Huizhou–Dayawan railway explained

Native Name:惠大铁路
Status:Operational
Stations:6
Open:January 2004 (Huizhou West-Dayawan)

The Huizhou–Dayawan railway or Huida railway is a single-track freight-only railway line located in Huizhou, Guangdong, China.

History

The railway was opened from to in January 2004, following 11 years of construction.

Work to extend the railway to the Huizhou Port had already started in December 2003.[1] The one-station extension to opened in December 2009.

A 1.87km (01.16miles) long branch connecting the Quanwan coal terminal was opened with the terminal on 1 November 2018.[2] The station at the Quanwan coal terminal is named .

Stations

Route

The line leaves the Beijing–Kowloon railway west of Huizhou West railway station in Huicheng District and heads south, through Huiyang District, to Dayawan railway station. The line then splits into multiple branches which terminate at the coast.

Future Development

There are proposals to electrify the railway, add a second track, and operate passenger services.[4]

Notes and References

  1. Web site: 25 December 2008. 惠大铁路进港线明年五一前通车. Huida Railway port extension will open before 1 May next year. zh. dead. https://web.archive.org/web/20111015182430/http://e.hznews.com/paper/djsb/20081225/03/1/. 15 October 2011. 19 February 2021. huizhou.cn.
  2. Web site: 1 November 2018. 粤东最大煤炭码头开始运营!盐田港控股荃湾煤炭港进港铁路今日通车. Eastern Guangdong's largest coal terminal started operation! Port Railway to Yantian Port holding Quanwan Coal Port opened today. 19 February 2021. 南方网. zh.
  3. Web site: 4月10日起,惠州3铁路站点更名!. 惠大铁路惠阳站更名为惠阳东站.
  4. Web site: 借助惠大铁路改造开通大亚湾客运列车?专家不赞成. 2022-12-14. epaper.oeeee.com. 2021-04-14. https://web.archive.org/web/20210414071258/http://epaper.oeeee.com/epaper/J/html/2018-01/31/content_7689.htm.