Harunasan Ropeway Explained

Harunasan Ropeway
System:Gondola lift
Status:Operational
Location:Mount Haruna in Haruna, Gunma, Japan
No Stations:2
No Cables:1
Open:1929
Operator:Tanigawadake Ropeway Company
Character:Aerial tramway
Line Length:527m (1,729feet)
Speed:4.0 m/s
Vertical:2690NaN0
Trip Duration:3 min
Carrier Cap:15 Passengers per cabin, 2 cabins

The is Japanese aerial lift line in Haruna, Gunma, operated by Tanigawadake Ropeway Company. The Tōbu Group company also operates another aerial lift line, Tanigawadake Ropeway. The line climbs to the summit of Mount Haruna. The line opened in 1929, and refurbished in 1996 to the current system, which two smaller cabins are attached.

Basic data

See also

External links