Hanjialing–Yuanping railway explained

Hanjialing–Yuanping railway
Other Name:Hanyuan railway
Type:Class I railway
System:China Railway
Status:In operation
Locale:Shanxi
Start:Hanjialing
End:Yuanping
Open:25 February 2014
Operator:China Railway Taiyuan Group
Character:Passenger and freight
Linelength:153km (95miles)
Minradius:, in difficult areas
Maxincline:0.6%
Speed:160km/h with capacity to increase to 200km/h
Map State:collapsed

The Hanjialing–Yuanping railway, also known as the Hanyuan Railway, also known as the North Tongpu four-track railway, is a north–south railway located in Shanxi Province. It is the northern part of the Datong–Puzhou railway (Tongpu railway) running from in the south to the Datong–Qinhuangdao railway at Hanjialing. The line is a national class I double-track, electrified railway with a total length of 153 kilometres and a design speed of 160 kilometres per hour, built entirely with heavy-duty track. The whole line opened for freight traffic on 25 February 2014[1] and passenger services commenced on March 29 of the same year.[2] Construction of two extra tracks was completed on 1 May 2019.[3]

In February 2016, Shanxi Province decided to build the Datong–Yuanping HSR. On June 15, the "Environmental Impact Report on the New Daton–Yuanping Railway Passenger Dedicated Line" was published in its entirety.[4] In July, the Shanxi Provincial Development and Reform Commission approved the "Feasibility Study Report on the New Datong–Yuanping Railway Passenger Dedicated Line". On 9 July, the Environmental Protection Department of Shanxi Province approved the "Environmental Impact Report of the New Datong–Yuanping Railway Passenger Dedicated Line". On 12 August, the construction of third and fourth tracks for passenger traffic from Datong to Yuanping commenced next to the North Tongpu Railway, then under construction. However, only about 2.2 kilometres of the subgrade and culvert construction at Shuozhou East railway station was completed, and then construction was suspended.[5]

Subsequently, a new route extending from Ulanqab railway station (in Jining) to Datong and Yuanping was studied. The announcement of the approval of the construction of the new Jining–Datong–Yuanping HSR was made on 18 May 2020.[6] [7] On 30 June, the groundbreaking ceremony for the Jining–Datong–Yuanping HSR was held in Shuozhou City.[8]

Notes and References

  1. Web site: 韩原线通车,大秦续写传奇. China Railway. Hanyuan Line opened to traffic, Daqin continued to write legends. 1 March 2014. 18 June 2020. zh. 24 February 2021. https://web.archive.org/web/20210224174314/https://www.chnrailway.com/html/20140301/352261.shtml. dead.
  2. News: 韩原铁路客运线开通 太原到大同缩短至3个多小时. Hanyuan Railway Passenger Line opened from Taiyuan to Datong shortened to more than 3 hours. . https://web.archive.org/web/20170326004141/http://news.163.com/14/0330/07/9OINTHQ700014JB6.html. 26 March 2017. dead. 30 March 2014. 18 June 2020. zh.
  3. Web site: 韩原线要开动车了!开启逛吃模式. Hanwon Line is about to drive! Open shopping mode . 18 June 2020. zh. 1 May 2019 . China Railway.
  4. Web site: 新建大同至原平铁路客运专线变更环境影响评价信息公告. Announcement on Environmental Impact Assessment Information for the Change of the New Datong–Yuanping Railway Passenger Dedicated Line . 网易 . 20 April 2018 . 17 November 2021. zh . 17 November 2021 . https://web.archive.org/web/20211117125016/https://www.163.com/dy/article/DFSBTLNA0521O6TP.html . live.
  5. Web site: 集大原高速铁路开工建设 . The construction of Jidayuan high-speed railway started. 朔州新闻网 . 1 July 2020 . 1 January 2023. zh . 5 July 2020 . https://web.archive.org/web/20200705050533/http://www.sxsznews.com/html/62/content-443363.shtml . dead.
  6. Web site: 新建铁路集宁经大同至原平铁路环境影响评价第二次信息公告 . The second information announcement on the environmental impact assessment of the new railway Jining via Datong to Yuanping Railway. 大同市人民政府 . 18 May 2020. 2 January 2023. zh . 17 November 2021 . https://web.archive.org/web/20211117124951/http://www.dt.gov.cn/dtzww/gsgg/202005/bd763843cc3d4e8a8bf7a2354aba4bb8.shtml . live .
  7. Web site: 新建铁路集宁经大同至原平铁路环境影响报告书 . Environmental Impact Report of the New Railway Jining via Datong to Yuanping Railway. 大同市人民政府 . 18 May 2020. 2 January 2023. zh . 17 November 2021 . https://web.archive.org/web/20211117124950/http://www.dt.gov.cn/dtzww/gsgg/202005/bd763843cc3d4e8a8bf7a2354aba4bb8/files/bfc7c9ec26fa49b8a1f6a4c780cc79ea.pdf . live .
  8. Web site: 集宁经大同至原平高速铁路开工建设 . Construction of the Jining-Yuanping high-speed railway started via Datong. 山西省政府网 . 30 June 2020 . 2 January 2023. zh.