Hitchin Flyover Explained

Hitchin Flyover
Carries:Down Cambridge Flyover line
Crosses:East Coast Main Line
Named For:Hitchin
Lanes:Single track
Built:2010 - 2012
Begin:2010
Complete:2013
Opened:2013

The Hitchin Flyover is a grade-separated single-track railway viaduct near Hitchin, Hertfordshire, England, which carries the Down Cambridge Flyover line[1] over the East Coast Main Line. Constructed between 2012 and 2013, it connects the westernmost track of the East Coast Main Line with the Cambridge line. The flyover was built to increase the throughput at Cambridge Junction,[2] a congested flat junction, which put severe constraints on capacity on both lines.

History

Together with the Digswell Viaduct some ten miles to the south, the flat junction just north of was a major bottleneck,[3] as northbound trains diverging from the East Coast Main Line towards Letchworth and thence to Cambridge had to cross one northbound (fast) line and two southbound (fast and slow) lines to access the Cambridge Line. Proposals as part of the original electrification work in the early 1970s[4] envisaged a new underpass here and land was set aside for its construction. However, budgetary constraints forced this part of the programme to be abandoned. The land stood empty for many years, but has since been used to provide new housing.

A new plan[5] and subsequent application for an order[6] to build a flyover was approved after a Planning Inspectorate report and public inquiry between 11 and 25 May 2010.[7]

Construction was completed in June 2013. Original plans were to build the embankment using aggregate trucked in from elsewhere,[6] but eventually it was decided to build up the embankment using chalk taken from the nearby Wilbury Hills, low-lying chalk hills forming part of the Chiltern Hills, from less than 1miles away, removing the need for lorry movements along public roads. The chalk was quarried from just beyond the ancient Icknield Way, which at this point is a public bridlepath between Ickleford and Letchworth Garden City, and the contractor was required to refill and replant the quarry afterwards.[7] [8] [9]

Since the embankment materials were locally sourced it also meant that the new embankment was effectively pre-seeded with poppies. This means the entire embankment is covered in red poppies during their flowering season giving the name to the location 'Poppy Bank'.

Design

The scheme, which can be used by passengers services and heavy freight, has created a new single-track line that diverges from the northbound slow line at Hitchin North Junction[10] just beyond Hitchin station, using a short embankment section of the former Bedford to Hitchin Line, a section of which was cleared of vegetation and made progressively higher, to form a short ramp. The track is carried over the East Coast Main Line on a newly constructed viaduct and onto a new embankment to join the present Cambridge Line at the newly created Hitchin East Junction,[10] closer to .

Although this routing skirts around the flat junction in a curve that takes trains over a physically longer distance, it removes the need for them to dwell at Hitchin  - sometimes for several minutes  - awaiting a path across the tracks of the main London–Peterborough route, thus decreasing the overall journey time to Cambridge in many instances. The scheme improves the punctuality and reliability of both the London–Cambridge and London–Peterborough routes, the latter because Peterborough-bound stopping trains are no longer delayed if running closely behind a Cambridge service being held at Hitchin waiting to cross the flat junction.

The flat junction remains in use, providing an alternative route from either the Down Fast or Down Slow line to the Cambridge line.[1]

Operation

On 26 June 2013, passenger services began to use the flyover, with up to three services per day using it during regular service and driver training. The flyover came into full use in December 2013 with the introduction of the new timetable.[11]

Trains to Letchworth and Cambridge are timetabled to take one minute longer than in the reverse direction. For example, trains from King's Cross to Cambridge which used to leave at XX.15 now leave at XX.14.

By January 2015 the only form of traction not to have used the flyover was electric locomotives (regular services are electric multiple units); Union of South Africa became the first steam locomotive on the flyover when it moved empty coaching stock to Cambridge in preparation for a tour to York.

Notes and References

  1. Web site: NR London North Eastern Sectional Appendix / LN125 Seq 001. Network Rail. Jan 2015. 8 July 2015. https://web.archive.org/web/20131205133159/http://www.networkrail.co.uk/browse%20documents/sectional%20appendix/london%20north%20eastern%20sectional%20appendix.pdf. 5 December 2013. dead.
  2. Web site: NR London North Eastern Sectional Appendix / LN101 Seq 010. Network Rail. Jan 2015. 12 July 2015. https://web.archive.org/web/20131205133159/http://www.networkrail.co.uk/browse%20documents/sectional%20appendix/london%20north%20eastern%20sectional%20appendix.pdf. 5 December 2013. dead.
  3. Web site: APPENDIX 2: Issues in defining and measuring railway capacity. 13 February 2006. 28 February 2014. 2. Office of Rail Regulation.
  4. Web site: Your New Electric Railway: The Great Northern Suburban Electrification. British Railways Board . British Railways Board . 15 April 2010 .
  5. Web site: Hitchin Flyover. Network Rail . Network Rail . 28 February 2014 .
  6. Web site: NETWORK RAIL (HITCHIN (CAMBRIDGE JUNCTION)) ORDER MINDED VIEW LETTER . . 28 February 2014 . 20 October 2010.
  7. Web site: Network Rail (Hitchin (Cambridge Junction)) Order. Report to the Secretary of State for Transport. Department for Transport (United Kingdom). 6 August 2010. Watson. J. P.. 28 February 2014. Planning Inspectorate.
  8. Web site: Land north and east of Cadwell Lane and Wilbury Way and west of Stotfold Road, Hitchin (Hitchin Railway Curve). North Hertfordshire District Council. May 2012. 28 February 2014.
  9. News: Mixed Reviews on Network Rail's Plans for Hitchin Rail Curve Project. Burge. Laura. 2 May 2012. 28 February 2014. The Comet.
  10. Web site: NR London North Eastern Sectional Appendix / LN126 Seq 001. Network Rail. June 2013. 8 July 2015. https://web.archive.org/web/20131205133159/http://www.networkrail.co.uk/browse%20documents/sectional%20appendix/london%20north%20eastern%20sectional%20appendix.pdf. 5 December 2013. dead.
  11. First passenger services start using Hitchin flyover . First Capital Connect . 28 June 2013. 26 June 2013.