Hounslow Loop line explained

Hounslow Loop line
Box Width:auto
Type:Commuter rail, Suburban rail
System:National Rail
Status:Operational
Locale:Greater London
Stations:7
Open:1850
Owner:Network Rail
Operator:South Western Railway
Tracks:2
Electrification:750 V DC third rail
Speed:60mph
Map:
(Click to expand)
Map State:uncollapsed

The Hounslow Loop line is a railway line in southwest London which was opened by the London and South Western Railway in 1850. It leaves the Waterloo–Reading line at Barnes Junction and after some seven and a half miles rejoins it at a triangular junction between and . Barnes Railway Bridge carries the line over the River Thames. Passenger services, all operated by South Western Railway, either loop back to Waterloo by the junctions or continue southwest via Feltham. The line is electrified at 750 V DC (third rail). It provides access to the North London Line for freight services both passing through to the north east and connecting to the rail network to the south west.

Passenger services and rolling stock

Most service to stations on the Hounslow Loop line are provided by trains operating between London Waterloo and Weybridge via Staines.

As of December 2023, the typical weekday and Saturday service is 2 trains per hour in each direction to and from Waterloo. Trains use the Waterloo to Reading Line between Waterloo and Barnes, take the loop between Barnes Bridge and Hounslow stations, and operate to and from Weybridge via Staines.[1] [2]

On Sunday, service is reduced to hourly and diverted to Woking.

At peak hours, additional trains running do not serve Staines and Weybridge, but rather travel in a loop to and from Waterloo via Hounslow and Richmond.

Services are generally operated by Class 450 units operating in a 4 or 8 car configuration. Class 455 and Class 458 units also work the line. All units on the line are to be replaced by Class 701 Aventra units.[3] [4]

Ridership

The line has seen a steep increase in ridership levels in recent years, corresponding with the doubling of train frequencies from 2 trains per hour in each direction to 4 (except on Sundays). The line's seven stations had combined passenger numbers of 5.565 million in 2007–08 (based on station exits), a 162% increase on the 2004–05 figure of 2.122 million.

Recent changes

Most stations had platforms lengthened to allow the operation of 10 coach trains from May 2013.[5] Where this was not possible, selective door opening is used.

Platform 20 at Waterloo (within the former terminal) came into use in May 2014 to provide additional capacity.[6] [7]

Future developments

A proposal published in 2017 by the London Assembly and Transport for London envisages extending the London Overground network to run trains on the section of the Hounslow Loop Line between Brentford and Hounslow.[8] The scheme, known as the West London Orbital, would involve the re-opening of the Dudding Hill Line to passenger services and running trains from and via the planned station. A new station may be constructed at, close to Kew Bridge. The plans are currently at public consultation stage with TfL.[9]

Further reading

External links

Notes and References

  1. Web site: December 10, 2023 . Hounslow Loop to London Waterloo . April 20, 2024 . South Western Railway.
  2. Web site: 10 December 2023 . Weybridge via Staines to London Waterloo . 20 April 2024 . South Western Railway.
  3. News: Armitage . Jim . Business focus: Why your box-fresh train is being replaced . 8 April 2019 . Evening Standard . 14 February 2018 . en.
  4. News: Johnson . Marc . Waterloo dawn for South Western Railway . 8 April 2019 . Rail Staff . 11 September 2017.
  5. News: Longhurst . Chris . Hounslow Loop set for more trains and longer carriages by 2017 . 8 April 2019 . getwestlondon . 3 September 2014.
  6. Web site: New platform and 60 extra carriages for Waterloo commuters . Department for Transport . gov.uk . https://webarchive.nationalarchives.gov.uk/20121105140159tf_/http://www.dft.gov.uk/news/press-releases/dft-press-20111223/ . 5 November 2012 . en . 23 December 2011.
  7. Web site: Platform 20 at Waterloo finally opens (with five more to come) . urban75 forums . 19 May 2014 . 8 April 2019.
  8. Web site: Mayor's Transport Strategy 2018 . London City Hall . 26 July 2019 . https://web.archive.org/web/20190726120407/https://www.london.gov.uk/what-we-do/transport/our-vision-transport/mayors-transport-strategy-2018 . 26 July 2019 . en . 5 January 2015. live.
  9. Web site: West London Orbital . Transport for London . 30 July 2019 . https://web.archive.org/web/20190725161549/https://tfl.gov.uk/corporate/publications-and-reports/west-london-orbital . 25 July 2019 . en.