Hilltopper (train) explained

Hilltopper
Type:Inter-city rail
Status:Discontinued
Locale:Eastern United States
First:June 1, 1977
Last:September 30, 1979
Predecessor:Mountaineer
Formeroperator:Amtrak
Start:Boston, Massachusetts
Stops:34
End:Catlettsburg, Kentucky
Distance:1674miles
Journeytime:26 hours 35 minutes
Frequency:Daily
Trainnumber:34, 35 (until January 8, 1978)
66, 67
Catering:On-board cafe
Stock:Amfleet coaches
Owners:Amtrak, RF&P, N&W
Map State:collapsed

The Hilltopper was a passenger train operated by Amtrak in the Mid-Atlantic region of the United States. It ran daily from South Station in Boston, Massachusetts to Catlettsburg station in Catlettsburg, Kentucky. The 1674miles run made 34 stops in 11 states and the District of Columbia.[1]

History

The Chicago-Norfolk Mountaineer, introduced in 1975, suffered from low ridership and high costs. Despite its failings, West Virginia senator Robert Byrd demanded that Amtrak replace it with another train on the Norfolk and Western Railway (N&W) to serve his rural constituents - and that the new train would use new Amfleet equipment and serve Washington, D.C. The Washington-Catlettsburg Hilltopper replaced the Mountaineer on June 1, 1977.[2] The Hilltopper retained all Mountaineer stops between Catlettsburg and Petersburg, Virginia, while the James Whitcomb Riley (which had run combined with the Mountaineer west of Catlettsburg) continued to provide a Chicago connection. Only Norfolk and Suffolk, Virginia lost train service; a bus connection to Petersburg was provided.[3]

The Hilltopper had warm supporters in Byrd and West Virginian congressman Harley Staggers but it was "cited by critics as an example of everything that was wrong with Amtrak".[4] Beginning on January 8, 1978, the Hilltopper was combined with the Night Owl, creating through service from Boston to Catlettsburg, Kentucky.[5] Even with this effort to improve its farebox recovery ratio, the train averaged 33 passengers per trip in 1978, dropping to between 2 and 15 per trip in 1979. Its average speed of was the lowest on the long-distance system. Farebox recovery was a dismal 25%, with the train losing $200,000 per year.

The Hilltopper was one of five routes cut on October 1, 1979, as part of a reorganization by the Carter Administration, and the only of the five where no federal injunctions were obtained to keep service running. Many of the train's riders were former N&W employees with lifetime passes. The Night Owl continued to be run after the cut.[6]

The end of the Hilltopper spelled the end of intercity rail service along much of its route in Southwest Virginia and West Virginia. However, one daily Northeast Regional round trip was extended from Lynchburg to Roanoke on October 31, 2017.[7]

Proposed restored service

As recently as October 2019, passenger rail advocates are pushing for restoration of east-west service from Christiansburg and the Blue Ridge Mountains to the Hampton Roads area, via Roanoke, Lynchburg, Charlottesville, and Richmond with a "Commonwealth Corridor." This would be the first cross-Virginia passenger train since the Hilltopper.[8] [9]

A 2021 feasibility study for the corridor conducted by the Virginia Department of Rail and Public Transportation estimated that the service would cost $416.5 million to get started, and generate 177,200 annual riders by 2040.[10]

In December 2023, the Federal Railroad Administration accepted an application by VDRPT to enter the Commonwealth Corridor route into its Corridor Identification and Development Program. The program grants $500,000 toward service planning and prioritizes the route for future federal funding.[11]

External links

Notes and References

  1. Web site: National Train Timetables . 34 . July 29, 1979 . Museum of Railway Timetables . National Railroad Passenger Corporation.
  2. Hilltopper Begins Service . Amtrak . Amtrak News . 4 . 11 . June 15, 1977.
  3. Hilltopper Begins Service . Amtrak . Amtrak News . 4 . 10 . June 1, 1977.
  4. Book: Dilger, Robert Jay . American Transportation Policy . 2003 . 91 . 9780275978532 . Praeger.
  5. Book: Amtrak National Train Timetables . January 8, 1978 . Amtrak . 9, 34.
  6. News: Amtrak Hilltopper Given Last 'All Aboard!' . New York Times . October 1, 1979 . July 15, 2016 . Ben A. . Franklin.
  7. News: Building of Roanoke's Amtrak platform expected to start this fall, state says . Roanoke Times . May 23, 2016 . Jeff . Sturgeon . July 15, 2016.
  8. Wyatt Gordon, 'Greater Greater Washington,' "Virginia is planning an east-west rail route connecting the Blue Ridge Mountains to the beach," October 16, 2019, https://ggwash.org/view/74274/commonwealth-corridor-rail-route-may-run-from-the-blue-ridge-mountains-to-beach
  9. Virginians for High Speed Rail, Southern Environmental Law Center, "Expanding Virginia's Passenger Rail, Connecting the Blue Ridge to the Beach with the Commonwealth Corridor" http://www.vhsr.com/sites/default/files/2019-09/VCC%20Report%20Final.pdf
  10. Virginia Department of Rail and Public Transportation, "Commonwealth Corridor Feasibility Study", January 2022, https://drpt.virginia.gov/wp-content/uploads/2023/05/2021-commonwealth-corridor-study.pdf
  11. "FY22 Corridor Identification and Development Program Selections." railroads.dot.gov. Federal Railroad Administration, December 2023, https://railroads.dot.gov/sites/fra.dot.gov/files/2023-12/FY22%20CID%20Project%20Summaries-Map-r1.pdf