Hinze Dam | |
Location Map: | Queensland |
Location Map Caption: | Location of the Hinze Dam in Queensland |
Coordinates: | -28.0506°N 153.2839°W |
Country: | Australia |
Location: | South East Queensland |
Status: | O |
Operator: | SEQ Water |
Dam Type: | E |
Dam Height: | 108m (354feet) |
Dam Length: | 1850m (6,070feet) |
Dam Volume: | 4261e3m3 |
Dam Crosses: | Nerang River |
Spillway Type: | Uncontrolled |
Spillway Capacity: | 550m3/s |
Res Name: | Advancetown Lake |
Res Capacity Total: | 310730ML[1] |
Res Catchment: | 207km2 |
Res Surface: | 1500ha |
The Hinze Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Nerang River in the Gold Coast hinterland of South East, Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region.[2] The impounded reservoir is called Advancetown Lake.[3] [4]
Hinze Dam was named in honour of local pioneers Carl and Johanna Hinze (grandparents of Queensland politician Russ Hinze) who lived in the valley that was flooded by the dam.[5] [6] The dam is almost always full, reaching 96% of capacity even during dry spells.[7]
The dam is located in Advancetown, 15km (09miles) south-west of Nerang immediately downstream of the confluence of the Nerang River and Little Nerang Creek.The earthfill dam structure is high and long. The 4261e3m3 dam wall holds back the 310730ML reservoir when at full capacity. From a catchment area of that includes the Numinbah Valley and Springbrook Plateau, with most being contained within state forests and national parks, the dam creates Advancetown Lake, with a surface area of . The uncontrolled un-gated spillway, located at above sea level, has a discharge capacity of .[2] [1] [8] Initially managed by the Gold Coast City Council up until 2008, the dam is now managed by Seqwater.
The dam also provides the benefit of flood mitigation to populated areas along the Nerang River downstream of the dam.[8]
The Southport Town Council planned the dam in 1947.[9] It was completed in 1976 and expanded in 1989 and 2011.
Stage One was completed in 1976, and provided 42400ML of potable water storage and supply.
Stage Two was completed in 1989, when storage of potable water was increased to 161070ML. This stage was completed at a cost of A$42 million and involved raising the main embankment, spillway and intake towers by approximately to create a surface area of .[2]
In 2004 the Gold Coast City Council resolved to construct Stage 3 of the dam. When the dam reached full capacity, on 7 January 2008 work began on Stage 3[10] and was completed on 19 December 2011. After nearly four years of construction the construction cost was A$395 million.[8] [11] The Stage 3 works increased the height of the dam wall from to, and increased the reservoir capacity from 161070ML to 310730ML, with the added purpose of flood mitigation, beyond water supply.[8] [11] [12] Stage 3 construction was completed by the Hinze Dam Alliance, a joint venture between Seqwater, with private sector partners URS Corporation, Sinclair Knight Merz and Thiess. The additional works with a higher dam wall provided homes below the dam wall with flood protection from a 1974 Brisbanestyle flood event.[12]
The eastern boat ramp is located in Mudgeeraba and features a craft and paddle launching platform as well as toilets and bin facilities. The western boat ramp, located in Springbrook, contains the same amenities with a smaller car park. In 2012 a body was discovered by fishermen.[13]
Advancetown Lake is a popular recreational facility for Gold Coast residents. Since the Stage 3 upgrade, recreational activities allowed include walking, electric or manual-powered boating, fishing, biking and horse riding. The facilities are open from 6 am to 6 pm daily.[11] No camping is permitted around the lake. Dogs are also not permitted, while swimming has been strongly discouraged.[14] An interpretive centre was opened on 19 December 2011, along with new parking, walking trails, toilet facilities and barbecue areas.[11] The final design of the dam was criticised in the media and by residents and politicians, some describing it as a "concrete bunker". The criticism arose because of a reduction in playground, boating and barbecue facilities; the banning of dogs; the extensive use of concrete; and because many of the facilities are either far from the water's edge or below the dam wall with no water views.[14]
Advancetown Lake has two boat ramps, one on the western and another on the eastern side.
The dam is stocked with Mary River cod, silver perch, golden perch, southern saratoga and bass, while spangled perch are also present naturally.[15] Banded grunter have been found in the lake and being illegally introduced, it is recommended that, if caught, they should be destroyed.[15] A Gold Coast City Council permit is required to fish in the dam.[16] A Queensland State Government Stocked Impoundment Permit is not required.[17]
From December 2018, Queensland Health advise not to consume fish from Hinze Dam due to elevated levels of mercury in recent fish samples.[18]
The Gold Coast hosted the 2018 Commonwealth Games. The area surrounding the Hinze Dam was originally proposed as the location for the mountain bike competition. A new course was constructed to meet international competition requirements. Some government representatives as well as some mountain bikers have sought to have the competition moved away to the unsecured trails at Nerang State Forest. The Gold Coast Mountain Bike Club maintain the course and sometimes host a race on the circuit the first Sunday of each month.[19]