Honda of Canada Manufacturing explained

Honda of Canada Manufacturing (French: Honda Canada Inc.) is located in Alliston, Ontario and is the automobile manufacturing division of Honda Canada Inc.[1]

Manufacturing

The Honda of Canada Manufacturing (HCM) plants in Alliston have a land area of 450acres and have their own recreation centre with a full NHL-sized hockey arena, physical fitness areas, a baseball diamond, and volleyball and tennis courts. The large cavernous plants require radios between members for communication and cold water chillers for HVAC systems.

, the three plants have more than 4,200 employees and have an annual capacity of 390,000 vehicles. Plant 1 was built in 1986. It is the first Canadian manufacturing facility by a Japanese automaker.[2] A stamping and bumper painting line was added in 1989. Production of the Civic coupe commenced in 1993.[3] Honda's second plant in Alliston began production in 1998, originally building Honda Odyssey vans for the 1999 model year. Production of the Odyssey in Canada stopped in 2004 to make room for the Ridgeline.[4] Production of the Honda Pilot in Canada stopped in 2007 to allow Civic sedans to be built in Plant 2.

In May 2006, Honda announced it would build a 154 million engine plant in Alliston to supply about 200,000 engines a year for the Civic model.[5] [6] [7] The plant opened in 2008.[8] The plant has capacity of 190,000 four-cylinder engines.

Early 2009 saw the end of Ridgeline production at the Alliston Assembly facility.[9] Ridgeline production has been moved to Honda's Alabama assembly line.[4] The discontinuance of Ridgeline production would make room for more Civic production at Plant 2.

January 29, 2009 Honda announced further reductions in production at the Alliston plant. "One assembly line at the facility will go from two daily work shifts to one. Output of Civic and Acura MDX models made on the line will be halved from 800 units a day to 400 units." [10]

In early 2012, Honda of Canada Manufacturing became Honda's first plant in North America to produce four distinct models: Civic, CR-V, MDX and ZDX from the same production line, demonstrating its flexibility and capability.[11]

On March 28, 2013, the last Acura MDX was assembled in Alliston. Production was moved to Honda's Alabama plant. Since 2000 (2001 model year), a total of 713,158 MDXs were manufactured at HCM. Honda of Canada Manufacturing now builds Civics and CR-Vs only. In February 2020, Honda built its nine-millionth vehicle in Ontario.[12]

In March, 2022, Honda announced it would invest 1.38 billion over six years in part to upgrade and retool Alliston plant to become the global lead plant for the 2023 CR-V. The federal and provincial governments agreed to each provide conditional contribution of 131.6 million.[13] [14] [15] [16] The investment will also cover the engine plant and Plant 1.[17]

Production of the 2023 CR-V started in September 2022, followed by hybrid model. Honda plans to increase the hybrid model to 50 percent of CR-V sales in North America.[18]

Current products

PlantLocationYear openedYear closedNotes
Alliston Plant 1Alliston, Ontario1986Models:
Alliston Plant 2Alliston, Ontario1998Models:

Former products

References

  1. Web site: HONDA OF CANADA MFG. EXPANDS EXPORT DESTINATIONS WITH EUROPEAN SPEC CR-V (Mar 31, 2015). world.honda.com. Honda. 28 January 2017.
  2. Web site: Touring Ontario's Honda Canada Manufacturing plant . openroadautogroup.com . 8 September 2020 . en.
  3. Web site: Our Company – Honda Canada Manufacturing . Honda of Canada Mfg. . 21 September 2020.
  4. http://www.autonews.com/article/20080311/OEM01/303119995/honda-to-build-ridgeline-in-alabama Honda to build Ridgeline in Alabama
  5. News: Honda to open new Alliston plant. 28 January 2017. CBC. May 17, 2006.
  6. Web site: Honda to build new engine plant in Alliston, Ontario. autos.ca. 28 January 2017.
  7. Web site: McGuinty Government Partners With Honda Canada To Bring Innovative Engine Facility To Ontario. Gov't of Ontario. 28 January 2017.
  8. Web site: Honda Opens New Engine Plant In Ontario (Sep 25, 2008). world.honda.com. Honda. 28 January 2017.
  9. http://news.honda.com/newsandviews/report.aspx?g=issue-brief&id=ln_5147i Honda 2017 Digital FactBook
  10. [National Post]
  11. Web site: CANADIAN PRODUCTION OF THE ALL-NEW 2012 HONDA CR-V BEGINS AT HONDA OF CANADA MFG. IN ALLISTON, ON (Jan 23, 2012). hondanews.ca. Honda Canada Inc.. 28 January 2017. 2 February 2017. https://web.archive.org/web/20170202050718/http://www.hondanews.ca/en/news/release/CANADIAN-PRODUCTION-OF-THE-ALLNEW-2012-HONDA-CRV--BEGINS-AT-HONDA-OF-CANADA-MFG-IN-ALLISTON-ON. dead.
  12. Honda Reaches Major Sales and Manufacturing Milestones in Canada . www.newswire.ca . Honda Canada Inc . 8 September 2020 . en.
  13. Honda of Canada Mfg. to Invest more than $1.38 billion in Ontario Manufacturing Plants in Preparation for Electrified Future . 19 April 2023 . Honda Canada Corporate Newsroom . 16 March 2022 . en.
  14. News: Guignard . Jonathan . Honda's Alliston plant to build next-generation hybrids as part of $1.38B investment for electric transition . 19 April 2023 . CTV Barrie . 15 March 2022 . en.
  15. News: Callan . Isaac . Honda confirms plan to switch Ontario plant to hybrid vehicles Globalnews.ca . 19 April 2023 . Global News . 16 March 2022.
  16. News: Herald . Brad Pritchard Alliston . 'Big challenge': Honda plant in Alliston begins mass production of 2023 CR-V . 19 April 2023 . Simcoe . en.
  17. News: Honda's $1.4B investment in Ontario plants will lead to 2023 CR-V Hybrid assembly . 19 April 2023 . Automotive News Canada . 16 March 2022 . en.
  18. Production of All-New 2023 Honda CR-V Begins in North America . 19 April 2023 . Honda Canada Automobiles Newsroom . 22 September 2022 . en.

External links

44.1481°N -79.8451°W