Hòa Bình Dam Explained

Hòa Bình Dam
Name Official:Thuỷ điện Hoà Bình
Coordinates:20.8083°N 105.3239°W
Country:Vietnam
Location:Hòa Bình
Status:Operational
Construction Began:November 1979
Opening:1994
Cost:1.5 billion (1996)
Owner:Vietnam Electricity
Dam Type:E
Dam Length:9700NaN0
Dam Height:1280NaN0
Dam Crosses:Black River
Res Name:Sông Đà Reservoir
Res Capacity Total:1600000000m2
Res Surface:2080NaN0
Plant Type:C
Plant Turbines:8 × 240 MW
Plant Capacity:1,920 MW
Plant Annual Gen:8,160 GWh
Operator:Hoa Binh Hydro Power Company

The Hòa Bình Dam on the Black River is the largest hydroelectric dam in Vietnam from 1994 to 2012 (this record was broken by Sơn La Dam), and one of the largest in Southeast Asia, with a generating capacity of .[1] [2] The Sông Đà Reservoir, with a capacity of 9 billion m3 was formed as the river was dammed.[3]

The dam is located in Hòa Bình City of the Hòa Bình Province in the north of Vietnam. It measures 1280NaN0 in height, and 9700NaN0 in length. It is owned by Vietnam Electricity and operated by the Hoa Binh Hydro Power Company.[4]

Construction

In 1961, the North Vietnam government established a committee on exploring hydropower sites. This was followed by construction of the Thác Bà Dam, starting in 1963. After the Vietnamese reunification, damming the Black River was explored.[5]

Financed and built with Soviet Union and Russian money and experts, construction on the rockfill dam began on November 6, 1979 and was completed in December 1994.[6] The responsible engineer on site of the project was Russian Pavel Bagachenko.[7] In 1986, the river was fully dammed.[8] The first generator unit went operational in 1988, with the final unit starting in 1994.

The Russian engineers used experience from building the Aswan Dam for the construction. The dam structure goes up to 280 m deep in the surrounding rock. 30,000 workers, 5,000 soldiers and 750 Russian engineers and 1,000 Vietnamese construction managers participated in the construction. Many of the Vietnamese volunteered to help with the construction of the dam.[9] [10] During construction there were 168 deaths, 11 Russian experts and 157 Vietnamese.[11]

The dam was built to high safety standards, due to earthquake risk in the area,[12] and the enormous impact of dam failure. 12 million people would become homeless if the dam were to fail, and parts of Hanoi could be 30 m under water.[13]

A letter from the Russian engineers to the future generation of Vietnamese people was sealed inside a concrete monument, to be opened on January 1, 2100.

Power generation

Power is generated by utilizing eight turbines with a capacity of, totaling an installed capacity of .[14]

When the dam was first completed, it fulfilled between 30% and 50% of Vietnam's electricity output. As this exceeded the demand of northern Vietnam, a 1,487 km north–south high-voltage line had to be constructed. By 2016 the dam accounted for 6% of Vietnam's total electricity output. Each year approximately 10 billion kWh of electricity is generated by the dam, providing around half of the government revenue of Hòa Bình Province. Since the dam went operational, as of 2021 it had produced a cumulative 230 billion kWh of electricity. The dam is staffed by 800 workers.

In January 2021, an expansion project commenced, adding an additional 480 MW to the generating capacity. When it is completed in 2024, the maximum electricity generation output of the dam will be 2400 MW.[15]

Impact

In addition to electricity generation, the dam helps to ensure the stability of the power grid, protects Hanoi and the Red River Delta against floods, and helps to keep the downstream river navigable. Since its completion, the dam controlled dozens of major floods.[16]

11,141 households, approximately 89,720 people, were relocated[17] with 13 thousand ha of land being submerged.

On the neighboring Tượng Hill, an 18m high, 400 ton statue of Ho Chi Minh stands looking over the dam.[18] The story goes that when Ho Chi Minh crossed the Red River here in a boat during the nation's struggle for independence against America he was so frustrated with the difficulty that he proclaimed that when North and South are reunified a dam will be built to calm the mighty river.[19]

See also

Notes and References

  1. Web site: Hydroelectric power stations in Vietnam . Industcards.com . 2010-04-04 . dead . http://arquivo.pt/wayback/20090719031413/http%3A//www.industcards.com/hydro%2Dvietnam.htm . 2009-07-19 .
  2. Web site: VnExpress. Thủy điện Hòa Bình - Công trình kỳ vĩ của thế kỷ 20. 2021-05-08. vnexpress.net. vi.
  3. Web site: Song Da Reservoir . ASEAN Regional Centre for Biodiversity Conservation . 4 April 2010 . dead . https://web.archive.org/web/20100806024115/http://www.arcbc.org.ph/wetlands/vietnam/vnm_sonda_res.htm . 6 August 2010 .
  4. Web site: ETC. Hoa Binh Hydropower Plant. 2021-05-08. ETC. en.
  5. Web site: Dấu ấn 50 năm ngành xây lắp thủy điện Việt Nam. 2021-05-08. www.quangninh.gov.vn.
  6. Web site: Mekong Utility Watch - Resettlement Performance - Hoa Binh Hydropower Project . 2006-08-22 . Probe International . 2010-04-04 . dead . https://web.archive.org/web/20100820201926/http://www.probeinternational.org/files/pdfs/muw/Hoa_Binh_Compensation.pdf . 2010-08-20 .
  7. Web site: Dấu ấn Nga trên Thủy điện Hòa Bình. 2021-05-08. www.qdnd.vn. vi-vn.
  8. Web site: Thuy-dien-Hoa-Binh-Nguon-sang-tren-song-Da. 2021-05-08. www.nldc.evn.vn. 2021-05-08. https://web.archive.org/web/20210508140313/https://www.nldc.evn.vn/newsg/6/1746/Thuy-dien-Hoa-Binh-Nguon-sang-tren-song-Da/default.aspx. dead.
  9. Web site: Hoang Viet Cuong. (2009). Hoa binh hydropower – the great work of 20th century. 06/10, 2014 . 2021-05-08 . 2022-06-08 . https://web.archive.org/web/20220608212352/http://soxaydung.hoabinh.gov.vn/ . dead .
  10. Book: Huu, Ty Pham. Dilemmas of hydropower development in Vietnam: Between dam-induced displacement and sustainable development. 2015-01-13. Eburon Uitgeverij B.V.. 978-90-5972-959-9. en.
  11. Web site: 2020-10-09. Âm vang Thủy điện Hòa Bình.
  12. Trinh. Phan. Vinh. Hoang. Huong. Nguyen. Liem. Ngo. 2013-01-01. Active fault segmentation and seismic hazard in Hoa-Binh reservoir, Vietnam. Open Geosciences. 5. 2. 223 . 10.2478/s13533-012-0128-5. 2013CEJG....5..223T . 128571028 . 2391-5447. free.
  13. Web site: News. VietNamNet. Đập Thủy điện Hòa Bình chịu được 4 quả bom nguyên tử. 2021-05-08. VietNamNet. vi.
  14. http://www.evn.com.vn/hoabinhpp/eng/Gioithieu1.htm Hoa Binh Hydro Power Plant
  15. Web site: Khởi công Nhà máy thủy điện Hòa Bình mở rộng. 2021-05-08. VOV.VN. 10 January 2021 . vi.
  16. Web site: Thủy điện Hòa Bình đóng góp quan trọng cho sự nghiệp công nghiệp hóa- hiện đại hóa đất nước.. 2021-05-08. hanoimoi.com.vn. 9 November 2018 .
  17. Web site: Dan. Phuc Tiep. 2011. Hoa Binh Hydropower: Impacts on resettled and downstream communities. Hoa Binh Union of Science and Technology Association.
  18. Web site: VnExpress. Công trình thủy điện - 'Đặc sản' du lịch của Hòa Bình. 2021-05-08. vnexpress.net. vi.
  19. Web site: TITC. Thủy điện Hòa Bình - điểm nhấn trong hành trình thăm quan hồ sông Đà. 2021-05-08. Tổng cục Du lịch Việt Nam. vi.