Gulfstream G400/G500/G600 Explained

The Gulfstream G400, G500, and G600 (GVII) are twin-engine business jets designed and produced by Gulfstream Aerospace.The aircraft are designated Gulfstream GVII-G500 and GVII-G600 in their type certificate.[1]

The two larger models were unveiled on October 14, 2014 and the smaller G400 was unveiled on October 4, 2021. The G500 was first delivered on September 27, 2018, and the longer G600 was first delivered August 8, 2019.The G500 will replace the G450 while the larger G600 will succeed the G550. The smaller G400 meanwhile has not yet been certified, and is not expected to go into production until 2025.

Powered by two Pratt & Whitney Canada PW800 turbofans, the MTOW G500 has a range of 5300nmi while the G600 can cover at a speed of Mach 0.85.

Development

Both aircraft were unveiled by Gulfstream Aerospace on October 14, 2014[2] During the second quarter of 2017, 80% of Gulfstream orders were for the G500/G600.[3]

G500

The G500 was taxiing under its own power at its unveiling on October 14, 2014,[2] and it first flew on May 18, 2015.[4] The model was initially planned to be certified in 2017.[5] [6] In May 2017, the test fleet of four G500 prototypes and the first production aircraft, made over 745 flights in two years for 2,900 flight hours, on track for the certification by the end of the year.[7]

In August 2017, the FAA issued the G500 a type inspection authorization to allow in flight evaluation. The five G500 test aircraft have logged more than 3,100 hours over 820 sorties and completed cabin systems, brakes, lighting, fly-over noise and fuel systems tests. The fifth G500, with a complete interior, will be the first to enter service, as a demonstrator, before customer deliveries in early 2018.[3] Through August 20, the G500s had flown 3,460 h over 905 flights, reaching Mach 0.995 and FL530.

For the October 2017 NBAA show, the five G500s were completing their campaign with 995 flights and 3,690 h - 10 h 19 min for the longest - the first delivery schedule was maintained as certification was pushed until early 2018.Mach 0.85 range for the G500 was extended by 200 nmi to 5,200 nmi/9,630 km and by 600 nmi/1,111 km to 4,400 nmi/8,149 km at Mach 0.90.

The 300 flights hours of function and reliability testing required for FAA type certification was to be completed in summer 2018 after 240 were done at the end of May 2018 covering 100,300 nmi in 69 flights, along known icing flight and high-elevation certification tests: the five flight-test G500s made 1,355 flights in 4,955 hours.

On July 20, 2018, Gulfstream announced it received both its type certification and production certificate from the FAA, before first delivery in the fourth quarter.[8] As nacelle supplier Nordam filed for bankruptcy on 23 July, initial deliveries will be slowed.[9] Certification allowed the EFVS to provide the only visual cues for landing down to runway visual range, to touchdown and rollout, after 50 test approaches, and testing to lower visibilities could allow dropping the limit.[10]

The first G500 was delivered on September 27, 2018.[11] On October 1, Gulfstream announced the acquisition of the nacelle manufacturing line from Nordam.[12]

In 2022, its equipped price was $49.5M.[13]

G600

The longer G600 had its first flight at Savannah/Hilton Head International Airport on December 17, 2016.[14] [15] Four flight-test aircraft and a production G600 will be used for the test program for a scheduled 2018 introduction:[16]

In August 2017, the fifth was being outfitted for its third quarter first flight.[3] Through August 20, the four G600s have logged 780 h in 175 flights, the longest lasting 13 h 5 min, it completed testing for initial flight envelope expansion and flying qualities, flutter, brakes, low speed or stall, loads calibration, parameter identification and climb performance, the fifth test aircraft will fly later in the quarter.[17]

For the October 2017 NBAA show, five G600s were flying as it was to be introduced in early 2019.[18] Range for the G600 was extended by 300 nmi/556 km for both Mach 0.85 to 6,500 nmi/12,038 km and Mach 0.90 to 5,100 nmi/9,445 km.[19] In October 2018, Mach 0.9 range was increased again to .[20]

Certification and introduction for the G600 was to happen in 2018 like for the G500.[21] The five flight-test G600s accumulated 1,950 hours in 510 flights, were completing mechanical systems certification testing in May 2018 before airfield-performance testing in summer.[22] By August, 600 flights over 2,290 hours were completed after trials for ice shapes and stall speed testing and before field-performance testing, towards U.S. approval by year-end and deliveries in 2019.[23] By October, the test aircraft had accumulated 685 flights in over 2,600 hours.[24] The FAA's rigorous review delayed the certification as the test programme had logged more than 3,150h over 840 flights by the end of April 2019, and approval was targeted before the end of June for a second half of 2019 service entry.[25]

On June 28, 2019, Gulfstream announced the G600 type and production certificates from the FAA.[26] The first G600 was delivered on August 8, 2019.[27] The first EASA-certified G600 was delivered in December 2020 to an Austrian operator.[28]

In 2022, its equipped price was $59.5M.[29]

G400

On October 4, 2021, Gulfstream introduced the 4,200 nmi (7,780 km) range G400, powered by Pratt & Whitney PW812GA engines with deliveries planned to start in 2025.[30] Priced at $34.5 million,[31] the G400 has a shortened G500 fuselage,[32] with 2.5 zones and 10 windows, instead of 3 zones and 14 windows. By March 2022, as the prototype was not yet rolled out, Gulfstream was anticipating a more extensive flight-test and certification campaign for the five test aircraft, as the G400 is powered by a different PW800 variant and the US government strengthened some certification requirements after the Boeing 737 Max groundings, but the 2025 first delivery goal remained.[33]

Design

The G500 will replace the G450, flying nearly 30kn faster and 18% farther with the same fuel burn. The larger G600 will succeed the G550.

Airframe

Both models have a four circular arcs cross-section fuselage, similar to the Gulfstream G650, with a 7inches reduction in width and height. Similar in dimension to the Dassault Falcon, the G500/600 have 2inches more headroom, 7inches more cabin width and 8inches more floor width than Gulfstream's G450 and G550. The fuselage has an external height of 8feet, and width of 8feet. The production G500 will have 14 windows, two more than the prototype models.[6] The G600 cabin is longer than the G500, allowing up to four passenger zones or three long zones, a longer galley and a forward crew rest.[34]

The wing is a supercritical design with a 0.87 to 0.88 drag divergence Mach number depending upon lift coefficient. It is based on the G650's wing design with the same 36° sweep. The G600's wingspan will be 8feet wider than the G500, allowing for 11250lb of additional fuel. Both models have a new tail design based on the aerodynamic shape and systems of the G650's tail.[35]

The airframe is primarily composed of high strength aluminum alloys with limited use of steel and titanium alloys. The horizontal stabilizer, fairings, main landing gear doors, rudder and elevators, radome, rear pressure bulkhead and winglets are composite materials. The semi-monocoque fuselage structure is made of stressed skin, frame and longeron.

Engines

The G500/G600 is powered by the Pratt & Whitney Canada PW800 series turbofan engines (PW814GA for G500 and PW815GA for G600) which was originally conceived for the Cessna Citation Columbus program. The PW800 is based on the Pratt & Whitney Geared Turbofan core without the gear reduction. The departure from Rolls-Royce Aero Engines is rare for Gulfstream.[36] For the G500 in cruise, at FL400, ISA -5°C, total fuel flow is /h at M0.90/ TAS, /h at M0.85/ TAS.[37] At FL450, Mach 0.90/ TAS and ISA -8°C, it burns /h.[38]

At Mach 0.90, TAS, the G600 burns per h at FL430, ISA-3°C and a weight of, compared to a per h book value. At Mach 0.85 TAS, the same G600 burns per h at FL470, ISA-10°C and a weight of, below the prediction.[34]

Systems

Electric and hydraulic systems are from the G650, as well as the digital air data computers, secondary power distribution with electronics, cabin acoustical treatment, primary avionics, satcom, and improved cabin management system. The digital fly-by-wire system is similar except for new active control sidesticks and dual channel remote electronic units which replace single channel units from G650. The oxygen, cabin pressurization, landing gear control, aircraft health and trend monitoring systems are adapted from the G650.[39] The auxiliary power unit is a Honeywell HTG400G.[40] The cabin pressurization reaches .[34]

It is equipped with BAE Systems active sidesticks, appearing to be mechanically linked by being electrically back-driven, the first civil aircraft to be so.[40] The Honeywell Symmetry Flight Deck features four portrait main displays, three touchscreens on the overhead panel instead of stand-alone switches ; there are four force-touchscreens in the glareshield and left and right touch standby displays at each seat. The enhanced flight vision system is displayed through 42×30° field-of-view head-up display.[41]

Specifications

External links

Notes and References

  1. Web site: Type Certificate Date Sheet No. T00021AT, Revision 7 . August 9, 2021 . 2022-12-17 . .
  2. Gulfstream Introduces New Aircraft Family . Gulfstream . October 14, 2014 . May 25, 2016 . dead . https://web.archive.org/web/20181209212545/http://www.gulfstream.com/gulfstreamnow/article/gn-introducing-the-gulfstream-g500-and-g600 . December 9, 2018.
  3. News: G500 edges closer to certification milestone . 16 Aug 2017 . Kate Sarsfield . Flightglobal.
  4. Gulfstream G500 Completes First Flight . Gulfstream . May 18, 2015 .
  5. Gulfstream G500 and G600 programs on track . Gulfstream . May 25, 2016 . September 30, 2016 . https://web.archive.org/web/20170718175425/http://www.gulfstream.com/gulfstreamnow/article/gn-gulfstream-g500-and-g600-programs-on-track . July 18, 2017 . dead .
  6. Web site: Gulfstream G500 Advances, On Track for 2017 Approval . September 29, 2016 . Aviation International News.
  7. News: Gulfstream stays on track with G500 flight test . 22 May 2017 . Stephen Trimble . Flightglobal.
  8. Gulfstream G500 Earns Both Type And Production Certificates From U.S. Federal Aviation Administration . July 20, 2018 . Gulfstream . July 20, 2018 . July 20, 2018 . https://web.archive.org/web/20180720225655/https://www.gulfstreamnews.com/news/gulfstream-g500-earns-both-type-and-production-certificates-from-u-s-federal-aviation-administration . dead .
  9. News: Supplier dispute will slow Gulfstream G500 deliveries . 25 July 2018 . Stephen Trimble . Flightglobal.
  10. News: Gulfstream First to Certify EFVS Landing System . Matt Thurber . November 13, 2018 . AIN online .
  11. Gulfstream Delivers First New-generation G500 On Time . September 27, 2018 . Gulfstream . September 29, 2018 . March 28, 2019 . https://web.archive.org/web/20190328005427/https://www.gulfstreamnews.com/news/releases-20180927 . dead .
  12. News: Gulfstream acquires G500 and G600 nacelle line from Nordam . 2 October 2018 . Kate Sarsfield . Flightglobal.
  13. News: Purchase planning handbook - Jets table . Second Quarter 2022 . Business & Commercial Aircraft.
  14. Gulfstream G600 takes flight ahead of schedule . Gulfstream . December 17, 2016 . December 23, 2016 . September 28, 2018 . https://web.archive.org/web/20180928200959/https://www.gulfstreamnews.com/news/gulfstream-g600-takes-flight-ahead-of-schedule . dead .
  15. Web site: G600 First Flight. 19 December 2016. Niles. Russ. AVweb. 17 December 2016.
  16. News: Gulfstream Flies Third G600, On Track for 2018 EIS . Chad Trautvetter . May 9, 2017 . Aviation International News.
  17. News: Gulfstream Continues To Make Progress on G500, G600 . Mark Huber . August 24, 2017 . AIN.
  18. News: Gulfstream announces range extensions for G500 and G600 . 10 October 2017 . Murdo Morrison . Flight International.
  19. News: Gulfstream: G500/600 Performance Exceeds Original Specs . J.E. Burnside . October 9, 2017 . AIN.
  20. News: NBAA: Gulfstream unveils G600 range increase . 15 October 2018 . Flightglobal .
  21. News: Gulfstream Delivers More Range Than First Promised . Mar 29, 2018 . William Garvey . Aviation Week & Space Technology.
  22. News: Gulfstream's G500 Closes in on Type Certification . Samantha Cartaino . May 28, 2018 . AIN online.
  23. News: Nearing FAA Nod, G600 Starts Field-performance Tests . Chad Trautvetter . August 21, 2018 . AIN online.
  24. News: Gulfstream Announces Range Increase For G600 . October 15, 2018 . Molly McMillin . Aviation Week Network.
  25. News: Business aircraft in the works . 20 May 2019 . Kate Sarsfield . Flightglobal.
  26. Gulfstream G600 Receives Type Certificate From Federal Aviation Administration . June 28, 2019 . Gulfstream . June 29, 2019 . June 29, 2019 . https://web.archive.org/web/20190629154728/https://www.gulfstreamnews.com/news/gulfstream-g600-receives-type-certificate-from-federal-aviation-administration . dead .
  27. Gulfstream delivers first G600 . August 8, 2019 . Gulfstream . August 9, 2019 . August 9, 2019 . https://web.archive.org/web/20190809133506/https://www.gulfstreamnews.com/news/gulfstream-delivers-first-g600 . dead .
  28. Web site: Gulfstream delivers first EASA-certified G600 . RAJA . PARVEEN . December 17, 2020 . evaint.com . December 17, 2020.
  29. News: Purchase planning handbook - Ultra long-range jets table . Second Quarter 2022 . Business & Commercial Aircraft.
  30. Gulfstream Introduces Two All-New Business Jets . October 4, 2021 . Gulfstream Aerospace Corp..
  31. News: Gulfstream Unveils New-Generation G400, G800 Jets . Bill Carey . October 5, 2021 . Aviation Week.
  32. News: Gulfstream loads G800 and G400 into its product pipeline . September 30, 2021 . Jon Ostrower . The air current.
  33. News: Gulfstream prepared for tougher G400 flight-test and certification programme . Jon Hemmerdinger . 18 March 2022 . FlightGlobal.
  34. News: Pilot Report: Gulfstream G600 Is A Worthy Successor To The G550 . October 23, 2019 . Fred George . Business & Commercial Aviation.
  35. News: Alcock, Charles . New Gulfstreams Deliver More Range and Cabin Comfort . Aviation International News . 14 October 2014.
  36. News: Analysis: Gulfstream G600 technical description . Flight Global . October 24, 2016.
  37. News: Analysis: Gulfstream raises super-large bar with G500 . 22 May 2018 . Mike Gerzanics . Flightglobal.
  38. News: Pilot Report: Gulfstream G500 . Matt Thurber . August 24, 2018 . AIN online.
  39. News: Gulfstream Unveils G500 and G600 . Aviation Week . November 1, 2014.
  40. News: Pilot Report: Gulstream G500 . October 21, 2016 . Business & Commercial Aviation . Aviation Week.
  41. News: Symmetry Flight Deck Powered By Honeywell . October 19, 2016 . Fred George . Business & Commercial Aviation . Aviation Week.
  42. Web site: G400 . gulfstream.com . 2022-06-16.
  43. Web site: G500 . gulfstream.com . 2022-06-16.
  44. Web site: G600 . gulfstream.com . 2022-06-16.
  45. Web site: Gulfstream Aerospace - Aircraft . gulfstream.com . 10 August 2019.
  46. Web site: Aircraft . gulfstream.com . 2022-06-16.