Wisconsin Highway 441 Explained

State:WI
Type:WI
Route:441
Map Custom:yes
Map Notes:WIS 441 highlighted in red
Alternate Name:Tri-County Expressway
Length Mi:10.88
Length Ref:[1]
Established:1975
Direction A:South
Direction B:North
Terminus A: in Fox Crossing
Junction: in Appleton
Terminus B: in Appleton
Counties:Winnebago, Calumet, Outagamie
Previous Type:WI
Previous Route:341
Next Type:I
Next Route:535

State Trunk Highway 441, and also called the Tri-County Expressway or Highway 441 (STH-441, or WIS 441) is a state highway in the US state of Wisconsin. Together with Interstate 41/US Highway 41 (I-41/US 41), the highway forms a beltway around the greater Appleton area, and is a freeway for the entire length of its route. It connects at both ends to its parent highway, I-41/US 41. It runs east–west and north–south in east central Wisconsin from near Neenah around Appleton to near Little Chute through Winnebago, Outagamie and Calumet counties. The Roland Kampo Memorial Bridge spans Little Lake Butte des Morts near the highway's southwest terminus.

History

The Roland Kampo Memorial Bridge was the first portion of this road completed; traffic began flowing on the bridge at 11 a.m. on November 30, 1975.[1] The bridge, designated County Trunk Highway Q (CTH-Q) for its first years, extended from US 41 to CTH-P (Racine Road), approximately 1.3miles. The bridge was also the last portion of the Tri-County Expressway completed for more than a decade, with the remainder of the expressway mired in the proposal stage. The exits on the portion not concurrent with US 10 were unsigned until 2019, when they were numbered to reflect 441's mileage.

The bridge was given a state highway designation (WIS 441) in the 1980s, with signs installed circa 1986.[1] Movement to complete the full 10.88miles of freeway began in the late 1980s, and the first new stretch of freeway since 1975 was completed in November 1991, extending from CTH-P to US 10 (Oneida Street). The entire freeway length was completed in September 1993.[1]

Between 2012 and 2019, the Wisconsin Department of Transportation (WisDOT) worked to a widen WIS 441 from east of I-41 to west of Calumet Street from four to six lanes along with changes to interchanges along the section. A large part of the work was completing the road's southeast interchange with I-41 (Mike Ellis Interchange) by restoring missing ramps, adding auxiliary lanes to I-41, and widening the Kampo Memorial Bridge. Property was also acquired to allow the smoothing of two sharp curves from the Kampo Bridge to north of Midway Road.[2] [3] As part of the project, the existing interchange with Oneida Street was converted to a diverging diamond interchange, the first in northern Wisconsin.[4] [5] Another project to replace the structural approaches of 13 bridges between I-41/US 10 and South Oneida Street will be undertaken in 2025.[6]

External links

Notes and References

  1. Web site: Bessert . Chris . Highways 400 through 894 . Wisconsin Highways . March 20, 2007 .
  2. Web site: Wisconsin Department of Transportation . US 10/WIS 441 Expansion Study . March 14, 2006 . Wisconsin Department of Transportation . December 29, 2006 . https://web.archive.org/web/20061207220551/http://www.dot.wisconsin.gov/projects/d3/wis441/index.htm . December 7, 2006 . dead .
  3. Web site: WIS 441 Tri-County Project . Wisconsin Department of Transportation . Wisconsin Department of Transportation . August 15, 2017 .
  4. News: Appleton's Diverging Diamond Interchange Opening on Saturday . November 12, 2018 . . Green Bay, Wisconsin .
  5. Web site: Last Push to Educate as Appleton's 'Diverging Diamond' Nears Opening . Appleton, Wisconsin . . October 26, 2018 . October 27, 2018 .
  6. Web site: Adjacent Project: I-41 Rehabilitation (Neenah and Appleton) . Wisconsin Department of Transportation . January 29, 2024 .