Guangzhou–Zhuhai intercity railway explained

Guangzhou–Zhuhai intercity railway should not be confused with Guangzhou–Zhuhai Railway.

Box Width:300px
Other Name:Guangzhu intercity railway
Native Name:Chinese: 广珠城际铁路
Native Name Lang:zh-hans
Type:Higher-speed rail
Inter-city rail
System:
Status:Operational
Locale:Guangdong province
End: /
Stations:22
Routes:2
Daily Ridership:342,000
Owner:Guangzhou–Zhuhai intercity railway Co. Ltd.
Operator: CR Guangzhou
Character:Elevated
Linelength: (Main line)
(Branch line)
Tracks:Double-track
Electrification: (Overhead line)
Speed: (Design)
(Maximum)
(- Zhuhai Airport)
Map State:collapsed
Embedded:
Child:yes
Order:st
S:广珠城际铁路
T:廣珠城際鐵路
P:guǎngzhū chéngjì tiělù
J:gwong2 zyu1 sing4 zai3 tit3 lou6
Y:gwóng jyū sìhng jai tit louh

Guangzhou–Zhuhai intercity railway or Guangzhu intercity railway is a dedicated, grade-separated regional railway linking Guangzhou South railway station in Panyu, Guangzhou, Jiangmen railway station in Xinhui, Jiangmen, and Zhuhai Jinwan Airport in Zhuhai, via Shunde, Zhongshan and Jiangmen, in Guangdong province.[1] It is the first line completed in the Pearl River Delta Metropolitan Region intercity railway network. It is operated by China Railway Guangzhou Group.

Overview

The railway began partial operation in January 2011. It will be divided into three parts with a total of 27 stations. Its main line between Guangzhou and Zhuhai City, via Shunde and Zhongshan, is 117km (73miles) long, with 17 stations and a maximum speed of 200km/h. The planned extension from Zhuhai City to Zhuhai Airport is 35.3km (21.9miles) long, with 7 stations and a maximum speed of 160km/h. Its spur line between Zhongshan and Jiangmen is 26km (16miles) long, with 6 stations and a maximum speed of 200km/h.[2] [3]

When fully completed, passengers traveling on the main line between Zhuhai and Guangzhou South will have a choice between a 46-minute non-stop and a 76-minute, 140 km/h all-stop service. The non-stop service is offered between Zhuhai and Guangzhou South only, and travel between Zhuhai (Gongbei) and Zhuhai Airport will be cut down to 25 minutes.[4] It currently takes 50 minutes to travel by auto from Gongbei, Zhuhai to Zhuhai Airport, and 1 hour 30 minutes from Gongbei, Zhuhai to Panyu, Guangzhou.

The construction of the railway began in 2005[5] and it was to be completed by 2010 to cope with the opening of the Guangzhou Asian Games, but missed this deadline.[6]

After the opening of the Guangzhu Line, Zhongshan will open nine new bus lines to support operations, according to Zhongshan Public Transportation Corporation. By the end of 2010, more than 100 shuttle buses will be put into operation.[7] Initially with trains operating about every 30 minutes,[8] services have gradually been increased to cope with rising passenger numbers. Do to high demand for local stopping services, the amount of express services between Jiangmen and Zhuhai to Guangzhou is limited. To remedy this, a parallel regional railway, the Guangfojiangzhu ICR, running between Zhuhai Jinwan Airport and Guangzhou via Jiangmen and Foshan's Nanhai District is proposed to be constructed.[9] [10]

Name confusion

Due to the confusing usage of the Chinese term "Qinggui" (轻轨), the name could refer to a Light Rail line or an elevated Mass Rapid Transit line in the original name of this railway, this line was firstly conceived as a Mass Rapid Transit line. As later pointed out by the local media Nanfang Daily,[11] however, this is a mainline Chinese railway, run by the national Chinese Ministry of Railway (instead of a local agency or authority), using mainline rolling stock CRH1, and with respective identifier for each train, that is very unlikely to be a Mass Rapid Transit line. The old term "Guangzhu Qinggui" (广珠轻轨, Guangzhu Mass Rapid Transit) was discarded in favor of "Guangzhu Chengji Tielu" (广珠城际铁路, Guangzhu intercity railway) in news media.

History

In April 2004, the ongoing Guangzhou–Zhuhai intercity railway traffic's preliminary feasibility study was finished, resulting in a proposed railway alignments, technical standards, and project design details.[12] Soon afterwards, the railway project was included on the list of major projects for 2005 in Zhuhai.[12] At the first Pearl River Dela Regional Economic and Trade Cooperation Fair on July 14, 2004, the Ministry of Railways and Guangdong's provincial government signed an agreement, forming the Guangdong Pearl River Delta Intercity Rail Company and giving each party a 50 percent share in the joint venture. Thus, the Guangzhou–Zhuhai intercity railway was born, incorporating officially on July 29.

On March 16, 2005, China's State Council considered the adoption of the "Bohai Sea, Yangtze River Delta, and Pearl River Delta Intercity Railway Network Plan"[13] during the May 2005 Guangzhou–Zhuhai intercity railway preliminary design review. The design of the Guangzhou-Zhuhai project was adjusted, and a single alignment was preliminarily determined. Substantial adjustments were made to the alignment south of Jiangmen, resulting in the current "Nanlang Alignment". The "Nanlang Alignment" runs from Cuiheng Village in Zhongshan to Zhuhai along the east side of Yangangwan Avenue, through the Fenghuangshan Tunnel, along Mingzhu Road, Gangchang Road, and Changsheng Road before reaching Zhuhai's Xiangzhou District.[14]

On December 18, 2005, construction on the Guangzhou–Zhuhai intercity railway commenced.[15] Construction of elevated lines in the form of aerial structures accounts for approximately 92.25% of the alignment, allowing for minimal changes in slope and grade that provides for a smooth train ride throughout the system.[16]

On March 25, 2008, the preliminary feasibility study for the Zhuhai (Gongbei)—Zhuhai Airport extension line was released. The 35.3 kilometer westward extension from the original terminus at Zhuhai Station passes over several waterways on its way to Sanzao and Zhuhai Airport, including the Qianshan, Maliuzhou, Modaomen and Niwanmen waterways. Six additional stations will be built, including Wanzai, Xiawan, Lianhua, Hengqin, Sanzao, and Zhuhai Airport. A possible seventh station, Hezhou South Station, will be built in the future depending on the realization of local development. Hengqin Station and Sanzao Station are separated by 15.7 kilometers, of which includes 6.97 kilometers passing over Jinhai bridge, the greatest distance between two stations along this line.[17] In addition, provisions for a future connection to the Macau Light Transit System will be made near Hengqin, possibly in the form of an underwater spur line linking to Macau Light Rapid Transit's Cotai line.[18] Construction, which was scheduled to be completed in 2011, will effectively link cities in the Pearl River Delta with Macau by rail.[17] [19] [18]

The railway line began operations between Guangzhou South and Zhuhai North (formerly named Jintang) Stations on January 7, 2011, while the extension of the line to Gongbei via the Fenghuang Shan Tunnel was postponed. Fares between Guangzhou and Zhuhai North are 44 RMB 1st class; 36 RMB economy class and 22 RMB for students. The journey time is 39 minutes. Express buses are available to link Zhuhai North Station with Xiangzhou and Gongbei, while regular buses 3A & 65 serve local residents.

In November 2012, testing started on the last section of the railway, from Zhuhai North to Zhuhai Gongbei;[20] it was expected to be opened for service on 1 January 2013.[21]

The airport extension

See main article: Zhuhai–Zhuhai Airport intercity railway. It was reported in November 2012 that the construction work on the line's extension from downtown Zhuhai to Zhuhai Jinwan Airport, via Hengqing Island, would start by the end of 2012. The extension is now known as the Zhuhai–Zhuhai Airport intercity railway. The phase 1 of the extension, from to started operation on 18 August 2020.[22] At the Hengqin Railway Station, a connection is planned to the proposed Hengqin Extension Line of Macau Light Rail Transit.[20] The phase 2 opened on 3 February 2024.

Stations

RouteStation
Station NameChineseDistance
PRDIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
IZQ0.000.00Panyu, Guangzhou
|| align="center" ||BLQ15.055.05Shunde, Foshan
IBQ5.1310.18
ORQ4.8515.03
OJQ7.5422.57
RUQ9.4231.99
NOQ4.2736.26Zhongshan
EAQ8.5344.79
||align="center"||DRQ16.7151.50
||ZGQ| | | 12.15| 63.65|||-|align="center"|●|align="center"|||ZSQ| | | 5.92| 69.57|||-|align="center"|●|align="center"||NNQ13.0382.60
||IHQ| | | 5.26| 87.86|||-|align="center"|●|align="center"||ZIQ4.2892.14Xiangzhou, Zhuhai
||PDQ| | | 4.25| 96.39|||-|align="center"|●|align="center"||MFQ11.85108.24
||QXQ| | | 4.05| 112.29|||-|align="center"|●|align="center"||ZHQ3.81116.10
GNQ8.76124.86Zhongshan
JNQ4.68129.54JianghaiJiangmen
JWQ6.71136.25
UEQ3.20139.45
EFQ3.58143.03Xinhui
JOQ

External links

Notes and References

  1. http://www.investzhuhai.gov.cn/News/200810139552781.asp Intercity Railway in progress
  2. Web site: PRD Planned Rail Network – West Bank . 2009-04-05 . https://web.archive.org/web/20110717125546/http://www.hkip.org.hk/SymposiumRegionalPlanning_GPRD/Theme3/Albert%20yuen.pdf . 2011-07-17 . dead .
  3. http://www.investzhuhai.gov.cn/china/2008101983556356.asp Guangzhou-Zhuhai Railway Extension Proposal: from Gongbei to Zhuhai Airport
  4. http://big5.heshan.gov.cn:82/gate/big5/gulao.heshan.gov.cn/html/2005/05/20050521221024-1.htm 廣珠城際軌道交通工程設計方案初定, 力爭七月正式動工
  5. http://www.zhuhai.gov.cn/english/Citynews/200805/t20080504_44322.htm Guangzhou-Zhuhai RMT
  6. http://www.knightfrank.com.cn/industrial/gz/Lynns.pdf Lynns Industrial Park, Jiangmen
  7. Web site: Life of Guangzhou, Guangzhou–Zhuhai Intercity Railway: On Track, almost Home . 2012-03-11 . 2012-04-19 . https://web.archive.org/web/20120419094047/http://www.lifeofguangzhou.com/node_981/node_989/node_997/node_1007/2010/12/09/129188211682978.shtml . dead .
  8. http://news.southcn.com/g/2011-01/10/content_19145276.htm 广珠城际铁路列车时刻表和试行运价出台
  9. Web site: 关于政协江门市第十三届委员会第四次会议2020052建议答复的函_公告公示_江门市发展和改革局. 2020-08-17. www.jiangmen.gov.cn.
  10. Web site: 广佛江珠城际轻轨将启动 与广佛环线实现换乘. 2020-08-17. www.sohu.com. en.
  11. http://news.sgxw.cn/2011/0105/46450.html 广珠城际铁路 不是"轻轨"
  12. http://big5.cri.cn/gate/big5/gb1.cri.cn/3821/2005/02/25/1245@460989.htm 廣珠城際鐵路走向及技術標準初步確定 4年後通車
  13. http://www.gzuda.gov.cn/news/view.asp?id=XW200503180947403940&fdID=CL200304290920487800&tbColor=DBE2FF&trColor=C7CFF3 国务院通过珠三角城际轨道网规划
  14. http://big5.cri.cn/gate/big5/gb1.cri.cn/3821/2005/02/25/1245@460989.htm 廣珠城際軌道珠海段預計於今年上半年開工建設
  15. http://www.fstv.com.cn/Article/fs/200512/25911.shtml 广珠城际轨道动工 顺德到珠海仅需40分钟
  16. https://web.archive.org/web/20121104150226/http://news.xinhuanet.com/politics/2005-12/22/content_3953828.htm 乘坐广珠城际轨道将与城市公交一样便捷
  17. http://news.wenweipo.com/2008/03/26/IN0803260077.htm 廣珠城際軌道將延伸至珠海機場
  18. http://www.cns.hk:89/hb/news/2008/12-05/1474889.shtml 粵澳聯席會議達共識 廣珠城際軌道擬連澳門輕軌
  19. http://www.guangzhou.gov.cn/node_392/node_393/node_400/node_730/2008-03/1206585706244955.shtml 广珠轻轨拟延伸至珠海机场
  20. Web site: http://news.huochepiao.com/2012-11/201211218210211.htm . zh:京广高铁拟12月下旬开通届时广州直达北京最快约8小时, 二等座票价估计近千元 . 信息时报 . 2012-11-21 . 2012-11-22 . https://web.archive.org/web/20140106151840/http://news.huochepiao.com/2012-11/201211218210211.htm . 2014-01-06 . dead .
  21. News: Guangzhou-Zhuhai railway to open on New Year's Day. 28 December 2012. Macau Daily Times.
  22. Web site: 粤港澳大湾区又有新线开通!珠机城际铁路开始售票. 羊城晚报. 2020-08-17.