High Capacity Metro Train Explained

High Capacity Metro Train
Interiorimage:Seats on High Capacity Metro Train — June 2022.jpg
Interiorcaption:Interior of HCMT in service, showing PIDs and seating
Service:2020–present
Manufacturer:Evolution Rail (Downer Rail, CRRC Changchun and Plenary Group)
Assembly:Newport Workshops
Factory:Changchun, China (bodyshells)
Replaced:Comeng (projected)
Yearconstruction:2018-2024
Numberbuilt:70
Numberservice:61
Formation:7-car sets
Tc–DMp–Mp1–DT–Mp2–DMp–Tc
Fleetnumbers:01–70[1]
Capacity:
  • 1,380 (gross train capacity)
  • 1,800 (crush)
[2]
Operator:Metro Trains Melbourne
Depots:
Lines:
Trainlength:160196frac=16NaNfrac=16
Carlength:
  • 24648frac=16NaNfrac=16 (Tc)
  • 22.18frac=16NaNfrac=16 (DMp/Mp/DT)
Width:3.04frac=16NaNfrac=16
Height:4186frac=16NaNfrac=16
Floorheight:1.17m (03.84feet)
Entrylevelorstep:Level
Doors:6 per carriage, 3 per side
Maxspeed:130km/h
Weight:316.9t
Axleload:
  • 1 sanded axle (DMp)
  • 2 sanded axles (Mp)
Traction:Times Electric IGBTVVVF[4]
Traction Motors:ABB 3-phase AC induction motor
Electricsystem: (nominal) from overhead catenary
Collectionmethod:Pantograph
Safety:Arden-Anzac only: Bombardier CITYFLO 650 CBTC[5]
Coupling:Dellner
Seating:502
Gauge: broad gauge

The High Capacity Metro Train (HCMT) is a type of electric multiple unit (EMU) train for use by Metro Trains Melbourne on the Melbourne rail network. The first train set entered service on 27 December 2020 and will become the primary rolling stock used in the Metro Tunnel when it opens in 2025.

The HCMTs carry around 1,400 passengers in seven carriages, running on Melbourne's overhead catenary system, and are currently the most advanced trains in the Metro Trains fleet. A consortium of investors and rail companies are constructing the trains in China and Australia via a contract with the Victorian Government, in addition to upgrade works necessary for the operation of the trains.

The HCMTs currently run all services on the Cranbourne and Pakenham lines, alongside two morning test services on the Sunbury line.

History

Background

The previous major procurement of rolling stock for the Melbourne rail network occurred in 2002, when franchisees M>Train and Connex ordered 62 Siemens Nexas and 58 X'Trapolis 100 trains respectively, as part of their franchise agreements to replace the older Hitachi trains.[6] [7] However, the Siemens units suffered major braking issues over the following decade, causing their repeated withdrawal from service;[8] when the State Government tendered for 18 further six-carriage trains in 2007, it restricted bids to the previous two models ordered and awarded the contract to Alstom.[9] Several further orders were placed for X'Trapolis trains over the next 10 years.

The Public Transport Development Authority (later branded as Public Transport Victoria) was created in 2011 by the newly elected state government of Premier Ted Baillieu with the intent of, among other things, running major studies into the operation of the metropolitan rail network.[10] The Network Development Plan – Metropolitan Rail (NDPMR), released publicly in early 2013 in the partial fulfillment of this objective, was designed as a series of concrete proposals for the expansion and consolidation of the rail network over the following 20 years.[11] The NDPMR's first stage, intended to be completed before 2016, acknowledged the need for an interim solution of several more X'Trapolis trains to overcome major constraints, as well as recommending the internal reconfiguration of Siemens and Comeng trains to increase capacity, but identified the provision of new rolling stock as critical to the cost-effective use of existing railway infrastructure.

Among the deficiencies of existing rolling stock noted by the NDPMR were "multi-purpose" designs intended to strike a balance between commuter rail and metro operations, and the failure of existing trains to use the entire length of metropolitan platforms. The NDPMR rejected double-decker trains on the basis that they would increase dwell time at crowded stations, and argued that 220m (720feet) trains, formed by operating the existing three car sets as nine car trains, would require extensive and prohibitively expensive infrastructure works, particularly in the City Loop. Instead, it recommended the procurement of single-level trains with a fixed number of cars, increased standing room and a length of 153m (502feet), with the capacity for expansion to upon the opening of the Metro Tunnel. The NDPMR envisaged these trains with a maximum capacity of 1,100 and 1,600 passengers respectively.

The NDPMR envisaged that these high-capacity trains would completely replace the Comeng fleet by 2032, and be used primarily on the SunshineDandenong line created by the Metro Tunnel. Furthermore, it identified the need for the new trains to include cab signalling to reduce the headway required between trains, and for the construction of new maintenance facilities at several points on the network.

Prior to the 2014 state election, then-Premier Denis Napthine promised an order of 25 of the proposed high-capacity trains if his incumbent Liberal-National Coalition state government was returned for a second term.[12] [13] This was part of an unsolicited proposal put forward to the government by train operator Metro Trains Melbourne, and the proposal would also involve the upgrade of the Pakenham and Cranbourne lines. The trains would be built by UGL Rail, who was a partial owner of Metro Trains Melbourne.

Order and design phase

The Coalition's proposal was criticised by the Labor opposition led by Daniel Andrews, labelling it a "con", and that 25 trains were "not enough to meet future passenger numbers". The Coalition subsequently lost the 2014 election and the proposal did not go ahead under the new Labor state government, who instead announced a different proposal in March 2015.[14] Labor's proposal would involve the purchase of 37 new trains via expressions of interest, and an expanded scope of the Pakenham and Cranbourne line upgrades.[15]

In June 2015, expressions of interest were requested for the 37 new trains to be delivered and maintained for the Melbourne rail network.[16] In November 2015, three consortia were shortlisted to build and maintain the 37 trains:[17]

In March 2016, the order was increased to 65.[18]

In September 2016, the contract was awarded to the Evolution Rail consortium. New depots to maintain the trains will be built in Pakenham East and Calder Park.[19] [20] By September of the following year, a full-scale mock-up of two carriages had been constructed and was presented to Minister for Public Transport Jacinta Allan.[21] The mock-up was made available to drivers, technicians, representatives of the Public Transport Users Association and passenger groups including the visually impaired and those with physical disabilities. The Evolution Rail consortium noted that this last stage in the design process marked the fulfilment of the project's first major contractual obligation.[22]

In late 2017, the Locomotive Division of the Victorian Rail Tram and Bus Union lodged proceedings in the Federal Court of Australia against Metro Trains, claiming that the consortium, government and Metro planned to introduce a lower standard of training for operators of the HCMT. It furthermore refused to support the implementation of the new rolling stock unless all electric train drivers were trained in the operation of the HCMT.[23] Among the union's objections to the project are the necessary changes in work practice and the increased automation of certain processes. This followed criticism by the Australian Workers' Union of the decision to award the contract to Evolution Rail instead of Bombardier, the latter of which had an established manufacturing operation in Dandenong. The government announced the awarding of several subcontracts for the project in December.[24]

The mockup carriages used for the consultation phase were placed on public display at Birrarung Marr from 9–17 February 2018. The display concluded during Melbourne's White Night event with a light show.[25]

By June of that year, manufacturing had commenced, with the first body shells arriving at Newport Workshops from CRRC's facility in China.[26]

On 9 May 2022 the Victorian Government announced it was procuring an additional 5 HCMT sets for use on the Melbourne Airport rail link, to bring the total order to 70.[27]

Contract and construction

The trains are being delivered as a public–private partnership (PPP) between the State of Victoria and Evolution Rail Pty Ltd, under the Partnerships Victoria agency. The initial contract specified that the consortium would be responsible for the design, construction and delivery of 65 trains, as well as the construction of a heavy maintenance facility and depot in Pakenham East, the construction of a light maintenance facility in Calder Park, and the provision of two simulators for driver training. It also stated that the consortium would be responsible for the maintenance of the HCMTs throughout their lifetime, as well as the operation and maintenance of the depots and simulators over the same time frame.

Evolution Rail is a consortium composed of CRRC Changchun Railway Vehicles, Downer Rail and Plenary Group.[28]

CRRC Changchun is leading the development and design for the HCMTs, and is manufacturing the train bodies as a joint venture with Downer Rail. At least 60% of construction is "local content" from the Victorian manufacturing supply chain. Downer leads the delivery and maintenance of the sets, as well as the construction of the new rail yard facilities.[29] Frames for bogies will be manufactured by Hoffman Engineering in Bendigo.[30] The Australian arm of Times Electric is manufacturing the traction motors and other electrical systems in Morwell, and SIGMA Air Conditioning is building the heating and cooling systems in Derrimut. Assembly of wheel sets and bogies is being performed by Downer at Newport Workshops. Plenary Group is responsible for the financial management of the project, and the debt is financed by a group of investment banks led by Westpac.

The contract did not prescribe specific design elements of the HCMTs, but required that the design fulfil a number of objectives, centred on the provision of a "safe and comfortable journey for passengers".

The total value of the PPP was around $2.3 billion.[31]

Service

The first revenue service for the HCMT was the 8:31am service from Pakenham on the Pakenham line on 27 December 2020. This was an extra service and regular timetabled services didn't commence until 31 January 2021, when the new PTV timetable was introduced.[32] In 2021, high-capacity signalling began being installed on the Cranbourne, Pakenham and Sunbury lines for use by the HCMTs, and the trains began operating revenue services under the new communications-based moving block system in October 2023.[33] [34] HCMTs were progressively rolled out from 2020 until by 2023 they were operating all suburban revenue services on the Cranbourne and Pakenham lines.[35]

Two HCMTs entered the Metro Tunnel in 2023 to begin testing for the opening of service through the tunnel, running at the top tunnel speed of 80 km/h by August 2023.[36]

On the 30 October 2023, HCMTs were introduced into revenue service on the Sunbury Line, with two services running in the morning peak from Sunbury to Flinders Street station, then continuing on to the Pakenham line.[37] This followed power upgrades, new signalling and platform extensions as part of the Sunbury Line Upgrade to allow for the trains.[38] A further 34 trains will complete the Sunbury line fleet when the Metro Tunnel opens in 2025.

Design

The HCMT are based on the Type A design used by CRRC Changchun. The train is sometimes known by its model number designated by CRRC Changchun, CCD5006, which belongs to its CCD series rapid transit trains. The trains have seven carriages, with a total passenger capacity of 1,380, with the ability to add three more carriages for a capacity of more than 1,970.[39] An aerodynamic nose cone and retractable cover for the couplers at each end of the trains were included to reduce the incidence of train surfing when the HCMTs are in operation.[40] They are designed for easy conversion to dual voltage operation at either or by the installation of an electrical cabinet containing IGBT-based DC-to-DC converter, line reactors and line filters, without needing to modify the traction inverters or traction motors.[41]

Approximately 30–40% of passengers are seated when the train is at full capacity. The standing areas of the train offer multiple types of straps and handles for the safety of standing passengers, and wide doors for rapid ingress and egress from these areas. In addition to seventy passenger information displays (PIDs) in each train, Wi-Fi connections are available throughout the passenger areas.[42] The PIDs show the next station, current time, and the train's location on an adapted rail map. Displays on the front and sides of the train indicate its destination.[43] Twenty-eight wheelchair spaces and wide aisles between seats enable easy access for passengers with disabilities.

A number of semi-automated features are included in the HCMT design, including the capacity for low-speed shunting by remote control and for trains to be started without the presence of a driver. The trains also automatically estimates the passenger load, and the reading can be accessed remotely. Furthermore, the HCMTs include "stopping aids" to maximise accuracy of the position of train's arrival at platforms. Drivers will also have the capacity to open individual doors on the trains.

Car position1234567
Pantograph<<>>
Car type90xx
(Tc)
91xx
(DMp)
92xx
(Mp1)
93xx
(DT)
97xx
(Mp2)
98xx
(DMp)
99xx
(Tc)
Main featuresControl cabInter-car doorInter-car doorInter-car doorControl cab
Sanded axles0 1 2 0 2 1 0
Numbers9001
:
9070
9101
:
9170
9201
:
9270
9301
:
9370
9701
:
9770
9801
:
9870
9901
:
9970

Bibliography

Notes and References

  1. https://vicsig.net/suburban/train/HCMT High Capacity Metro Trains
  2. Web site: WTT Network Configuration: Metro Rolling Stock. Metro Trains Document Portal. PDF. 10 February 2019. 21 September 2022. https://web.archive.org/web/20220921224902/https://cmsportal.metrotrains.com.au/docnum.aspx?id=A8520. live.
  3. News: Melbourne Airport Rail Link construction to start 2022, trains to run to CBD every 10 minutes. ABC News. 21 November 2020. 23 December 2020. en. 23 December 2020. https://web.archive.org/web/20201223032223/https://www.abc.net.au/news/2020-11-21/melbourne-airport-rail-link-trains-to-run-into-cbd-every-10-min/12907286. live.
  4. Web site: Suppliers on the High Capacity Metro Trains Project. Department of Transport (Victoria). 10 April 2022. 27 November 2022. https://web.archive.org/web/20221127013535/https://transport.vic.gov.au/-/media/tfv-documents/high-capacity-metro-trains/hcmt-project-suppliers-map-with-list.pdf. live.
  5. News: Barrow. Keith. Bombardier to maintain Melbourne Metro Tunnel signalling. 19 November 2021. International Railway Journal. 19 April 2018. 19 November 2021. https://web.archive.org/web/20211119064403/https://www.railjournal.com/regions/australia-nz/bombardier-to-maintain-melbourne-metro-tunnel-signalling/. live.
  6. Web site: Siemens Transportation Systems wins major contract in Australia. Siemens Transportation Systems. Siemens AG. https://web.archive.org/web/20051122043434/http://www.siemens.com/page/1,3771,226112-1-18_0_0-0,00.html. 22 November 2005. Munich. 1 April 2000.
  7. Web site: X'Trapolis Welcomed To Melbourne's Railways. Media Release from the Minister for Public Transport. Department of Premier and Cabinet. https://web.archive.org/web/20050717164206/http://www.dpc.vic.gov.au/domino/Web_Notes/newmedia.nsf/798c8b072d117a01ca256c8c0019bb01/11f92c2160b6c533ca256c93007bbcaf?OpenDocument. 17 July 2005. 18 December 2002.
  8. News: Sexton. Reid. Siemens trains the biggest cause of rail delays. 30 November 2017. The Age. 31 January 2010. 27 February 2021. https://web.archive.org/web/20210227051651/http://www.theage.com.au/national/siemens-trains-the-biggest-cause-of-rail-delays-20100130-n5jo.html. live.
  9. Web site: 18 More Trains Ordered For Metropolitan Rail System. Media Release from the Minister for Public Transport. Department of Premier and Cabinet. https://web.archive.org/web/20091019174552/http://www.legislation.vic.gov.au/domino/Web_Notes/newmedia.nsf/bc348d5912436a9cca256cfc0082d800/7180e6f43c8354ecca2573ba0080658e!OpenDocument. 19 October 2009. 21 December 2007.
  10. News: Lucas. Clay. Comeback for Kennett-era transport chief. 29 November 2017. The Age. 24 August 2011. 16 August 2017. https://web.archive.org/web/20170816112523/http://www.theage.com.au/victoria/comeback-for-kennettera-transport-chief-20110823-1j8hu.html. live.
  11. News: Gough. Deborah. Major rail projects expected in 20 years. 29 November 2017. The Age. 27 March 2013. 2 December 2017. https://web.archive.org/web/20171202182442/http://www.theage.com.au/victoria/major-rail-projects-expected-in-20-years-20130326-2gt8r.html. live.
  12. News: Dowling. Jason. Transport boost with 25 new trains for Cranbourne, Pakenham lines. 7 December 2017. The Age. 6 March 2014. 7 December 2017. https://web.archive.org/web/20171207141540/http://www.theage.com.au/victoria/transport-boost-with-25-new-trains-for-cranbourne-pakenham-lines-20140306-3492j.html. live.
  13. Web site: Napthine Government pledges 25 new trains and removal of four dangerous level crossings. Herald Sun. 6 March 2014. 18 March 2024.
  14. Web site: Liberals' Cranbourne-Pakenham Con Revealed. Premier of Victoria. 31 March 2015. 18 March 2024.
  15. Web site: Nine Level Crossing Removals And 37 New Trains To Transform Melbourne's Busiest Line. Premier of Victoria. 31 March 2015. 18 March 2024.
  16. News: Preiss. Benjamin. Andrews government to spend $1.3b on high-capacity trains. 7 December 2017. The Age. 29 June 2015. 7 December 2017. https://web.archive.org/web/20171207135923/http://www.theage.com.au/victoria/andrews-government-to-spend-13b-on-highcapacity-trains-20150629-gi0ek0.html. live.
  17. News: Three shortlisted for Melbourne's High Capacity Metro Trains contract. 29 November 2017. Railway Gazette International. 13 November 2015. en. 1 December 2017. https://web.archive.org/web/20171201063719/http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/three-shortlisted-for-melbournes-high-metro-capacity-trains-contract.html. live.
  18. News: Melbourne high capacity train order increased. 29 November 2017. Railway Gazette International. 15 March 2016. en. 1 December 2017. https://web.archive.org/web/20171201053703/http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/melbourne-high-capacity-train-order-increased.html. dead.
  19. Web site: 1,100 Jobs With 65 New Trains Built In Victoria, For Victoria. Premier of Victoria. 29 November 2017. https://web.archive.org/web/20171129115013/https://www.premier.vic.gov.au/1100-jobs-with-65-new-trains-built-in-victoria-for-victoria/. 29 November 2017. 12 September 2016.
  20. News: Evolution Rail to supply Melbourne high capacity EMUs. 29 November 2017. Railway Gazette International. 12 September 2016. en. 20 July 2018. https://web.archive.org/web/20180720141225/http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/evolution-rail-to-supply-melbourne-high-capacity-emus.html. dead.
  21. News: CRRC presents Melbourne EMU mock-up. 29 November 2017. Railway Gazette International. 7 September 2017. en. 7 September 2017. https://web.archive.org/web/20170907144139/http://www.railwaygazette.com/news/single-view/view/crrc-presents-melbourne-emu-mock-up-1.html. live.
  22. News: High Capacity Metro Train mock-up supports design process. 30 November 2017. Railway Gazette International. 25 November 2017. en. 7 May 2018. https://web.archive.org/web/20180507065158/http://www.railwaygazette.com/news/single-view/view/high-capacity-metro-train-mock-up-supports-design-process.html. live.
  23. News: Marotta. Marc. Secretary's Report. 30 November 2017. LocoLines. 69. RTBU Victorian Locomotive Division. September 2017. 3–7. 1 December 2017. https://web.archive.org/web/20171201042616/http://www.rtbuvicloco.com.au/wp-content/uploads/2017/10/LocoLines-Edition-69-SEP-2017.pdf. live.
  24. Web site: Melbourne's Bigger Trains Creating Jobs Boom. Premier of Victoria. 13 December 2017. https://web.archive.org/web/20171213083407/https://www.premier.vic.gov.au/melbournes-bigger-trains-creating-jobs-boom/. 13 December 2017. 5 December 2017.
  25. Web site: Melbourne, Meet Your New Train. Premier of Victoria. 11 March 2018. 7 February 2018. 13 March 2018. https://web.archive.org/web/20180313031319/https://www.premier.vic.gov.au/melbourne-meet-your-new-train/. live.
  26. News: Loneragan . David . New high capacity trains being assembled in Melbourne – Rail Express . 16 June 2018 . Rail Express . 14 June 2018 . en-AU . 12 November 2020 . https://web.archive.org/web/20201112013546/https://www.railexpress.com.au/new-high-capacity-trains-being-assembled-in-melbourne/ . live .
  27. News: Train order reveals Airport Rail Link on track. Herald Sun. (subscription required)
  28. News: Galloway. Anthony. Problems with trains of Chinese company bidding for Victorian contract. 7 December 2017. Herald Sun. 24 August 2016. en.
  29. Web site: High Capacity Metro Trains. Plenary Group. 7 December 2017. en. 21 December 2022. https://web.archive.org/web/20221221223035/https://plenary.com/anz/project/high-capacity-metro-trains. live.
  30. News: Holmes. Adam. Hofmann Engineering sheds 15 staff in Bendigo. 20 November 2017. Bendigo Advertiser. 17 November 2017. en. 28 April 2019. https://web.archive.org/web/20190428205940/https://www.bendigoadvertiser.com.au/story/5064181/hofmann-engineering-sheds-15-staff-in-bendigo/. live.
  31. News: Carey. Adam. Union signals rough ride for rollout of government's high-capacity trains. 30 November 2017. The Age. 12 June 2017. 1 December 2017. https://web.archive.org/web/20171201160150/http://www.theage.com.au/victoria/union-signals-rough-ride-for-rollout-of-governments-highcapacity-trains-20170609-gwo9jm.html. live.
  32. https://www.ptv.vic.gov.au/more/the-new-timetable-for-victorias-train-network/ New services and new timetables
  33. Web site: Build . Victoria’s Big . 2021-11-12 . High-tech signalling for the Cranbourne and Pakenham Lines . 2023-11-04 . Victoria’s Big Build . en.
  34. Web site: Build . Victoria’s Big . 2023-10-02 . High Capacity Signalling arrives in Melbourne . 2023-11-04 . Victoria’s Big Build . en.
  35. Web site: Planning . Department of Transport and . Bigger trains for a better Melbourne . 2023-11-04 . dtp.vic.gov.au . en-au.
  36. Web site: Build . Victoria’s Big . 2023-08-16 . Test trains ramp up in the Metro Tunnel . 2023-11-04 . Victoria’s Big Build . en.
  37. Web site: Build . Victoria’s Big . 2023-10-31 . Bigger, better trains on the Sunbury Line . 2023-11-04 . Victoria’s Big Build . en.
  38. Web site: Build . Victoria’s Big . 2022-02-28 . Powering bigger Sunbury Line trains . 2023-11-04 . Victoria’s Big Build . en.
  39. News: Carey. Adam. 2000 people per train: Metro's standing room-only future revealed. 30 November 2017. The Age. 29 May 2017. 7 February 2018. https://web.archive.org/web/20180207151338/http://www.theage.com.au/victoria/2000-people-per-train-metros-standing-roomonly-future-revealed-20170528-gwettp.html. live.
  40. News: Lund. Andrew. New high-capacity trains to curb dangerous train surfing in Melbourne. 7 December 2017. 9 News. 28 August 2017. 7 December 2017. https://web.archive.org/web/20171207140525/https://www.9news.com.au/national/2017/08/28/20/53/victoria-introduces-new-metro-trains. live.
  41. 高 . 正梁 . 徐 . 习文 . 闫 . 光临 . 2017-07-10 . 墨尔本 HCMT 地铁 LC 参数设计与仿真分析 . The LC Parameters Design and Simulation Analysis of Melbourne HCMT Subway . 机车电传动 (Electric Drive for Locomotives) . CRRC Zhuzhou Locomotive Research and Development . 2017 . 4 . 73-76 . 10.13890/j.issn.1000-128x.2017.04.019.
  42. News: Tan. Steffanie. 65 New High-Capacity Trains Will be Added to the Melbourne Network. 19 April 2018. Broadsheet. 29 May 2017. en. 19 April 2018. https://web.archive.org/web/20180419183121/https://www.broadsheet.com.au/melbourne/city-file/standing-only-future-metro-trains. live.
  43. Web site: Inside Melbourne's new trains. 6 October 2017 . Public Transport Users Association. 30 November 2017. en-AU. 24 March 2021. https://web.archive.org/web/20210324195518/https://www.ptua.org.au/2017/10/06/inside-melb-new-trains/. live.