广昆通道 | |
Status: | Fully operational |
Open: | 28 December 2016 |
Linelength: | 1285km |
Electrification: | 50 Hz 25,000 V |
Speed: | NaN0NaN0 |
The Guangzhou–Kunming passageway is a high-speed railway passage connecting Guangzhou in Guangdong Province and Kunming in Yunnan Province, passing through Nanning en route. Announced in 2016 as part of China's "Eight Vertical and Eight Horizontal" network, the line is made up of the existing Nanning–Guangzhou high-speed railway and Nanning–Kunming high-speed railway lines. It is about 986 km in length, and is fully operational as of 28 December 2016.
Section Railway line | Description | Designed speed (km/h) | Length (km) | Construction start date | Open date | |
---|---|---|---|---|---|---|
Guangzhou–Nanning Nanning–Guangzhou high-speed railway | Class I high-speed connecting Guangzhou with Nanning. | 250 | 576 | 2008-11-09 | 2014-12-26 | |
Nanning–Kunming Nanning–Kunming high-speed railway) | PDL connecting Nanning with Kunming. | 250 | 709 | 2009-12-27 | 2016-12-28 |