Hajipur–Muzaffarpur–Samastipur–Barauni section explained

Box Width:28em
Hajipur–Muzaffarpur–Samastipur–Barauni section
Type:Passenger and freight train line
Status:Operational
Stations:27
Routes:
Open:1886
Linelength:157.370NaN0
Tracklength:304 km
Tracks:1 (electrified Hajipur–Muzaffarpur)2 (electrified Muzaffarpur–Barauni)
Electrification:25 kV 50 Hz AC OHLE (between 2011- December 2014)
  • (started from 24 December 2014)[1]
Speed:up to 100 km/ h
Elevation:57 metres

The Hajipur–Muzaffarpur–Samastipur–Barauni section is a railway line connecting to via Muzaffarpur, Samastipur the Indian state of Bihar. The 157.370NaN0 line passes through the plains of North Bihar and the Gangetic Plain in Bihar.

Notes and References

  1. Web site: सपना साकार, अब फर्राटे भरेगी विद्युत ट्रेन. hi. Jagran.com. 22 December 2014. Realizing the dream, now the electric train will fill.