
- United States Geological Survey. Mount Holly, NC. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 26, 2024.
- Web site: North Carolina Department of Transportation . July 22, 2024 . belmont-mount-holly-interchange . July 22, 2024 . www.ncdot.gov . July 22, 2024 . https://web.archive.org/web/20240722050115/https://www.ncdot.gov/projects/i-85-widening-gaston-county/Documents/belmont-mount-holly-interchange.pdf . live .
- Web site: North Carolina Department of Transportation . July 22, 2024 . nc-273-beatty-drive-interchange . July 22, 2024 . www.ncdot.gov.
- Web site: I85 over CATAWBA RIVER Gaston County, North Carolina Bridge Inspection Report . May 10, 2024 . Naples Daily News . en . May 10, 2024 . https://web.archive.org/web/20240510173328/https://data.naplesnews.com/bridge/north-carolina/gaston/i85-over-catawba-river/37-000000000710159/ . live .
- Web site: NCDOT: I-85/I-485 Interchange Improvements, West of Charlotte . April 4, 2024 . North Carolina Department of Transportation . en-US .
- Web site: North Carolina Department of Transportation . May 10, 2024 . Mecklenburg County . May 10, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816031303/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDF_CountyOneSheet/Mecklenburg_CountyMap_OneSheet.pdf . live .
- Web site: Charlotte Regional Transportation Planning Organization . 2020-2029_TIP_Hwy_List . July 4, 2024 . Charlotte Regional Transportation Planning Organization . August 16, 2024 . https://web.archive.org/web/20240816031432/https://www.crtpo.org/PDFs/TIP/2020-2029/2020-2029_TIP_Hwy_List.pdf . live .
- United States Geological Survey. Derita, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 22, 2024. July 22, 2024. https://web.archive.org/web/20240722050116/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=4b255df3f419d5a1f8d60a3e78456547. live.
- Web site: West Sugar Creek . July 4, 2024 . www.charlottenc.gov . en-US . August 16, 2024 . https://web.archive.org/web/20240816031432/https://www.charlottenc.gov/Growth-and-Development/Corridors-of-Opportunity/I85-Sugar-Creek . live .
- Web site: North Carolina Department of Transportation . July 15, 1988 . R-2420_Feasibility-Study_Report_1988 . live . https://web.archive.org/web/20170207162438/https://connect.ncdot.gov/projects/planning/FeasibilityStudiesDocuments/R-2420_Feasibility-Study_Report_1988.pdf . February 7, 2017 . July 4, 2024 . North Carolina Department of Transportation . 5.
- Thompson . Jen . July–August 2013 . North Carolina Steps Boldly Out of Its Comfort Zone . April 3, 2024 . Public Roads . 77 . 1 . Federal Highway Administration . FHWA-HRT-13-005 . April 4, 2024 . https://web.archive.org/web/20240404040647/https://highways.dot.gov/public-roads/julyaugust-2013/north-carolina-steps-boldly-out-its-comfort-zone . live .
- Web site: January 9, 2018 . New I-85 flyover bridge will connect I-85 to Concord Mills . May 10, 2024 . WSOC-TV . en . May 10, 2024 . https://web.archive.org/web/20240510020834/https://www.wsoctv.com/news/local/new-i-85-flyover-bridge-will-connect-i-85-to-concord-mills/680508344/ . live .
- Web site: Charlotte Motor Speedway . cms_MasterMap_2022-gold copy . July 27, 2024 . www.charlottemotorspeedway.com . August 16, 2024 . https://web.archive.org/web/20240816031305/https://www.charlottemotorspeedway.com/documents/cms-gold-lot-parking-map1.pdf . live .
- News: I-85 over CODDLE CREEK Cabarrus County, North Carolina Bridge Inspection Report . May 10, 2024 . USA Today . en . May 10, 2024 . https://web.archive.org/web/20240510020834/https://data.usatoday.com/bridge/north-carolina/cabarrus/i-85-over-coddle-creek/37-000000000250055/ . live .
- Kannapolis, NC. May 9, 2024. NCRC Campus Map 2021. May 9, 2024. Kannapolis, North Carolina. https://web.archive.org/web/20240510020834/https://www.kannapolisnc.gov/Portals/0/Departments/Communications/Documents/NCRC%20Campus%20Map%202021.pdf. May 10, 2024. live.
- United States Geological Survey. Concord, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 27, 2024. August 16, 2024. https://web.archive.org/web/20240816031306/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=8356421316d823d216a761864b52247a. live.
- Web site: I-85 SOUTH RAMP over COLD WATER CREEK Rowan County, North Carolina Bridge Inspection Report . July 4, 2024 . Greenville News . en .
- United States Geological Survey. China Grove, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 22, 2024. July 22, 2024. https://web.archive.org/web/20240722050117/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=c7b35b168916415ba8940e4e9f6b55c0. live.
- United States Geological Survey. Salisbury, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 22, 2024. July 22, 2024. https://web.archive.org/web/20240722050115/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=fa852f8553e3f55c342e3406ea693b23. live.
- Web site: n.d. . Project Spotlight: I-85 Yadkin River Bridge . April 3, 2024 . North Carolina Department of Transportation . April 4, 2024 . https://web.archive.org/web/20240404002820/https://connect.ncdot.gov/projects/construction/Structural%20Design%20AGCDOT%20Joint%20Bridge%20Design%20Commi/Project%20Spotlight%20-%20I-85%20Yadkin%20River%20Bridge.pdf . live .
- Web site: I-85 Corridor Improvement Project, North Carolina – Verdict Traffic . July 4, 2024 . www.roadtraffic-technology.com . June 1, 2023 . https://web.archive.org/web/20230601220646/https://www.roadtraffic-technology.com/projects/i-85-corridor-improvement-project-north-carolina/ . live .
- North Carolina Department of Transportation . Davidson County, North Carolina . October 2018 . North Carolina Department of Transportation . Raleigh . Enlarged Municipal and Suburban Areas . April 3, 2024 . April 30, 2024 . https://web.archive.org/web/20240430032823/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDFs/Davidson_CountyMap_Sheet05_Final_web.pdf . live .
- Web site: Applying the Principles of the Work Zone Rule to Design-Build Projects, Two Case Studies: North Carolina I-85 Corridor Improvement Project . July 4, 2024 . FHWA Work Zone . Federal Highway Administration . March 20, 2021 . https://web.archive.org/web/20210320134831/https://ops.fhwa.dot.gov/wz/resources/publications/fhwahop13024/s5.htm . live .
- Web site: North Carolina Department of Transportation . April 7, 2022 . ProjectM Traffic Forecast Report FINAL . July 18, 2024 . North Carolina Department of Transportation . 3–6 . July 17, 2024 . https://web.archive.org/web/20240717190330/https://connect.ncdot.gov/projects/planning/Traffic%20Forecasts/H193481%20Davidson%20TF/H193481%20Davidson%202022%20TF.pdf . live .
- Web site: North Carolina Department of Transportation . KM_364e-20181212132956 . July 4, 2024 . North Carolina Department of Transportation . 4–5 . September 27, 2019 . https://web.archive.org/web/20190927015028/https://connect.ncdot.gov/resources/safety/Route%20Changes/2018_12_11.pdf . live .
- Web site: North Carolina Department of Transportation . July 2011 . Davidson County Comprehensive Transportation Plan . July 18, 2024 . North Carolina Department of Transportation . 11 . July 17, 2024 . https://web.archive.org/web/20240717190317/https://connect.ncdot.gov/projects/planning/TPBCTP/Davidson%20County/Davidson_County_CTP_Report.pdf . live .
- Web site: I85 S over ABBOTTS CREEK Davidson County, North Carolina Bridge Inspection Report . July 4, 2024 . Greenville News . en . August 16, 2024 . https://web.archive.org/web/20240816031454/https://data.greenvilleonline.com/bridge/north-carolina/davidson/i85-s-over-abbotts-creek/37-000000000570171/ . live .
- Web site: Davidson County, North Carolina . October 13, 2009 . Davidson County Land Development Plan . July 5, 2024 . Davidson County, North Carolina . 73 . August 16, 2024 . https://web.archive.org/web/20240816031952/https://www.co.davidson.nc.us/DocumentCenter/View/328/Land-Development-Plan-PDF?bidId= . live .
- Web site: I85S over HAMBY CREEK Davidson County, North Carolina Bridge Inspection Report . July 4, 2024 . Greenville News . en . August 16, 2024 . https://web.archive.org/web/20240816032003/https://data.greenvilleonline.com/bridge/north-carolina/davidson/i85s-over-hamby-creek/37-000000000570484/ . live .
- Web site: The North Carolina Vietnam Veterans Memorial Park . July 4, 2024 . National War Memorial Registry . en-US . August 16, 2024 . https://web.archive.org/web/20240816031957/https://www.nationalwarmemorialregistry.org/memorials/the-north-carolina-vietnam-veterans-memorial-park/ . live .
- United States Geological Survey . Lexington East, NC . Reston, Virginia . United States Geological Survey . Topographic map . 2022 . 1:24,000 . 7.5 Minute Series . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816031828/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=eb6f0ff61ada0f040f1116f75c42c329 . live .
- United States Geological Survey . Fair Grove, NC . Reston, Virginia . United States Geological Survey . Topographic map . 2022 . 1:24,000 . 7.5 Minute Series . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816031829/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=17740d70ec516c2a608827a617aca4d1 . live .
- Web site: North Carolina Department of Transportation . Feasibility-Study_0509A_Report_2009 . July 4, 2024 . North Carolina Department of Transportation . July 15, 2021 . https://web.archive.org/web/20210715022333/https://connect.ncdot.gov/projects/planning/FeasibilityStudiesDocuments/Feasibility-Study_0509A_Report_2009.pdf . live .
- Web site: June 26, 1992 . USE N.C. 62 . July 4, 2024 . Greensboro News and Record . en .
- Web site: I85S over RICHLAND CREEK Guilford County, North Carolina Bridge Inspection Report . July 4, 2024 . Greenville News . en . August 16, 2024 . https://web.archive.org/web/20240816031952/https://data.greenvilleonline.com/bridge/north-carolina/guilford/i85s-over-richland-creek/37-000000000810545/ . live .
- United States Geological Survey . High Point East, NC . Reston, Virginia . United States Geological Survey . Topographic map . 2022 . 7.5 Minute Series . 1:24,000 . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816031833/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=45d8dae3d109108aa5274ea784d32437 . live .
- Web site: North Carolina Department of Transportation . Guilford County . July 4, 2024 . North Carolina Department of Transportation . September 7, 2023 . https://web.archive.org/web/20230907003731/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDFs/Guilford_CountyMap_Sheet09_Final_web.pdf . live .
- Web site: NCDOT: Greensboro Urban Loop . July 4, 2024 . North Carolina Department of Transportation . en-US . May 10, 2024 . https://web.archive.org/web/20240510020834/https://www.ncdot.gov/projects/greensboro-urban-loop/Pages/default.aspx . live .
- News: January 20, 2023 . Greensboro Urban Loop comes full circle as city sets Monday as opening day for final stretch . March 30, 2024 . FOX8 . WGHP-TV . en-US .
- Guilford County, North Carolina . PDF . Enlarged Municipal and Suburban Areas . 8 of 10 . Raleigh . North Carolina Department of Transportation . North Carolina Department of Transportation . September 2018 . April 3, 2024 . April 30, 2024 . https://web.archive.org/web/20240430032823/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDFs/Guilford_CountyMap_Sheet08_Final_web.pdf . live .
- Web site: NCDOT: Greensboro Urban Loop . May 10, 2024 . North Carolina Department of Transportation . en-US . May 10, 2024 . https://web.archive.org/web/20240510020834/https://www.ncdot.gov/projects/greensboro-urban-loop/Pages/default.aspx . live .
- Web site: North Carolina Department of Transportation . Burlington Map . July 4, 2024 . North Carolina Department of Transportation . May 18, 2024 . https://web.archive.org/web/20240518134805/https://xfer.services.ncdot.gov/imgdot/DOTStateTravelMap/2023_2024/STM_Burlington.pdf . live .
- United States Geological Survey . Burlington, NC . United States Geological Survey . Reston, Virginia . 2023 . Topographic map . 1:24,000 . 7.5 Minute Series . July 19, 2024 . August 16, 2024 . https://web.archive.org/web/20240816032340/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=04ea11200059be03e529fcbaea73852c . live .
- North Carolina Department of Transportation . 2013 . State Transportation Map . North Carolina State Tax Commission . 2013–2014 .
- Web site: Projects Overview . March 30, 2024 . gis.dchcmpo.org . March 30, 2024 . https://web.archive.org/web/20240330021329/https://gis.dchcmpo.org/tipapplication/project?general=I-85&general=I-85&Page=1&Sort=Description&Order=desc . live .
- Web site: DCHC . Projects Overview . July 4, 2024 . DCHC Metropolitan Planning Organization . March 30, 2024 . https://web.archive.org/web/20240330021331/https://gis.dchcmpo.org/tipapplication/project?general=I-85&general=I-85&Page=1&Sort=Description&Order=desc . live .
- Web site: North Carolina Department of Transportation . NC 147 Corridor . July 4, 2024 . August 16, 2024 . https://web.archive.org/web/20240816032341/https://connect.ncdot.gov/letting/Roadside/54-CA-05-11974434/NC%20147%20Corridor.pdf . live .
- Web site: North Carolina Department of Transportation . May 9, 2024 . Durham County . May 9, 2024 . North Carolina Department of Transportation . May 10, 2024 . https://web.archive.org/web/20240510020834/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDF_CountyOneSheet/Durham_CountyMap_OneSheet.pdf . live .
- Web site: DCHCMPO . CTP Projects Overview . July 28, 2024 . gis.dchcmpo.org . July 28, 2024 . https://web.archive.org/web/20240728132249/https://gis.dchcmpo.org/tipapplication/ctpprojects?Page=12&Sort=Facility_Route&Order=desc . live .
- Web site: North Carolina Department of Transportation . July 26, 2024 . i885_nc147_map-Default . July 26, 2024 . www.ncdot.gov . April 17, 2024 . https://web.archive.org/web/20240417100218/https://www.ncdot.gov/news/press-releases/Documents/2022-05-04-i-885%20corridor-map.pdf . live .
- United States Geological Survey. Northeast Durham, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 23, 2024. July 23, 2024. https://web.archive.org/web/20240723041244/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=63c29e762afa897158395cb1dbbf4646. live.
- Web site: Falls Lake at Interstate 85 Near Redwood, NC . May 10, 2024 . waterdata.usgs.gov . en .
- Web site: Town of Butner . Butner Town Limits . butnernc.org . July 4, 2024 . August 16, 2024 . https://web.archive.org/web/20240816032343/https://www.butnernc.org/sites/default/files/fileattachments/planning_amp_zoning/page/133/town-limits-with-etj.pdf . live .
- Web site: Granville County . Infrastructure & Transportation . July 4, 2024 . Granville County . en . February 22, 2024 . https://web.archive.org/web/20240222112839/https://www.granvillecounty.org/businesses/economic-development/infrastructure-transportation/ . live .
- Web site: I85N over TAR RIVER Granville County, North Carolina Bridge Inspection Report . July 4, 2024 . Daily Commercial . en . August 16, 2024 . https://web.archive.org/web/20240816032504/https://data.dailycommercial.com/bridge/north-carolina/granville/i85n-over-tar-river/37-000000000770055/ . live .
- North Carolina Department of Transportation . May 9, 2024 . Granville County Bridge . May 9, 2024 . North Carolina Department of Transportation . May 10, 2024 . https://web.archive.org/web/20240510004546/https://xfer.services.ncdot.gov/imgdot/DOTBridgeMaps/PDF_BridgeOneSheet/Granville_BridgeMap_OneSheet.pdf . live .
- North Carolina Department of Transportation . May 9, 2024 . Vance County . May 9, 2024 . North Carolina Department of Transportation . May 10, 2024 . https://web.archive.org/web/20240510004542/https://xfer.services.ncdot.gov/imgdot/DOTCountyMaps/PDF_CountyOneSheet/Vance_CountyMap_OneSheet.pdf . live .
- Web site: North Carolina Department of Transportation . I-85 Rehabilitation Project . July 4, 2024 . North Carolina Department of Transportation . August 30, 2018 . https://web.archive.org/web/20180830091509/https://www.ncdot.gov/news/public-meetings/Documents/I-0914_Spring_2017_PMs_Handout_FINAL.pdf . live .
- United States Geological Survey. Middleburg, NC. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 23, 2024. July 23, 2024. https://web.archive.org/web/20240723033804/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=8d4508d74238d601a8fb54b8f2a55c59. live.
- Web site: Department of Transportation . State of North Carolina . May 6, 2021 . Request for Proposal . July 3, 2024 . State of North Carolina . August 16, 2024 . https://web.archive.org/web/20240816032404/https://www.doa.nc.gov/14219200/open . live .
- United States Geological Survey. Bracey, VA. United States Geological Survey. United States Geological Survey. Topographic map. 2022. Reston, Virginia. 1:24,000. 7.5 Minute Series. July 23, 2024. July 23, 2024. https://web.archive.org/web/20240723034344/https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=e8af96355e3e5772fcd82342f8c48fea. live.
- Web site: NCDOT: NC Blue Star Memorial Marker Locations . dead . https://web.archive.org/web/20110522011307/http://ncdot.gov/programs/environmental/bluestar/ . May 22, 2011 . June 19, 2011 . North Carolina Department of Transportation .
- Web site: North Carolina Memorial Highways and other Named Facilities . dead . https://web.archive.org/web/20110519162756/http://www.ncdot.org/doh/preconstruct/traffic/TEPPL/Topics/N-01/Sorted%20by%20County.pdf . May 19, 2011 . June 19, 2011 . North Carolina Department of Transportation .
- News: Crump . Steve . May 25, 2018 . A highway honor for a civil rights hero . June 1, 2018 . . Charlotte, North Carolina . May 25, 2018 . https://web.archive.org/web/20180525070824/http://www.wbtv.com/story/38275035/a-highway-honor-for-a-civil-rights-hero . live .
- News: Lowe . Jonathan . May 24, 2018 . Part of I-85 named after prominent attorney, civil rights activist . June 1, 2018 . . Charlotte, North Carolina . August 9, 2020 . https://web.archive.org/web/20200809031338/https://spectrumlocalnews.com/nc/charlotte/news/2018/05/25/i85-thru-part-of-charlotte-named-after-prominent-attorney-civil-rights-activist . live .
- Web site: Busbee . Jay . May 26, 2013 . There is, alas, a speed limit on the Jeff Gordon Expressway . September 2, 2013 . . November 1, 2013 . https://web.archive.org/web/20131101120927/http://sports.yahoo.com/blogs/nascar-from-the-marbles/alas-speed-limit-jeff-gordon-expressway-174354072.html . live .
- News: Flores . Adrianne . Brad Broders . October 19, 2011 . Mecklenburg County Commissioners approve 'Jeff Gordon Expressway' . dead . https://web.archive.org/web/20111025123251/http://charlotte.news14.com/content/sports/auto_racing/648280/mecklenburg-county-commissioners-approve--jeff-gordon-expressway- . October 25, 2011 . October 19, 2011 . News 14 Carolina . Raleigh, North Carolina .
- News: Lyttle . Steve . May 24, 2012 . Ready for the Jeff Gordon Expressway? . June 19, 2012 . . Gulfport, Mississippi .
- Web site: May 25, 2012 . I-85 Jeff Gordon Expressway Ceremony . June 19, 2012 . Flickr .
- Web site: May 25, 2012 . NCDOT dedicates section of I-85 in Mecklenburg County as the Jeff Gordon Expressway . October 6, 2015 . . November 21, 2015 . https://web.archive.org/web/20151121132653/http://www.hendrickmotorsports.com/news/articles/prev/1338157051 . live .
- Web site: Report . Staff . December 1, 2009 . Part of I-85 named Bob Timberlake Freeway . July 5, 2024 . Salisbury Post . en . August 16, 2024 . https://web.archive.org/web/20240816032511/https://www.salisburypost.com/2009/12/01/part-of-i-85-named-bob-timberlake-freeway/ . live .
- Web site: North Carolina Department of Transportation . July 10, 2008 . ACT_Resolution_Edgar_A_Wood_Sr . July 5, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816032352/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_Edgar_A_Wood_Sr.pdf . live .
- News: Stratton . Seth . December 16, 2008 . DOT dedicates part of I-85 as Childress freeway . dead . https://web.archive.org/web/20150623002525/http://www.the-dispatch.com/article/20081216/ARTICLES/812160289 . June 23, 2015 . June 22, 2015 . The-Dispatch.com .
- Web site: North Carolina Department of Transportation . July 10, 2008 . ACT_Resolution_Bob_Timberlake . July 5, 2024 . North Carolina Department of Transportation .
- News: December 1, 2016 . State names part of I-85 in Guilford County for late Rep. Howard Coble . December 6, 2016 . . Greensboro, North Carolina . March 5, 2017 . https://web.archive.org/web/20170305020451/http://www.greensboro.com/news/local_news/state-names-part-of-i--in-guilford-county-for/article_0adee4e1-9c7c-5146-b09d-2957c6ab8664.html . live .
- News: Campbell . Colin . January 10, 2017 . Interstate 85 section named for Congressman Howard Coble . July 5, 2024 . The News & Observer . November 19, 2020 . https://web.archive.org/web/20201119175634/https://www.newsobserver.com/news/politics-government/politics-columns-blogs/under-the-dome/article125627064.html . live .
- Web site: North Carolina Department of Transportation . December 1, 2016 . ACT_Resolution_J_Howard_Coble . July 5, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816033357/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_J_Howard_Coble.pdf . live .
- Web site: North Carolina Department of Transportation . September 5, 1997 . ACT_Resolution_Sam_Hunt . July 5, 2024 . North Carolina Department of Transportation . April 17, 2024 . https://web.archive.org/web/20240417134250/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_Sam_Hunt.pdf . live .
- News: Baumgartner Vaughan . Dawn . November 27, 2017 . Why I-85 in Durham is now the 'Dr. John H. Franklin Highway' . November 28, 2017 . . Raleigh, North Carolina . December 1, 2017 . https://web.archive.org/web/20171201045046/http://www.newsobserver.com/news/local/counties/durham-county/article186803358.html . live .
- Web site: North Carolina Department of Transportation . October 5, 2017 . ACT_Resolution_Dr_John_H_Franklin . July 5, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816033358/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_Dr_John_H_Franklin.pdf . live .
- News: December 15, 2023 . NCDOT: Section of I-85 near Henderson Renamed Andrea L Harris Highway . May 9, 2024 . WIZS-AM . Henderson, North Carolina . en-US . August 16, 2024 . https://web.archive.org/web/20240816033548/https://wizs.com/ncdot-section-of-i-85-near-henderson-renamed-andrea-l-harris-highway/ . live .
- News: December 15, 2023 . NC highway named for Durham activist Dr. Andrea Harris . July 5, 2024 . WRAL-TV . Raleigh, North Carolina . en . August 16, 2024 . https://web.archive.org/web/20240816033526/https://www.wral.com/story/nc-highway-named-for-durham-activist-dr-andrea-harris/21197157/ . live .
- Web site: North Carolina Department of Transportation . August 5, 1994 . ACT_Resolution_William_James_Pharr . July 5, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816033403/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_William_James_Pharr.pdf . live .
- Web site: North Carolina Department of Transportation . March 11, 1983 . ACT_Resolution_Cameron_Morrison . July 5, 2024 . North Carolina Department of Transportation . August 16, 2024 . https://web.archive.org/web/20240816033404/https://xfer.services.ncdot.gov/gisdot/DOTHD/bios/ACT_Resolution_Cameron_Morrison.pdf . live .
- Web site: Abrams . Douglas Carl . Cameron Morrison (1869–1953) . July 5, 2024 . northcarolinahistory.org . July 14, 2024 . https://web.archive.org/web/20240714023618/https://northcarolinahistory.org/encyclopedia/cameron-morrison-1869-1953/ . live .
- News: Vanguard . Hawker . June 18, 2021 . Controversy over naming of ‘Cameron Morrison Bridge’ in Gaston County . July 5, 2024 . Queen City News .
- News: Spencer . Carl . February 6, 1984 . Indians tied trees in knots as markers . July 5, 2024 . Salisbury Evening Post . 6B . Newspapers.com . July 6, 2024 . https://web.archive.org/web/20240706040607/https://www.newspapers.com/article/the-salisbury-post-indians-tied-trees-in/150748154/ . live .
- Web site: Beatty . J. . October 25, 2021 . The Great Trading Path . July 5, 2024 . Classical American Homes Preservation Trust . en-US .
- Web site: December 28, 2016 . John Lawson Began His Journey . July 5, 2024 . North Carolina Department of Natural Resources . en . July 5, 2024 . https://web.archive.org/web/20240705193033/https://www.dncr.nc.gov/blog/2016/12/28/john-lawson-began-his-journey . live .
- Web site: Beatty . J. . October 25, 2021 . The Great Trading Path . July 5, 2024 . Classical American Homes Preservation Trust . en-US . July 5, 2024 . https://web.archive.org/web/20240705193034/https://classicalamericanhomes.org/news/the-great-trading-path/ . live .
- Web site: North Carolina Department of Transportation . Facts: Interstate 85 . 1 . North Carolina Department of Transportation . April 21, 2007 . https://web.archive.org/web/20070203052023/http://www.ncdot.org/public/50thanniv/ncinterstates/download/factsI85.pdf . February 3, 2007 .
- News: This day in history . . January 9, 2016 . November 9, 2016 . March 5, 2017 . https://web.archive.org/web/20170305020408/http://www.greensboro.com/life/this-day-in-history/article_cb4505ea-820c-5218-bd3a-88b3270a0c6a.html . live .
- News: Turner . Walter R. . August 5, 2012 . The mysterious Yadkin River bridge . dead . https://web.archive.org/web/20120806182305/http://www.salisburypost.com/Opinion/080512-insight-turner-on-yadkin-bridge-qcd . August 6, 2012 . August 7, 2012 . .
- News: September 18, 1958 . Real Hunk Of Highway—That's 85 . July 18, 2024 . The Charlotte Observer . 3A . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040229/https://www.newspapers.com/article/the-charlotte-observer-real-hunk-of-high/151359531/ . live .
- News: November 17, 1960 . 85 Link May Open December 1 . July 18, 2024 . The Charlotte Observer . 1C . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816033556/https://www.newspapers.com/article/the-charlotte-observer-85-link-may-open/151359717/ . live .
- News: December 1, 1960 . Road Link Opening Delayed . July 18, 2024 . The Charlotte Observer . 6C . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040246/https://www.newspapers.com/article/the-charlotte-observer-road-link-opening/151360024/ . live .
- News: January 18, 1961 . Charlotte-Belmont Link Of I-85 Open . July 18, 2024 . The Charlotte Observer . 1B . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040234/https://www.newspapers.com/article/the-charlotte-observer-charlotte-belmont/151360108/ . live .
- News: December 10, 1963 . Dedication Of I-85 Set . July 18, 2024 . The Charlotte Observer . 1B . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040248/https://www.newspapers.com/article/the-charlotte-observer-dedication-of-i-8/151360394/ . live .
- News: January 11, 1964 . I-85 Link Formally Opened . July 18, 2024 . The Charlotte Observer . 14B . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040235/https://www.newspapers.com/article/the-charlotte-observer-i-85-link-formall/151360279/ . live .
- Web site: North Carolina Department of Transportation . Facts: Interstate 85 . https://web.archive.org/web/20070203052023/http://www.ncdot.org/public/50thanniv/ncinterstates/download/factsI85.pdf . February 3, 2007 . 2 . North Carolina Department of Transportation . April 21, 2007 .
- News: 1969-12-22 . 11-Mile I-85 Gap Is Closed . 2024-08-02 . The Durham Sun . 2-C . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816033530/https://www.newspapers.com/article/the-durham-sun-11-mile-i-85-gap-is-close/151611791/ . live .
- News: 1970-12-03 . I-85 Bypass Opens . 2024-08-02 . The Charlotte Observer . 2B . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816034048/https://www.newspapers.com/article/the-charlotte-observer-i-85-bypass-opens/151612109/ . live .
- News: 1970-12-15 . Scott Says I-85 Will Be Completed In Year . 2024-08-02 . The Durham Sun . 1-B . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816034109/https://www.newspapers.com/article/the-durham-sun-scott-says-i-85-will-be-c/151611428/ . live .
- News: 1971-09-02 . N.C. to Open 13 Miles of Interstate Road Today . 2024-08-02 . Winston-Salem Journal . 17 . Newspapers.com.
- News: 1972-01-14 . Missing Link Opens, Ending A Deadly Era . 2024-08-02 . . 1A . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816034114/https://www.newspapers.com/article/the-herald-sun-missing-link-opens-endin/151612028/ . live .
- News: 1972-01-14 . Work Still To Be Finished . 2024-08-02 . The Herald-Sun . 2A . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816034112/https://www.newspapers.com/article/the-herald-sun-work-still-to-be-finished/151612047/ . live .
- News: December 21, 1958 . Highway Fencing On 85 Under Way . July 18, 2024 . The Charlotte Observer . 1C . Newspapers.com . August 16, 2024 . https://web.archive.org/web/20240816034101/https://www.newspapers.com/article/the-charlotte-observer-highway-fencing-o/151359351/ . live .
- News: 1971-12-01 . Many Remedies Studied for Traffic Congestion on I-85 . 2024-08-02 . The News and Observer . 5 . Newspapers.com.
- News: December 16, 1988 . I-85 Traffic Flow May Be Smoother . . 5B . .
- News: January 27, 1989 . North Carolina – Wider I-85 Recommended . . 2B .
- News: Hall . David A. . November 23, 1994 . Interstate 40/85 Freeway Isn't Free of Construction . . A1 .
- Web site: Hammer . John . January 20, 2023 . After 56 Years The Urban Loop Officially Opens Monday, Jan. 23 . March 30, 2024 . The Rhino Times of Greensboro . en-US . March 30, 2024 . https://web.archive.org/web/20240330010228/https://www.rhinotimes.com/news/after-56-years-the-urban-loop-officially-opens-monday-jan-23/ . live .
- News: Lyttle . Steve . April 3, 2012 . Part of widened I-85 to open this weekend . dead . https://web.archive.org/web/20140419044106/http://www.charlotteobserver.com/2014/04/03/4815488/part-of-widened-i-85-to-open-this.html#.U1A-Y2RDvBd . April 19, 2014 . April 17, 2014 . Charlotte Observer.
- Web site: NCDOT: I-85 Widening and Improvements . March 28, 2017 . https://web.archive.org/web/20170329055236/https://www.ncdot.gov/projects/i-85widening/ . North Carolina Department of Transportation . March 29, 2017 . dead .
- News: Lyttle . Steve . April 12, 2012 . DOT awards contract for I-85 widening in Cabarrus County . dead . https://web.archive.org/web/20140419044722/http://www.charlotteobserver.com/2014/04/12/4836402/dot-awards-contract-for-i-85-widening.html#.U0wsAGRDvBc . April 19, 2014 . April 14, 2014 . Charlotte Observer.
- Web site: November 29, 2021 . North Carolina tests the future of traffic management on a stretch of I-85 . July 18, 2024 . WFAE 90.7 – Charlotte's NPR News Source . en . July 18, 2024 . https://web.archive.org/web/20240718080815/https://www.wfae.org/charlotte-area/2021-11-29/north-carolina-tests-the-future-of-taffic-management-on-a-stretch-of-i-85 . live .
- Web site: Integrated Corridor Management System Keeps Traffic Moving in Gaston and Mecklenburg Counties . July 18, 2024 . North Carolina Department of Transportation . en-US . July 18, 2024 . https://web.archive.org/web/20240718080816/https://www.ncdot.gov/news/press-releases/Pages/2021/2021-11-23-i-85-traffic-management.aspx . live .
- Web site: NCDOT: I-85 Widening – Gaston County . April 4, 2024 . North Carolina Department of Transportation . en-US . March 30, 2024 . https://web.archive.org/web/20240330021031/https://www.ncdot.gov/projects/i-85-widening-gaston-county/Pages/default.aspx . live .
- News: Turner . Walter R. . August 5, 2012 . The mysterious Yadkin River bridge . dead . https://web.archive.org/web/20120806182305/http://www.salisburypost.com/Opinion/080512-insight-turner-on-yadkin-bridge-qcd . August 6, 2012 . August 7, 2012 . .
- News: April 6, 2013 . NCDOT to open new I-85 Yadkin River bridge on Friday . April 17, 2014 . WBTV-TV . Charlotte, North Carolina . April 19, 2014 . https://web.archive.org/web/20140419013921/http://www.wbtv.com/story/21545058/ncdot-to-open-new-i-85-yadkin-river-bridge-on-friday . live .
- Web site: The I-85 Yadkin River Bridge, Salisbury, North Carolina . dead . https://web.archive.org/web/20140419025602/http://www.cagc.org/get_involved/awards_pinnacle_13winners.cfm . April 19, 2014 . April 17, 2014 .
- Web site: NCDOT's I-85 Corridor Improvement Project . E.S. Wagner Company . July 18, 2024 . July 18, 2024 . https://web.archive.org/web/20240718075014/https://www.eswagner.com/news/ncdots-i-85-corridor-improvement-project/ . live .
- Web site: I-85 Corridor Improvement Project, North Carolina – Verdict Traffic . July 18, 2024 . www.roadtraffic-technology.com . June 1, 2023 . https://web.archive.org/web/20230601220646/https://www.roadtraffic-technology.com/projects/i-85-corridor-improvement-project-north-carolina/ . live .
- News: North Carolina News . April 22, 2021 . Study: I-85 among top 30 'Deadliest Roads' in the U.S. . July 18, 2024 . CBS17 . July 18, 2024 . https://web.archive.org/web/20240718075011/https://www.cbs17.com/news/north-carolina-news/study-i-85-among-top-30-deadliest-roads-in-the-u-s/ . live .
- News: July 9, 1995 . 3 family members killed in accident on I-85 . July 18, 2024 . Winston-Salem Journal . B3 . Newspapers.com . July 15, 2024 . https://web.archive.org/web/20240715040232/https://www.newspapers.com/article/winston-salem-journal-3-family-members-k/151359862/ . live .
- News: Stradling . Richard . June 15, 2023 . Is the NC 86 bridge cursed? Southbound I-85 to close where a truck hit the overpass again . July 18, 2024 . News & Observer . June 15, 2023 . https://web.archive.org/web/20230615183715/https://www.newsobserver.com/news/local/counties/orange-county/article276432616.html . live .
- Web site: NCDOT: I-285 Gets Federal Approval as the Next New Interstate for North Carolina . May 9, 2024 . North Carolina Department of Transportation . en-US . May 9, 2024 . https://web.archive.org/web/20240509234746/https://www.ncdot.gov/news/press-releases/Pages/2018/I-285-Gets-Federal-Approval-as-the-Next-New-Interstate-for-North-Carolina.aspx . live .
- Web site: Goodpasture . Joe . August 19, 2008 . First portion of I-485 Opens . May 9, 2024 . Charlotte Magazine . en-US . May 9, 2024 . https://web.archive.org/web/20240509234743/https://www.charlottemagazine.com/first-portion-of-i-485-opens/ . live .
- Web site: FHWA – Center for Innovative Finance Support – Project Profiles . May 9, 2024 . Federal Highway Administration . June 10, 2024 . https://web.archive.org/web/20240610052323/https://www.fhwa.dot.gov/ipd/project_profiles/nc_i485_charlotte_outer_loop.aspx . live .
- Web site: Saunders . Tim . September 10, 2019 . Funding committed for long-awaited I-785, slated to reach Danville . May 10, 2024 . WBDJ . en . May 9, 2024 . https://web.archive.org/web/20240509234749/https://www.wdbj7.com/content/news/Funding-committed-for-long-awaited-Interstate-785-slated-to-reach-Danville-559967081.html . live .
- Web site: North Carolina Department of Transportation . May 9, 2024 . Proposed Interchange Numbering and Alignments for Routes I-885, Toll NC-885, and NC-147 . May 9, 2024 . North Carolina Department of Transportation . April 17, 2024 . https://web.archive.org/web/20240417100218/https://www.ncdot.gov/news/press-releases/Documents/2022-05-04-i-885%20corridor-map.pdf . live .
- Web site: North Carolina Department of Transportation . July 2019 . High Point Urban Area MPO:Removal of "Business 85" . May 9, 2024 . North Carolina Department of Transportation . January 31, 2020 . https://web.archive.org/web/20200131094702/https://www.highpointnc.gov/AgendaCenter/ViewFile/Agenda/_06252019-304 . live .