State: | MI |
Type: | I |
Route: | 696 |
Alternate Name: | Walter P. Reuther Freeway |
Map Custom: | yes |
Map Notes: | I-696 highlighted in red |
Map Alt: | I-696 runs east–west across Detroit's northern suburbs in Oakland and Macomb counties |
Established: | 1963 |
History: | Construction started in 1961 and completed December 15, 1989 |
Restrictions: | No flammable or explosive cargo between M-10 and I-75[1] |
Spur Type: | I |
Spur Of: | 96 |
Length Mi: | 28.368 |
Length Ref: | [2] |
Direction A: | West |
Terminus A: | in Farmington Hills |
Junction: |
|
Direction B: | East |
Terminus B: | in St. Clair Shores |
Counties: | Oakland, Macomb |
Previous Type: | I |
Previous Route: | 675 |
Next Type: | M |
Next Route: | 1 |
Interstate 696 (I-696) is an east–west auxiliary Interstate Highway in the Metro Detroit region of the US state of Michigan. The state trunkline highway is also known as the Walter P. Reuther Freeway, named for the prominent auto industry union head by the Michigan Legislature in 1971. I-696 is a bypass route, detouring around the city of Detroit through the city's northern suburbs in Oakland and Macomb counties. It starts by branching off I-96 and I-275 at its western terminus in Farmington Hills, and runs through suburbs including Southfield, Royal Oak and Warren before merging into I-94 at St. Clair Shores on the east end. It has eight lanes for most of its length and is approximately 10miles north of downtown Detroit. I-696 connects to other freeways such as I-75 (Chrysler Freeway) and M-10 (Lodge Freeway). Local residents sometimes refer to I-696 as "The Autobahn of Detroit".
Planning for the freeway started in the 1950s. Michigan state officials proposed the designation I-98, but this was not approved. Construction started on the first segment in 1961, and the Lodge Freeway was designated Business Spur Interstate 696 (BS I-696) the following year. The western third of the freeway opened in 1963, and the eastern third was completed in January 1979. The central segment was the subject of much controversy during the 1960s and 1970s. Various municipalities along this stretch argued over the routing of the freeway such that the governor locked several officials into a room overnight until they would agree to a routing. Later, various groups used federal environmental regulations to force changes to the freeway. The Orthodox Jewish community in Oak Park was concerned about pedestrian access across the freeway; I-696 was built with a set of parks on overpasses to accommodate their needs. The Detroit Zoo and the City of Detroit also fought components of the freeway design. These concessions delayed the completion of I-696 until December 15, 1989. Since completion, the speed limit was raised from 55mph70mph. In addition, some interchanges were reconfigured in 2006.
I-696, which has been called "Detroit's Autobahn" by some residents,[3] reflecting a reputation for fast drivers, begins in the west in the city of Novi as a left exit branching off I-96. This ramp is a portion of the I-96/I-696/I-275/M-5 interchange that spans the north–south, Novi–Farmington Hills city line linking together five converging freeways. The freeway curves southeasterly and then northeasterly through the complex as it runs eastward through the adjacent residential subdivisions. I-696 passes south of 12 Mile Road in the Mile Road System through Farmington Hills, passing south of Harrison High School and north of Mercy High School. After crossing into Southfield, I-696 passes through the Mixing Bowl,[4] another complex interchange that spans over 2miles near the American Center involving M-10 (Lodge Freeway and Northwestern Highway) and US Highway 24 (US 24, Telegraph Road) between two partial interchanges with Franklin Road on the west and Lahser Road on the east. The carriageways for I-696 run in the median of M-10 from northwest to southeast. East of this interchange, cargo restrictions have been enacted for the next 10adj=midNaNadj=mid segment of I-696; no commercial vehicles may carry flammable or explosive loads;[1] the segment passes below grade and between retaining walls that are 20feet-25feetft (-ft) tall, which would hinder evacuation in the event of a fire. During construction in April 1989, vandals set a fire under one of the plazas, and officials were concerned about the intensity of the fire and the potential for a "horizontal towering inferno" along the freeway section once opened to traffic.[5]
After passing through the Mixing Bowl, I-696 follows 11 Mile Road, which forms a pair of service drives for the main freeway. The Interstate passes through the city of Lathrup Village before turning southward and then easterly on an S-shaped path to run along 10 Mile Road. This segment of freeway is known for its extensive use of retaining walls; three large landscaped plazas form short tunnels for freeway traffic near the Greenfield Road exit. The freeway passes next to the Jewish Community Center of Metropolitan Detroit as it passes under the third pedestrian plaza. The Interstate then picks up 10 Mile Road, which forms a pair of service drives, as the Reuther runs along the border between the cities of Oak Park and Huntington Woods. I-696 follows the southern edge of the Detroit Zoo. Immediately east of the zoo, the Interstate intersects M-1 (Woodward Avenue), and crosses a line of the Canadian National Railway that also carries Amtrak passenger service between Detroit and Pontiac.
East of the rail crossing, I-696 has a four-level stack interchange with I-75 over the quadripoint for Royal Oak, Madison Heights, Hazel Park and Ferndale. This interchange marks the eastern end of the cargo restrictions.[1] I-696 jogs to the northeast near the Hazel Park Raceway, leaving 10 Mile Road. Crossing into Warren in Macomb County at the Dequindre Road interchange, the freeway begins to follow 11 Mile Road again. Near the Detroit Arsenal Tank Plant, I-696 has another stack interchange for Mound Road; through the junction, the freeway makes a slight bend to the south. The freeway continues east through the northern edge of Center Line, crossing a line of Conrail Shared Assets[6] and heading back into Warren. The Interstate crosses into Roseville near the M-97 (Groesbeck Highway) interchange and then meets M-3 (Gratiot Avenue) just west of the eastern terminus at I-94 (the Edsel Ford Freeway) in St. Clair Shores. The service drives merge in this final interchange and 11 Mile Road continues due east to Lake St. Clair.[7]
Like other state highways in Michigan, I-696 is maintained by the Michigan Department of Transportation (MDOT). In 2011, the department's traffic surveys showed that on average 185,700 vehicles used the freeway daily east of I-75 and 38,100 vehicles did so each day in part of the Mixing Bowl, the highest and lowest counts along the highway, respectively.[8] As an Interstate Highway, all of I-696 is listed on the National Highway System,[9] a network of roads important to the country's economy, defense, and mobility.[10]
I-696 is part of the original Interstate Highway System as outlined in 1956–58.[11] As originally proposed by the Michigan State Highway Department, the freeway would have been numbered I-98.[12] Construction started in 1961.[13] The Lodge Freeway, the first segment of which opened in 1957,[14] was given the Business Spur I-696 designation in 1962.[15] [16] The first segment of I-696 built was the western third of the completed freeway which opened in 1963–1964 at a cost of $16.6 million (equivalent to $ in). This section ran from I-96 in Novi east to the Lodge Freeway in Southfield.[17] The then-unfinished freeway was named for Walter P. Reuther, former leader of the United Auto Workers labor union after he and his wife died in a plane crash on May 9, 1970. The next year the Michigan Legislature approved the naming by passing Senate Concurrent Resolution 57.[18]
In the late 1970s, during the second phase of construction, lobbying efforts and lawsuits attempted to block construction of the central section. If successful, the efforts would have left the freeway with a gap in the middle between the first (western) and second (eastern) phases of construction.[13] During this time, MDOT assigned M-6 to the eastern section of the freeway under construction. Signs were erected along the service roads that followed 11 Mile Road to connect the already built stack interchange at I-75 east to I-94.[19] By the time the eastern freeway segment was initially opened in January 1979 between I-94 and I-75, the signage for M-6 was removed and replaced with I-696 signage;[20] it cost $200 million (equivalent to $ in) to complete.[17] Later in 1979, a closure was scheduled to allow work to be completed on three of the segment's nine interchanges.[20]
The central section was the most controversial. Governor James Blanchard was 15 years old and a high school sophomore in neighboring Pleasant Ridge when the freeway was proposed and purchased a home in the area in 1972.[13] He joked during remarks at the dedication in 1989, "The unvarnished truth about this freeway? I wasn't even alive when it was first proposed," and added, "frankly, I never thought it would go through."[13] Total cost at completion for the entire freeway at the end of the 30-year project was $675 million (equivalent to $ in).[21]
Arguments between local officials were so intense that during the 1960s, then-Governor George W. Romney once locked fighting bureaucrats in a community center until they would agree on a path for the freeway. During the 1970s, local groups used then-new environmental regulations to oppose the Interstate.[13] The freeway was noted in a Congressional subcommittee report on the "Major Interstate System Route Controversy in Urban Areas" for the controversies in 1970. Before 1967, local communities had to approve highway locations and designs, and the debates over I-696 prompted the passage of an arbitration statute. That statute was challenged by Pleasant Ridge and Lathrup Village before being upheld by the Michigan Supreme Court.[22] Lathrup Village later withdrew from a planning agreement in 1971; had that agreement been implemented, construction on the central section was scheduled to commence in 1974 and finish in 1976.[23]
The community of Orthodox Jews in Oak Park wanted the freeway to pass to the north of their suburb. When this was deemed to be futile, the community asked for changes to the design that would mitigate the impact of the freeway to the pedestrian-dependent community. Final approval in 1981 of the freeway's alignment was contingent on these mitigation measures.[24] To address the community's unique needs, the state hired a rabbi to serve as a consultant on the project.[13] In addition, a series of landscaped plazas were incorporated into the design, forming the tunnels through which I-696 passes. These structures are a set of three 700adj=midNaNadj=mid bridges that cross the freeway within a mile (1.6 km).[25] They allow members of the Jewish community to walk to synagogues on the Sabbath and other holidays[26] when Jewish law prohibits driving.[13] These plazas had their length limited; if they were longer, they would be considered tunnels that would require ventilation systems.[27]
The Detroit Zoo was concerned that noise and air pollution from the Interstate would disturb the animals. They were satisfied by $12 million (equivalent to $ in) spent on a new parking ramp and other improvements.[28] The City of Detroit tried to stop I-696 as well, but in the end the city was forced to redesign its golf course. A refusal to grant an additional 9feet of right-of-way by Detroit forced additional design and construction delays during the 1980s.[13]
One of the last obstacles to construction of the freeway was a wetlands area near Southfield. MDOT received a permit from the Michigan Department of Natural Resources to destroy of wetland and create a replacement 11acres area. In the process, some prairie roses and wetlands milkweed were transplanted from the path of I-696 in 1987.[29] The final section of the eight-lane freeway opened at a cost of $436 million[17] (equivalent to $ in) on December 15, 1989. At the time, one caller to a Detroit radio show commented, "do you realize we have been to the moon and back in the time it has taken to get that road from Ferndale to Southfield?"[13]
As part of the overall rehabilitation to the Mixing Bowl interchange, a new interchange at Franklin Road was to be constructed in 2006.[30] An exit ramp from I-696 eastbound to American Drive opened in April 2006. An entrance ramp from Franklin Road to I-696 westbound opened in July 2006. The Franklin Road overpass, which had been closed during this time, re-opened in October 2006.[31]
On November 9, 2006, the speed limit was increased from 65to along the length of I-696.[32] [33] During speed enforcement patrols in August 2022, the Michigan State Police gave out 77 citations during one 4-hour period including six arrests.[34] One motorist was driving at, while others were cited at 99,.[35]
In 2023, MDOT started a complete reconstruction of I-696 from I-275 in Farmington Hills to US 24 (Telegraph Road) in Southfield. The eastbound lanes were reconstructed in 2023, and the westbound lanes will be reconstructed the following year.[36]
During the reconstruction of the westbound lanes in 2024, I-696 had two lanes shifted onto the John C Lodge Freeway resulting in a temporary concurrency. This is the first time in the history of the I-696 that a concurrency with the Lodge freeway had been in-place.[37]
State: | MI |
Type: | BS 1957 |
Route: | 696 |
Location: | Detroit–Southfield |
Formed: | 1962 |
Deleted: | 1970 |
Length Mi: | 17.538 |
Business Spur Interstate 696 (BS I-696) was the designation given to the Lodge Freeway in the Detroit area in 1962.[15] [16] This NaNadj=midNaNadj=mid freeway was renumbered as part of US 10 in 1970, when that highway designation was shifted off Woodward Avenue.[38] [39]