Country: | VNM |
Type: | CT |
Route: | 29 |
Translation: | HCMC-Long Thanh-Dau Giay Expressway |
Alternate Name: | Đường cao tốc TPHCM-Long Thành-Dầu Giây |
Length Mi: | 34 |
Length Km: | 55 |
Maint: | Vietnam Expressway Corp (VEC) |
Photo Notes: | Long Thanh bridge on the route pass Dong Nai river |
Established: | 8 February, 2015 |
Ahn: | (Long Thành - Lộ 25) (Lộ 25 - Long Trường) |
Map Custom: | yes |
Direction A: | West |
Terminus A: | Mai Chi Tho, Luong Dinh Cua, and Nguyen Thi Dinh street at An Phú Intersection, District 2, Ho Chi Minh City |
Junction: |
|
Direction B: | East |
Terminus B: | at Dau Giay Interchange, Thống Nhất District, Dong Nai. |
Provinces: | Hồ Chí Minh City, Đồng Nai |
The Ho Chi Minh City–Long Thanh–Dau Giay Expressway (Vietnamese: Đường cao tốc Thành phố Hồ Chí Minh-Long Thành-Dầu Giây)is a Expressway section of the Expressways of Vietnam, 55.7 km long and has its starting point at Long Truong intersection in Thủ Đức and the end point at Dầu Giây Interchange, Thống Nhất district, Đồng Nai. This Expressway is part of the Asian Highway Network (AH1).
This route passes through 2 provinces and cities: HCMC and Đồng Nai.
According to planning from 2015 to 2021, this entire expressway used to be part of the North-South Expressway[1] before being separated into an independent expressway (only the Long Thành - Lộ 25 section still belongs to this system). However, in reality, this expressway is still denoted as CT.01 on some signposts of this expressway. This expressway is part of the AH1 system (section of Lộ 25 - Long Trường).
The project was started on October 3, 2009 with a scale of 4 lanes and a total length of 55.7 km.[2] The investor is Vietnam Expressway Development Investment Corporation (VEC) with total investment in phase I: 997.67 million USD ((equivalent to 20,630 billion VND) [3] .The project is sponsored by the Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA).
About 20 km out of a total of 55 km of the expressway, the section from Ring Road 2 to National Highway 51 in Dong Nai province was opened to traffic on 2 January, 2014.[4] .On 29 August, 2014, Ring Road 2 intersection opened to traffic. The 4 km long road from An Phu intersection, Mai Chi Tho Avenue to Ring Road 2 intersection opened to traffic on 10 January, 2015. All The expressway opened to traffic on 2 February, 2015, when the 31 km long Long Thanh - Dau Giay section completed construction.
Currently, Vietnam Expressway Development Investment Corporation (VEC) is researching investment in expanding the section from Ring Road 2 intersection to the intersection with Bien Hoa - Vung Tau Expressway, 21.92 km long, from 4 to 8 - 10 lanes, total investment is about 14,786 billion VND.
The expressway has a total length of 55.7 km and is divided into two sections:
Total length: 55.7 km
No. | Name | Dist. from Origin (km) | Connections | Notes | Location | ||
---|---|---|---|---|---|---|---|
Connect with Lương Định Của Road | |||||||
1 | An Phú IC | 0.0 | Vo Van Kiet-Mai Chi Tho Avenue | Beginning of the expressway Construction is underway to expand the scale of the intersection | Thành phố Hồ Chí Minh | Thủ Đức | |
2 | Đỗ Xuân Hợp JCT | 2.6 | Đỗ Xuân Hợp Road | Exit to Do Xuan Hop street Entrance towards An Phu | |||
3 | Khang Điền JCT | 3.6 | Exit towards An Phu | ||||
4 | Ring Road 2 IC | 5.9 | Võ Chí Công Road | ||||
5 | Long Trường IC | 8.7 | Ring Road 3 HCMC | Under Construction | |||
TG | Long Phước Tollgate | 10.8 | |||||
6 | Long Phước IC | Long Phước Road | Proposing | ||||
BR | Long Thanh Bridge | ↓ | pass Đồng Nai River | Thành phố Hồ Chí Minh – Đồng Nai Boundary | |||
SA | Tam An Technical Maintenance Center | 14.0 | Đồng Nai | Long Thành | |||
7 | Provincial Road 319 | 19.9 | Provincial Road 319 | Nhơn Trạch | |||
8 | National Highway 51 IC | 23.5 | National Highway 51 | Long Thành | |||
9 (3) | Long Thành IC | 25.4 (1766.5) | Bien Hoa–Vung Tau Expressway | Connect with Ben Luc – Long Thanh Expressway Under Construction | |||
10 (2) | Ring Road 4 IC | 39.2 (1762.7) | Ring Road 4 HCMC | No construction | Cẩm Mỹ | ||
SA | Rest stop | 41.2 (1760.7) | |||||
11 (1) | Lộ 25 IC (Cẩm Mỹ IC) | 43.5 (1758.4) | Phan Thiet-Dau Giay Expressway | Thống Nhất | |||
TG | Dầu Giây Tollgate | 54.6 | |||||
BR | ↓ | Pass North–South railway | |||||
12 | Dầu Giây IC | 55.7 | National Highway 1 | ||||
Connect directly to Dau Giay-Lien Khuong Expressway (No construction)References |