Guangzhou–Shenzhen–Hong Kong Express Rail Link Explained

Box Width:300px
Guangshengang XRL
Native Name:Chinese: 广深港高铁
Chinese: 廣深港高鐵
Color2:AC2E44
Type:High-speed rail line
System: China Railway High-speed
Status:Operational
Locale:South China
Stations:7
Routes:
Close: (Hong Kong section due to COVID-19)
Reopen: (Hong Kong section)
Owner:
Operator:
Character:
  • Underground (Shenzhen North ↔ West Kowloon)
  • Elevated (Guangzhou South ↔ Shenzhen North)
Tracks:Double-track
Electrification: (Overhead line)
Speed:
Signalling:CTCS Level 3 CBTC[2]
Minradius: (Guangzhou South - Shenzhen North)
(Shenzhen North - Hong Kong West Kowloon)
Maxincline:1.2% (Normal)
2.0% (Difficult terrain)
Map:

Route of Guangzhou–Shenzhen–Hong Kong XRL
(Guangshen section in and
Hong Kong section in)
Map State:collapsed
Embedded:
Child:yes
T:廣深港高速鐵路
S:广深港高速铁路
Order:st
J:Gwong2 Sam1 Gong2 Gou1 Cuk1 Tit3 Lou6
Y:gwóng sām góng gōu chūk tit louh
P:Guǎng–Shēn–Gǎng Gāosù Tiělù
T2:廣深港客運專線
S2:广深港客运专线
J2:Gwong2–Sam1–Gong2 Haak3wan6 Zyun1 Sin3
P2:Guǎng–Shēn–Gǎng Kèyùn Zhuān Xiàn

The Guangzhou–Shenzhen–Hong Kong Express Rail Link (XRL), also known as the Guangshengang XRL, is a high-speed railway line that connects Guangzhou and Hong Kong (Kowloon) via Shenzhen. Officially, the line is the Guangzhou–Shenzhen–Hong Kong section of the Beijing–Guangzhou–Shenzhen–Hong Kong high-speed railway.

Three types of rolling stock that operate along the XRL: Hexie (Harmony) and Fuxing (Rejuvenation) operated by China Railway, and Vibrant Express by MTR Corporation.

The first phase, Shenzhen NorthGuangzhou South, commenced revenue operation in December 2011. Services were extended to the city centre of Shenzhen at Futian in December 2015. The final phase, which connects Shenzhen-Futian to Hong Kong (West Kowloon) was inaugurated on 22 September 2018.[3] [4] It opened for public on Sunday 23 September 2018.[5]

Journey times

History

Background

The railway connecting the mainland China has been important for Hong Kong since the 20th century. After the establishment of the People's Republic of China, three railway lines from the mainland, also known as “santang kuaiche” (three cargo express trains), were arranged to transport fresh food every day to maintain the daily needs of the Hong Kong people.[6] A high-speed railway connecting Guangzhou, Shenzhen and Hong Kong, railway was brought up in the late 1990s by the Government of Hong Kong. This Regional Express Railway (RER) proposal was developed in the 1994 “Railway Development Study” (RDS); it foresaw a continual growth of Hong Kong's population over the next two decades and strong demand for cross-border passenger traffic. The Hong Kong (SAR) Government commissioned a second Railway Development Study in March 1998.[7] The Study went further on the British proposal of connecting Hong Kong and China from Kowloon. The RER could be further extended to Hong Kong Island. At the same time, the report recommended that Hung Hom station should continue to play a central role in Hong Kong's mass transit. Since the typical timeframe for rail projects, from conception to completion phase, would take eight or nine years, the Railway Development Study recommended that the Hong Kong (SAR) Government should commence as soon as possible, so that the new express railway could be constructed in time to meet capacity demands.

Maglev proposal

In September 1999, the then mayor of Guangzhou, Lin Shusen, announced his “Suigang maglev rail project” at the "Fortune Global Forum" in Shanghai. Lin was already working with then-Chief Executive of Hong Kong, Tung Chee-hwa, on the development of Hong Kong Disneyland. Lin proposed that a maglev railway between Guangzhou and Hong Kong would benefit visitor numbers. The cost of construction was to be borne in equal proportion by governments of both cities.[8]

Railway Development Strategy 2000

The Hong Kong government, based on the results of the Second Railway Development Study by the Department of Transportation, issued a new plan, “Railway Development Strategy 2000 – new railway strategy”. On 16 May's Legislative Council meeting, the Legco Panel on Transport Railway Development Strategy tabled the strategy for use by the Hong Kong (SAR) Government. The Executive Council (upper house) recommended that, under the Chief Executive's advice, Hong Kong should adopt the "Railway Development Strategy 2000" until a further review in 2016.

Regional Express Railway

“Railway Development Strategy 2000” recommended new six new rail corridors, through the New Territories, connecting the East Rail or the West Rail line to the border, operating between Hung Hom and the border in an express manner similar to Hong Kong Airport's Airport Express line. " The decision to build a “Regional Express”, depended on the Lok Ma Chau Spur provided additional transport capacity which would soon be saturated. According to the 1998 price estimates, construction of the RER needed a budget of about HK$130 to 170 billion.[9] It was intended that this railway would be operated by the Kowloon-Canton Railway Corporation or the Mass Transit Railway Corporation, depending on the location of the downtown terminal.

At that time about the “Regional Express” concept, was not a high-speed rail, but only a commuter line connecting the city and the border with “rapid rail” services, in addition to the idea of a small number of intermediate stations being set up alongside the route, but also allowing for Hong Kong and China Intercity trains to run, reducing the load on the existing East Rail line. At that time the initial alignment program has two starting points located around Hung Hom station. The first one was the Eastern scheme, a new line following the East Rail line of pink Lingnan station, connecting to Lo Wu station or a new rail crossings in the east of Luohu. However, this proposal needed to co-operation with the mainland. The second program for a new line from the West Rail line at Kam Sheung Road station, northwards to Lo Wu or Lok Ma Chau station.

Since 2001, the Hong Kong government began working on the “Regional Express” with mainland China, and discussing the feasibility of cooperation on “Suigang maglev rail project”. In 2001, the Hong Kong DoT, with the Shenzhen Municipal Government and Chinese railway authorities to explore the use of “RER” and maglev technology, project feasibility and actively using magnetic levitation technology to build a line from Hong Kong to Canton/Guangzhou.[10] The study pointed out that the use of a maglev train would reduce the Hong Kong to Shenzhen running time of 40 minutes to 15 minutes.[11] September 2001, when he was the Hong Kong SAR Chief Secretary Donald Tsang, visited Canton/Guangzhou, where he met with the Governor of Guangdong Province, Lu Ruihua, acting mayor of Guangzhou, Lin Shusen and Shenzhen Mayor Yu Youjun for talks about the “Regional Express line concept”.[12] Tung attended the Shanghai APEC Summit in October 2001, formally proposing the construction of a maglev railway between Canton/Guangzhou and Hong Kong Express Line plans to the State Planning Commission. The Mayor of Shenzhen Yu Youjun said at a news conference at the APEC Senior Officials' Meeting, Shenzhen and Hong Kong is planning to build maglev railway and to continue to discuss the issue.[13] But also at this time, the Guangzhou-Shenzhen Railway Co. also made a Guangzhou–Kowloon Through Train speed plan.

Switch to high-speed rail

By the end of January 2002, the concept of “Regional Express” gained further development. Tsang in Beijing to attend the “Mainland and Hong Kong SAR major infrastructure coordination meeting”, and with the State Development Planning Commission and the relevant ministry officials, the talks were initially on Regional Express railway line connecting Guangzhou, Shenzhen and Hong Kong, focussing on the design and coordination of consensus between the parties. The central government officially approved research and co-ordination by the Ministry of Railways,[14] [15] and officially named this railway the "Guangzhou–Shenzhen–Hong Kong Express Rail Link". With a formal agreement with the Hong Kong SAR Government, decided by the Ministry of Railways, led the establishment of an expert group to study the construction of the Regional Express high-speed rail line.[16]

In February 2002, in the framework of “collaborative meetings” by the Hong Kong SAR Government Environment, Transport and Works Bureau and the Ministry of Railways, the Guangzhou–Shenzhen–Hong Kong Express Rail Link Planning Group was established, which meant the “Railway Development Strategy 2000” planned “Regional Express” was set aside for the “Guangzhou–Shenzhen–Hong Kong Express Rail Link - Hong Kong section”. The planning Group conducted preliminary studies on the main railway necessity, function, alignment, location transit, rail technology and economic benefits.[17]

The first phase of the study topics included the functional and strategic importance of the Guangzhou–Shenzhen–Hong Kong Express Rail Link project, the relevant regional passenger transport demand analysis and forecasting, as well as railway lines and public transit locations.[18] The first phase of the study completed in September 2002[19] and reported on the September 20th 2002 at the Second “Mainland and Hong Kong's major infrastructure cooperation held meeting”. At the meeting, the high-speed rail planning team reported the first phase of on the planning for the GZ-SZ-HK XRL. Including the necessities of GZ-SZ-HK XRL construction, function and regional transportation needs, forecasting and route traffic in order to determine the strategic value of the railway.[20] Experts in Hong Kong and mainland China reached a consensus after comparing different alignments, shortlisting two options, “Guangzhou East – Dongguan – Lin Tong – Hong Kong” and “Panyu – Nansha – Shekou – Hong Kong”. A planning goal was to reduce Guangzhou to Hong Kong travel time from 100 minutes to less than 60 minutes. In addition, effective integration with the national high-speed rail network and the connections with the planned Pearl River Delta intercity rapid rail transit network.

The second phase of the study, included rail alignments, station locations and the Hong Kong section of the Guangzhou–Shenzhen line connections, the main technical standards, passenger flow forecasting, financial benefits. During the study, in response to the latest developments of both the overall urban planning and transportation network planning, the Ministries of Railways, Environment, Transport and Works respectively needed to consider some new ideas and make adjustments for the Hong Kong section of GZ–SZ–HK XRL project. In mainland China, the Ministry of Railways had to consider the feasibility of the PRD Intercity Rapid Rail network together with the Guangzhou–Shenzhen section of GZ–SZ–HK XRL. In Hong Kong, the government began to consider the use of the proposed North West Rail Link, Northern Link and the feasibility GZ–SZ–HK XRL Hong Kong section. Kowloon-Canton Railway Corporation and the Hong Kong Mass Transit Railway Corporation produced a consolidated joint report submitted to the Government, it was a preliminary assessment of their ideas, but also required further studies by the Environment, Transport and Works Bureau & KCRC of the Northern Link.

In the first and second phases of the study, the planning team had to investigate and compare the traditional wheel-rail and maglev technologies. Operating and maintenance costs were greater with maglev than with wheel-rail technology, The construction period of the project was expected to be longer for maglev than the wheel-rail technology solutions. Maglev was not conducive to the existing rail network and compatibility. Also with current high-speed railway operating speeds of up to 350km/h, the less than an hour goal was able to be achieved. Thus to reach the GZ–SZ–HK XRL's three goals, there was no need to adopt a relatively high cost and the technical difficulty of maglev technology. Thus, despite the advantages that high-speed maglev technology has, until August 2003, both sides tended to choose more mature high-speed wheel-rail plans. In other words, the "Regional Express" that was originally intended to have been conceived as a maglev train was cancelled.

In March 2003, the Guangzhou Railway Group Corporation general manager, Wú Jùnguāng, at the National People's Congress, submitted a bill that called for the construction of a Guangzhou–Shenzhen–Hong Kong Express Rail Link Passenger Line as soon as possible. The Guangzhou–Shenzhen Railway utilization has exceeded 90% and was saturated. According to the existing passenger growth rate, to 2005, the Guangzhou East to Shenzhen route would require 96-151 train pairs daily, which will greatly exceed the capacity of the line. It is difficult to meet the transportation needs of the future with the new high-speed rail showing greater potential in the pipeline.[21]

On 7 January 2004, China's State Council considered the “long-term railway network plan”, deciding to build more than 12,000 kilometers of “four vertical and four horizontal” Passenger Lines, including Hong Kong in the planning. The Guangzhou–Shenzhen section of the Guangzhou–Shenzhen–Hong Kong Express Rail Link correspondingly accelerated planning until July 2004, deciding to adopt the “Panyu – Nansha – Shekou – Hong Kong” route. The station located in Guangzhou's Panyu district would also connect with the Wuhan–Guangzhou Passenger Line.

Route

The 143km (89miles) route starts with a connection to the Wuguang High-Speed Railway at Guangzhou South railway station in Shibi, southern Guangzhou (Canton). From there it travels south to the same district before tunnelling eastwards underneath the Pearl River to Humen in Dongguan. It then moves south through three stations within Shenzhen and then across into Hong Kong where it arrives at West Kowloon Terminus in Kowloon.This project has been divided into two sections, the Guangshen section with six stations, and the Hong Kong section, with one station.

Mainland Section

Guangzhou–Shenzhen–Hong Kong Express Rail Link section of the Guangzhou–Shenzhen starts at Guangzhou South railway station and ends at Shenzhen Futian station, it is 116km (72miles) line length,[22] with a design speed of 350km/h. From there it travels south to Qingsheng before tunnelling eastwards underneath the Pearl River to Humen in Dongguan. It then moves south to Guangmingcheng, Shenzhen North and Futian(u/c) in Shenzhen.[23] [24] [25] [26]

Originally the station in Humen was to be named Dongguan but this was changed to Humen to avoid confusion with an existing Dongguan railway station on the Guangzhou–Shenzhen Railway in the town of Changping.

Hong Kong Section

See main article: Hong Kong Express Rail Link. The Hong Kong section is in total 26km (16miles) of dedicated underground track, emergency rescue sidings and the stabling sidings in Shek Kong, ventilation facilities at Mai Po, Ngau Tam Mei and Pat Heung, along with an emergency access point at Tai Kong Po and eventually terminating at Hong Kong West Kowloon station.

The Regional Express Line originally envisaged in the Railway Development Strategy 2000 proposed by the Hong Kong Special Administrative Region Government (HKSAR Government), has now become the Hong Kong section of the Guangzhou–Shenzhen–Hong Kong Express Rail Link (XRL). In April 2008, the HKSAR Government asked the MTR Corporation to carry out further planning and design of the Express Rail Link. Subsequently, the HKSAR Government gazetted the Scheme for the Express Rail Link under the Railways Ordinance to collect public views.

In early 2009, the government of Hong Kong signed a memorandum of understanding with the Chinese Ministry of Railways that would permit the construction of the Shenzhen–Hong Kong section of the railway.[27]

On 20 October 2009, the Chief Executive in Council authorised the scheme and the Amendments of the Scheme of the Express Rail Link. On 16 January 2010, the Finance Committee of the Legislative Council approved the funding application for the construction of the Express Rail Link. The construction commenced in late January 2010[28] and was completed in September 2018.[29] In October 2014, an MTR report warned that the revised budget of HK$71.5 billion might be at risk.[30] This section had been expected to open in 2015, but severe storms flooded the tunnels and caused immense damage to the Tunnel Boring Machines in March 2014.[31] The railway has been expected to be completed in third quarter of 2018. According to the Rail Merger Bill, MTR Corporation will lease the rights to conduct operations on this line, until 1 December 2057.[32]

With the completion of the section, the journey time through the Rail Link have been reduced to 14 minutes between WKT and Futian stations, 23 minutes between Hong Kong and Shenzhen North and 48 minutes between Hong Kong and Guangzhou South. As of 2015, the cost of the project has risen substantially to HK$85.3 billion.[33]

Construction

Operations

At present, Guangzhou–Shenzhen–Hong Kong Express Rail operates around 104 northbound trains and 101 southbound trains a day, three pairs of separate lines on weekends, a separate peak line 20 pairs and 7 high-speed sleeper train pairs, including:

In December 2014, overnight high-speed sleeper trains were added to several long-distance destinations, such as Beijing.

Stations

Station NameYear OpenedTransferDistrictCityPictures
EnglishSimplified Chinese
(Traditional Chinese)
Chinese: 广州南
(Chinese: 廣州南)
2010PanyuGuangzhou
QingshengChinese: 庆盛
(Chinese: 慶盛)
2011Nansha
HumenChinese: 虎门
(Chinese: 虎門)
HumenDongguan
GuangmingchengChinese: 光明城
(Chinese: 光明城)
Bao'anShenzhen
Chinese: 深圳北
(Chinese: 深圳北)
Longhua
FutianChinese: 福田
(Chinese: 福田)
2015Futian
Hong Kong
West Kowloon
Chinese: 香港西九龙
(Chinese: 香港西九龍)
2018Hong Kong SAR

Trains and equipment

The following is a list of operators using the line and their respective rolling stock :

Railway GroupRolling Stock
align=center CR GuangzhouCRH3C, CRH380B, CR400AF, CR400AF-A
align=center CR ShanghaiCRH1E, CR400BF-A
align=center CR NanchangCRH380A
align=center CR WuhanCRH380AL, CRH380A
align=center CR ZhengzhouCRH380AL
align=center CR Xi'anCRH380AL, CRH380B
align=center CR BeijingCR400AF, CRH380AL, CRH2E
align=center MTRVibrant Express (MTR CRH380A)

In Hong Kong, MTR announced their intention to purchase several high-speed EMUs. The tender (contract number: 840) was for 9 trainsets, each with 8 cars and a maximum operating speed of 350 km/h. Chinese manufacturer CSR Qingdao Sifang emerged as the successful bidder, based on the CRH380A "Harmony" model. The purchase contract was signed on 16 April 2012 at the headquarters of MTR.[37] [38]

Tickets

Train fare table G numbered trains (Business seat fare / VIP Class fare / First Class fare / Second Class fare; Unit: yuan; tickets for children, disabled veterans half price tickets, student tickets share a quarter discount of the fare for a Second Class ticket.)[39]

Guangzhou South
64.5 / 44.5 / 34.5 / 24.5Qingsheng
99.5 / 59.5 / 49.5 / 34.539.5 / 24.5 / 19.5 / 14.5Humen
169.5 / 99.5 / 84.5 / 59.5104.5 / 64.5 / 54.5 / 4064.5 / 44.5 / 34.5 / 24.5Guangmingcheng
199.5 / 119.5 / 99.5 / 74.5139.5 / 84.5 / 69.5 / 49.5104.5 / 64.5 / 54.5 / 39.539.5 / 24.5 / 19.5 / 14.5Shenzhen North
215 / 130 / 108 / 82120 / 70 / 60 / 4530 / na / 24 / 1840 / 25 / 20 / 15Futian
645 / 387 / 344 / 215555 / 333 / 296 / 185533 / 320 / 285 / 178284 / 171 / 152 / 95226 / 136 / 120 / 75204 / 122 / 109 / 68West Kowloon

Accidents and incidents

See also

External links

Notes and References

  1. 广深港高速铁路深港跨境隧道之设计与施工管理. zh-Hans. 阮. 文忠. Guangzhou-Shenzhen-Hong Kong High Speed Rail Cross-border Tunnel Design and Construction Management. China Hong Kong Railway Institution. "深圳福田站至深圳河线路全长 11.4km,设计速度目标值 200km/h [...] 香港段全长约 26km,设计速度目标 200km/h. 2022-08-15.
  2. Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways. Latest update on issues relating to train of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link. Legislative Council of Hong Kong. June 2016. 2022-08-15.
  3. News: Hong Kong's first high-speed train makes maiden trip across border, as Carrie Lam says rail link will be 'bright light' on China's calling card . 22 September 2018 . SCMP.
  4. News: Hong Kong Opens High-Speed Rail Link With Mainland China, Makes Maiden Trip Across Border . 22 September 2018 . Headlines Today.
  5. News: Guangzhou-Shenzhen-Hong Kong Express Rail Link Opens To Public . 23 September 2018 . Headlines Today.
  6. Chan . Fung . 2020 . The Guangdong–Hong Kong–Macao Greater Bay Area: Enhancing collaborative governance of the CEPA implementation and regional integration . China: An International Journal . 18 . 1 . 171–191 . 10.1353/chn.2020.0011 .
  7. Web site: 立法会参考资料摘要:铁路发展策略 . 2011-03-06 . Legislative Council of Hong Kong . 2000-05-16 .
  8. Web site: 广深港高速走东站还是番禺? . 2011-03-06 . 金羊网 . 2002-09-22 . https://web.archive.org/web/20121207093950/http://www.ycwb.com/gb/content/2002-09/22/content_425236.htm . 2012-12-07 . dead .
  9. Web site: 鐵路發展策略2000 . 2011-03-06 . Transport and Housing Bureau, Government of Hong Kong . May 2000 . dead . https://web.archive.org/web/20070317051758/http://www.hyd.gov.hk/chi/public/publications/rds/doc/rds_c.pdf . 2007-03-17 .
  10. Web site: 香港研究在京港线、沪港线开通磁悬浮列车 . 2011-03-06 . 中新网 . 2001-08-16 . 2020-05-10 . https://web.archive.org/web/20200510230455/http://www.people.com.cn/GB/jinji/32/180/20010816/536844.html . dead .
  11. Web site: 磁 浮 列 車 一 小 時 內 抵 廣 州 . 2011-03-06 . Sing Tao Daily . 2001-09-29 .
  12. Web site: 新闻公报:政務司司長談話全文 . 2011-03-06 . 香港特别行政区新闻署 . 2001-09-29 .
  13. Web site: 穗深港间建磁浮列车? 铁道部称视沪样板表现 . 2011-03-06 . 东方网 . 2003-01-03 . 2020-11-03 . https://web.archive.org/web/20201103212616/http://news.eastday.com/epublish/gb/paper148/20030103/class014800003/hwz858239.htm . dead .
  14. News: 孙静惟 . 港深穗研建高速铁路 . 大公报 . 2002-01-01 .
  15. Web site: 港粵合作進入更高層次 . 2011-03-06 . 文汇报 . 2002-02-02 .
  16. Web site: 广深港间拟建区域快线 可能采用磁悬浮列车 . https://web.archive.org/web/20021218190008/http://news.xinhuanet.com/newscenter/2002-02/01/content_263244.htm . dead . December 18, 2002 . 2011-03-06 . 新华网 . 2002-02-01 .
  17. Web site: 立法会内务委员会 特别会议纪要 . 2011-03-06 . Legislative Council of Hong Kong . 2002-04-19 .
  18. Web site: 立法会十题:广深港高速铁路规划中 . 2011-03-06 . Transport and Housing Bureau, Government of Hong Kong . 2004-11-10 .
  19. Web site: 财务委员会审核二OO四至O五年度开支预算 管制人员的答覆 . 2011-03-25 . Legislative Council of Hong Kong . 2004-05-23 .
  20. Web site: 新闻公报:政务司司长促进内地与香港基建合作 . 2011-03-06 . 香港特别行政区政府新闻署 . 2002-09-20 .
  21. Web site: http://news.sina.com.cn/c/2003-08-07/1409523675s.shtml . zh:广深港高速铁路倾向于轮轨 40分钟广州到香港 . 2011-03-06 . Guangzhou Daily . 2003-08-07 .
  22. zh:地下高铁站广深港客运专线深圳福田站设计 . Yang Fanglong (杨芳龙) . 《山西建筑》 . 2010 . 9.
  23. Web site: http://www.cns.hk:89/ga/gaynd/news/2008/04-23/1228640.shtml . zh:廣深港高速鐵路正式拍板 香港到深圳只需14分鐘 . 2014-12-31 . https://web.archive.org/web/20100312012617/http://www.cns.hk:89/ga/gaynd/news/2008/04-23/1228640.shtml . 2010-03-12 . dead .
  24. Web site: http://www.lg188.com/Article/200903/20090311094939.html . zh:广深港专线光明站施工 至中心区将仅10分钟 . 2014-12-31 . https://web.archive.org/web/20100606031139/http://www.lg188.com/Article/200903/20090311094939.html . 2010-06-06 . dead .
  25. Web site: http://sz.house.sina.com.cn/exhibit/2009-04-03/153036931.html . zh:广深港高铁全长142公里 龙华到达香港只需14分钟 . "Chinese: 在广州南站候車廳展示的广州鐵路樞紐總平面布置示意圖,明確標出东涌站及光明站為廣深客運專線(即本線路)車站".
  26. Web site: http://gcontent.oeeee.com/a/2c/a2cc63e065705fe9/Blog/875/b21a0b.html . zh:广深港高铁开通在即 "东涌站"更名"庆盛站" . 2011-07-25 . Xiong Wei (熊薇) . Xu Xiaolei (许晓蕾) . Ma Qiang (马强) . 2011-07-25 . 南方都市报 . dead . https://web.archive.org/web/20120114035607/http://gcontent.oeeee.com/a/2c/a2cc63e065705fe9/Blog/875/b21a0b.html . 2012-01-14 .
  27. Web site: Hong Kong Express Rail Link agreement signed . https://web.archive.org/web/20160319035116/https://www.highbeam.com/doc/1G1-197853817.html . dead . 19 March 2016 . 1 April 2009 . International Railway Journal . 1 May 2015 . subscription . HighBeam Research.
  28. Web site: High speed rail link project delayed . RTHK. 16 April 2014.
  29. Web site: Asia's largest underground railway station opens for business . January 5, 2016 . Smart Rail World . January 6, 2016 . . London.
  30. http://ssrn.com/abstract=2516300 "Report to the Independent Board Committee on the Hong Kong Express Rail Link Project"
  31. News: Damaged TBM Delays Hong Kong to Guangzhou Rail Link . Break Bulk . 2014-04-17 . 2014-12-31 .
  32. http://www.legco.gov.hk/yr07-08/chinese/panels/tp/tp_rdp/papers/tp_rdp-thbtcr11658199-c.pdf 立法會參考資料摘要:廣深港高速鐵路香港段
  33. Web site: Key Information. Express Rail Link. MTR Corporation. 11 August 2015. 15 October 2010. https://web.archive.org/web/20101015014004/http://www.expressraillink.hk/en/project-details/key-information.html. dead.
  34. Web site: China starts work on first underwater railway tunnel_Sci&Tech—China Economic Net. en.ce.cn. 2014-03-11. 2012-02-12. https://web.archive.org/web/20120212224214/http://en.ce.cn/National/stech/200711/14/t20071114_13597252.shtml. dead.
  35. https://web.archive.org/web/20110316000432/http://news.xinhuanet.com/english2010/china/2011-03/12/c_13774762.htm China completes construction of world's fastest underwater railway tunnel
  36. Web site: Tunnel Completed. Shenzhen Daily. 31 December 2014. 31 December 2014. https://web.archive.org/web/20141231060900/http://szdaily.sznews.com/html/2014-12/31/content_3111362.htm. dead.
  37. 中国南车获香港高铁13.6亿元订单. https://web.archive.org/web/20121215171950/http://www.csrgc.com.cn/cns/xwzx/gsxw/2012-04-18/6187.shtml. 2012-12-15. 2012-04-18. CSR received 1.36 billion orders from Hong Kong high-speed rail. CSR. zh-hans.
  38. 中国南车中标香港高铁列车合约. CSR wins the bid for the Hong Kong high-speed rail train contract. https://web.archive.org/web/20141231094150/http://www.csrgc.com.cn/g725/s2485/t57716.aspx. 2014-12-31. 2014-12-31. zh-hans. CSR.
  39. News: rmb-implemented-fare-chart . 4 July 2024. MTR.
  40. Web site: 广深港高铁供电设备故障 多趟车晚点 . 2014-12-31 . 2020-08-07 . https://web.archive.org/web/20200807124832/https://gd.qq.com/a/20120219/000012.htm . dead .
  41. Web site: 高鐵又甩轆?譚文豪:8號月台疑設計缺陷 有列車無法正常開門. Zhuang. Gongnan. 2018-09-27. hk01.com. 2018-09-30. zh-Hant.