Horden railway station explained

Horden
Symbol Location:gb
Symbol:rail
Borough:Horden, County Durham
Country:England
Coordinates:54.7639°N -1.3073°W
Map Type:United Kingdom County Durham
Grid Name:Grid reference
Owned:Network Rail
Manager:Northern Trains
Platforms:2
Tracks:2
Code:HRE
Original:North Eastern Railway
Pregroup:North Eastern Railway
Events:Resited and reopened

Horden (also known as Horden Peterlee during the planning stage) is a railway station on the Durham Coast Line, which runs between Newcastle and Middlesbrough via Hartlepool. The station, situated 10miles south-east of Sunderland, serves the villages of Horden, Blackhall Colliery and Easington along with the town of Peterlee in County Durham, North East England. It is owned by Network Rail and managed by Northern Trains.

The station opened on 29 June 2020, following a £10.55 million investment.[1] [2] It is the second station to have been located in the village, having replaced an earlier station, located approximately 200yd further south, which closed on 4 May 1964 during the Beeching cuts.

History

The original station at Horden was opened by the North Eastern Railway on 1 April 1905.[3] The station opened as part of the North Eastern Railway's project to build a new coastal line, by linking together and on the routes of the earlier Londonderry, Seaham and Sunderland Railway and Hartlepool Dock and Railway. This new line had been constructed primarily to avoid the steep gradients of the inland route at Seaton Bank and Hesleden Bank,[4] but also provided access to the newly developed collieries of the Durham Coast.[5]

A six-inch Ordnance Survey map from 1922 shows the station, along with a station hotel, located at what was then the southern end of the new settlement, which was built to house workers from the nearby Horden Colliery.[6]

The new town of Peterlee was established in 1948,[7] and is located about a mile to the west of Horden. Hence, at the time, Horden had been the closest railway station to the town. However, despite the development of this new town, the station was recommended for closure in the Beeching Report and was duly closed on 4 May 1964. Nearby stations at and were also closed.[8]

Reopening

It had been a long-held ambition of Durham County Council to reopen a station on the Durham Coast Line between Seaham and, to serve the communities of in the county's south east. The council investigated seven potential sites in the area, initially selected a site adjacent to the Sea View Industrial Estate in Horden as the most suitable for a new station.[9] The site was located about NaNmiles to the north of the original station.

It was identified that one of the key benefits of reopening Horden, as opposed to any of the other closed stations on the Durham Coast Line was the station's close proximity to Peterlee, which has grown significantly since 1964. This allowed the potential for 61,000 residents to benefit from improved access to employment opportunities across the region.[10] Durham County Council had applied for funding from the first round of the Department for Transport's New Stations Fund in 2013, but were unsuccessful at that stage.[11]

In September 2016, Durham County Council announced that a new preferred site had been identified at South East View, Horden, and a public consultation was launched,[12] in order to gauge the potential usage of a reopened station. This site is located about 200yd from the original station,[13] significantly closer than the earlier proposal.

In July 2017, it was announced that the station would be built with a contribution of £4.4 million in funding from the second round of the New Stations Fund,[14] with the remainder of the scheme's £10.5 million cost being covered by funding which has already been provided by Durham County Council and the North East Combined Authority.[15] Network Rail submitted a planning application for the new station on 1 November 2018,[16] and this was duly approved on 7 January 2019.[17]

The first stage of construction work for this project, involving the creation of the station car park and adjacent bus stop, commenced on 28 May 2019.[18] It was later followed by the construction of the station itself, as well as associated signalling and track realignment works, in the second stage.[19] In late April 2020, having completed both platforms, the station's footbridge and associated ramps and stairs were installed by Story Contracting, using a 500 tonne crane. Following this, work progressed through mechanical, electrical and telecoms works and, finally, interface works between the station and car park.[20]

The station opened on 29 June 2020. It had originally been expected to be open in March 2020,[21] but this was later revised to May 2020.[22] This May 2020 opening date was also missed owing to a requirement to adjust working practices in response to the COVID-19 pandemic.[23]

Facilities

The station has two platforms, both of which have ticket machines, seating, waiting shelters, next train audio and visual displays and an emergency help point in the refuge area on both platforms as well as in the centre. The platforms are linked by an accessible footbridge. There is a car park with 139 spaces, as well as facilities for drop-off, a taxi rank and a bus stop with bus connections to Peterlee.[24]

The station is part of the Northern Trains penalty fare network, meaning that a ticket or "promise to pay" notice is required prior to boarding.[25]

Services

As of the May 2021 timetable change, the station is served by an hourly service between Newcastle and Middlesbrough. Most trains continue to Hexham (or Carlisle on Sunday) and Nunthorpe. Two trains per day (three on Sunday) continue to Whitby. All services are operated by Northern Trains.[26]

Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter

Notes and References

  1. Web site: Thompson. Fiona. 29 June 2020. First trains to make their stop at new £10.55 million train station in Horden. 29 June 2020. Sunderland Echo. en.
  2. Web site: Seddon. Sean. 29 June 2020. Horden train station opens today for first time in more than 50 years. 29 June 2020. ChronicleLive.
  3. Book: Body, Geoffrey. PSL Field Guides – Railways of the Eastern Region. Patrick Stephens Limited. 1989. 1852600721. 2. 66, 85 and 150.
  4. Book: Hill, Norman. Teesside Railways: A View From The Past. Ian Allan Publishing Ltd.. 2001. 0711028036. 48.
  5. Web site: Trenholm. Dru. Blackhall Colliery and Village History. 14 July 2017. Durham in Time.
  6. Web site: Hatcher. Jane. Horden – a short history. 14 July 2017. Durham in Time.
  7. Web site: Peterlee history . 14 July 2017 . 1 August 2017 . https://web.archive.org/web/20170801113445/http://www.apollopavilion.info/history/peterlee/peterlee-history/ . dead .
  8. Book: Waller, Paul. Rail Atlas: The Beeching Era. Ian Allan Publishing Ltd.. 2013. 9780711035492. 67 and 104.
  9. News: New Peterlee rail station is still right on track. The Journal. 30 January 2016. 31 January 2016. https://web.archive.org/web/20160131091719/http://www.thejournal.co.uk/news/north-east-news/new-peterlee-rail-station-still-4443690. dead.
  10. News: 17 September 2014. Plans to build long-awaited Horden station 'progressing'. Rail Technology Magazine. 30 January 2016.
  11. Web site: New Stations Fund. 29 June 2020. Network Rail.
  12. Web site: Engelbrecht. Gavin. 27 September 2016. Plans for a new railway station in Horden remain on track. 1 August 2017. The Northern Echo.
  13. Web site: 6 January 2020. Work starts on new £10.55m Horden Railway Station. 12 May 2020. East Durham News.
  14. Web site: Maynard. Paul. 28 July 2017. New station boost for passengers thanks to £16 million government investment. 29 June 2020. Department for Transport. en.
  15. Web site: Clark. Kevin. 28 July 2017. East Durham to get new railway station after £4.4 million Government funding announcement. dead. https://web.archive.org/web/20170728181324/http://www.sunderlandecho.com/news/east-durham-to-get-new-railway-station-after-4-4million-government-funding-announcement-1-8674754. 28 July 2017. 29 July 2017. Sunderland Echo.
  16. Web site: 1 November 2018. 'Sorely needed' Horden station plan submitted. 7 January 2019. BBC News.
  17. Web site: 7 January 2019. Work to start in weeks after new £10m railway station gets the go-ahead. 29 June 2020. Hartlepool Mail.
  18. Web site: Kennedy. Poppy. 28 May 2019. Work starts on new £10 million railway station expected to bring economic boost to the region. live. https://web.archive.org/web/20190528134820/https://www.sunderlandecho.com/business/work-starts-on-new-10million-railway-station-expected-to-bring-economic-boost-to-the-region-1-9791908. 28 May 2019. 29 June 2020. Sunderland Echo.
  19. Web site: Story wins contract to build new station in County Durham. 18 July 2019. Rail Technology Magazine. 22 July 2019. 22 July 2019. https://web.archive.org/web/20190722141757/http://www.railtechnologymagazine.com/rail-news/story-wins-contract-to-build-new-station-in-county-durham. dead.
  20. Web site: 1 May 2020. Story tackles Covid challenges. 12 May 2020. The Construction Index.
  21. Web site: New station boost for passengers thanks to £16 million government investment . 2023-08-24 . GOV.UK . en.
  22. Web site: Horden Station - Durham County Council. Durham County Council. 12 May 2020.
  23. Web site: Thompson. Fiona. 7 May 2020. Work on new train station slowed by coronavirus – but launch should still happen this summer. 12 May 2020. Hartlepool Mail.
  24. Web site: Station facilities for Horden (HRE). 29 June 2020. National Rail Enquiries.
  25. Web site: Penalty Fares. 29 June 2020. Northern Trains. en-gb.
  26. Web site: 16 May 2021. Train times: Nunthorpe and Middlesbrough to Newcastle and Metrocentre. 13 June 2021. Northern Trains. 13 June 2021. https://web.archive.org/web/20210613094708/https://d11vpqhghel6qd.cloudfront.net/images/timetables/bucket2/nunthorpe-and-middlesbrough-to-newcastle-and-metrocentre-4375-qu4gb1.pdf. dead.