Gwangju Metro Line 1 Explained

Box Width:22em
Line 1
Native Name:
Il Hoseon
Type:Rapid transit
System:Gwangju Metro
Status:Operational
Start:Nokdong
End:Pyeongdong
Stations:20
Routes:1
Open:28 April 2004
Operator:Gwangju Metropolitan Rapid Transit Corporation
Linelength:20.6km (12.8miles)
Tracks:2
Electrification:1,500 V DC, 25 kV AC 60 Hz overhead line
Map State:show

Gwangju Metro Line 1 is a rapid transit line in Gwangju, South Korea, operated by the Gwangju Metropolitan Rapid Transit Corporation (GRTC, or Gwangju Metro). It connects Nokdong station in Dong-gu at its eastern terminus to Pyeongdong station in Gwangsan-gu in the west, via the central business district and Gwangju Airport. On maps, it is designated by teal (

).

The line began operations in 2004, making Gwangju the fifth South Korean city with a rapid transit system.

History

Stations

As of 2021 Line 1 consists of twenty stations. Most trains operate between Pyeongdong and Sotae, with about one service per hour continuing to Nokdong station.[1]

All stations are in Gwangju.

Station
Number
Station Name
Station Name
Station Name
TransferDistance
Total
Distance
Location
100NokdongKorean: [[:ko:녹동역 (광주)|녹동]]
101SotaeKorean: [[:ko:소태역|소태]]
102Hakdong·JeungsimsaKorean: [[:ko:학동·증심사입구역|학동·증심사입구]] ·
103NamgwangjuKorean: [[:ko:남광주역|남광주]]
104Culture ComplexKorean: [[:ko:문화전당역|문화전당]]
105Geumnamno 4(sa)-gaKorean: [[:ko:금남로4가역|금남로4가]] 4
106Geumnamno 5(o)-gaKorean: [[:ko:금남로5가역|금남로5가]] 5
107Yangdong MarketKorean: [[:ko:양동시장역|양동시장]]
108DolgogaeKorean: [[:ko:돌고개역|돌고개]] 돌고개
109NongseongKorean: [[:ko:농성역|농성]]
110HwajeongKorean: [[:ko:화정역 (광주)|화정]]
111SsangchonKorean: [[:ko:쌍촌역|쌍촌]]
112UncheonKorean: [[:ko:운천역 (광주)|운천]]
113SangmuKorean: [[:ko:상무역|상무]]
114Kim Daejung Convention CenterKorean: [[:ko:김대중컨벤션센터역|김대중컨벤션센터]] 컨벤션센터
115AirportKorean: [[:ko:공항역 (광주)|공항]]
116Songjeong ParkKorean: [[:ko:송정공원역|송정공원]]
117Gwangju Songjeong StationKorean: [[:ko:광주송정역 (도시철도)|광주송정역]]
118DosanKorean: [[:ko:도산역|도산]]
119PyeongdongKorean: [[:ko:평동역|평동]]

Plan to extend Line 1

The Gwangju City Government has a plan to extend the current Line 1 southward to Hwasun and northward to Naju. Recently, the Presidential Committee on Balanced National Development promised to include the Line 1 extension in its '5+2 extensive economic zone' project.[2]

See also

Notes and References

  1. Web site: 광주도시철도공사 모바일.
  2. Web site: Seoul Newspaper:Presidential Committee on Balanced National Development accepted Gwangju's new proposal of 5+2 project. 2009-02-11.