Gulu–Nimule Road Explained

Country:UGA
Gulu–Nimule Road
Marker Image:none
Length Mi:65
History:Designated in 2012
Completion in 2015
Direction A:South
Terminus A:Gulu
Junction:Pabbo
Atiak
Bibia
Direction B:North
Terminus B:Nimule

Gulu–Nimule Road is a road in the Northern Region of Uganda, connecting the city of Gulu in Gulu District and the town of Nimule in Eastern Equatoria State in South Sudan, just north of the international border between the two countries. The road, known as Highway A104 in Uganda, continues into South Sudan as Highway A43.

Location

The Gulu–Nimule Road starts at Gulu and continues north, through Pabbo, Atiak, Bibia and Elegu, before ending in Nimule at the border between Uganda and South Sudan, a distance of approximately 106km (66miles). The coordinates of the road near Atiak in Amuru District are 3°17'02.0"N, 32°07'04.0"E (Longitude:3.283889; Latitude:32.117778).

Overview

Before 2009, the Gulu–Nimule Road was a gravel-surfaced, two-lane road. It is a major route of transportation between Uganda and South Sudan. During the rainy season, the road became impassable, as was the case in 2008 when rains closed it for a week.[1] In March 2009, the World Bank agreed to fund the engineering design of the improved road to an all-weather tarmac surface. Vice Consulting Engineers, a South African firm, was awarded the contract to design the road at a cost of US$800,000. The government of Japan, through the Japan International Cooperation Agency (JICA), and the World Bank provided the loans to fund the construction, expected to cost US$102 million.[2] [3]

Construct timeline

After several delays, the contract for the GuluAtiak section, measuring 70km (40miles), was awarded to China Henan International Corporation, a Chinese construction Group that had successfully completed civil engineering projects in various African countries, including Guinea, Liberia, Namibia, Rwanda and Tanzania. The costs for this section of the road was met by the Government of Uganda and the World Bank. Construction began in May 2012 and was expected to last two years.[4] The remaining section of the road, between Atiak and Nimule, measuring 35km (22miles), was funded by the Government of Japan. That contract was awarded to China Railway Wuju Group Corporation, a division of China Railway Engineering Corporation. Construction of that section was commissioned in August 2013.[5] Completion was expected in May 2016.[6] On 21 July 2015, Yoweri Museveni, the president of Uganda, officially commissioned the completed road.[7]

Points of interest

The following landmarks lie close or near the Gulu–Nimule Road:

(1) city of Gulu in Gulu District, the largest city in Northern Uganda, (2) the town of Pabbo, in Amuru District, approximately 39km (24miles), north of Gulu.[8] (3) the town of Atiak, in Amuru District, approximately 70km (40miles), north of Gulu.[9] (4) the town of Bibia, in Amuru District, approximately 100km (100miles), north of Gulu. (5) the town of Elegu, in Amuru District. This is the last town in Uganda, before the road reaches the International border between Uganda and South Sudan at Nimule.[10] (6) the town of Nimule, in Equatoria Province, South Sudan, approximately 104km (65miles), north of Gulu.

See also

External links

3.3°N 39°W

Notes and References

  1. Web site: 3 September 2008 . 28 August 2014 . Gulu-Juba Road Frustrates Traders . Chris . Ocowun . . Kampala . https://web.archive.org/web/20140903222107/http://www.newvision.co.ug/D/9/579/647875 . 3 September 2014 . dead .
  2. Web site: . Japan And World Bank Will Finance Upgrade of Gulu-Nimule Road . 28 March 2010 . 28 August 2014 . and Cecilia Okoth . Jeff Lule . Kampala, Uganda . https://web.archive.org/web/20140903222156/http://www.newvision.co.ug/D/8/13/714483 . 3 September 2014 . dead .
  3. Web site: Sudan Tribune . Museveni Commissions Tarmacking of Atiak-Nimule Road . 23 August 2013 . . 10 February 2018.
  4. Web site: Vision Reporter . Museveni Launches Gulu-Juba Road Works, To Cost USh89 Billion . 10 May 2012 . Kampala . 10 February 2018 . New Vision.
  5. Web site: . Museveni Commissions Atiak-Nimule Road Works . 21 August 2013 . Moses Mulondo . 28 August 2014 . Kampala, Uganda.
  6. Web site: Atiak-Nimule road near completion, says UNRA . 28 April 2016 . . Bill Oketch . 28 April 2016 . Kampala, Uganda.
  7. Web site: President commissions Gulu-Atiak-Nimule road; urges Ugandans to support UPDF with credible political leadership . Uganda State House-Presidential Press Unit (PPU) . 21 July 2015 . PPU . 13 August 2017 . Entebbe, Uganda.
  8. Web site: Map Showing Gulu And Pabbo With Distance Marker . 28 August 2014 . Globefeed.com.
  9. Web site: Distance Between Gulu And Atiak With Map . 28 August 2014 . Globefeed.com.
  10. Web site: Bagala. 22 July 2012. Daily Monitor. Elegu: A Booming Town Clamouring for Services. 13 August 2017. Andrew. Kampala. 14 August 2017. https://web.archive.org/web/20170814021831/http://www.monitor.co.ug/Magazines/Life/Elegu--A-booming-town-clamouring-for-services/-/689856/1459980/-/item/3/-/1r9wefz/-/index.html. dead.