Harduaganj Thermal Power Station Explained

Harduaganj
Thermal Power Station
Coordinates:28.0175°N 78.13°W
Country:India
Location:Harduaganj, Aligarh district, Uttar Pradesh
Commissioned:1942
Owner:Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited
Th Fuel Primary:Coal
Ps Units Operational:1×660 MW
1x110 MW
2X250 MW
Ps Electrical Capacity:1270 MW

Harduaganj Thermal Power Station is located at Qasimpur Power House Colony which is 1 km distance from Harduaganj railway station at Harduaganj in Aligarh district in the Indian state of Uttar Pradesh, about 18 km from Aligarh and 105 km from Agra. It is the new electric power station established in Aligarh district; the old one is Sumera Hydroelectric Power Plant located in Jawan Sikandarpur of Aligarh district.

The coal for this power plant is sourced from coal mines owned by BCCL and ECL and are transported to the power plant through rail line. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam.

Operations

The plant has three stages, first two stages having 7 units capacity ranging between 30 MW to 55 MW were over three decade old and all are closed now. The machinery of currently functioning units are from Bharat Heavy Electricals Limited. The coal for all these units is fed from the coal mines of Bharat Coking Coal Limited and Eastern Coalfields Limited by means of the railways. This place is also known as Qasimpur Power House. It has two colonies for the employee resident, old colony and new colony and a main market known as dus dukan.

In 2008, Unit-5 of 60MW capacity, lying defunct since 1999, and renovated at a cost of 33 crore started generating power once again.[1] The same unit was closed and the capacity was deleted from UPRVUNL generation capacity in July 2017.

Capacity

Harduaganj Thermal Power Station has an installed capacity of 1270 MW.[2]

In July 2014 state government decided to add another unit of 660 MW to the power plant.[3] July 2015: The 660 MW unit has been constructed by Toshiba .[4] Thus it has achieved the capacity of 1270 MW

Stage Installed Capacity (MW) Date of Commissioning Status
CTPS 60 1977 May Deleted [5]
CTPS 110 1978 August Renovated and Running [6]
HTPS Extn.250 2012 February Running
HTPS Extn. 250 2013 October Running
HTPS Extn. 660 2022 January Running [7]

See also

Notes and References

  1. http://www.expressindia.com/latest-news/9-yrs-after-it-was-shut-down-Harduaganj-unit-generates-power-again/315500/ 9 yrs after it was shut down, Harduaganj unit generates power again
  2. Web site: Harduganj Thermal Power Station . UP Rajya Vidyut Utpadan Nigam Limited . 2011-09-01 . https://web.archive.org/web/20141018155040/http://www.uprvunl.org/location_har.htm . 18 October 2014 . dead .
  3. http://www.steelguru.com/indian_news/UP_govt_decided_to_install_4_power_plants_in_the_state/343464.html
  4. Web site: Harduaganj power plant to get unit of 660 MW | Lucknow News - Times of India. The Times of India.
  5. Web site: Info. uprvunl.org.
  6. Web site: BHEL renovates 110 MW unit at Harduaganj Thermal Power Station in UP. NetIndian. News Network. NetIndian.
  7. Web site: Power supply in UP to get 660 MW boost | Lucknow News - Times of India. The Times of India.