Gribo–Popoli Hydroelectric Power Station Explained

Gribo–Popoli Dam
Dam Crosses:Sassandra River
Location:Ivory Coast
Dam Type:Gravity dam
Construction Began:2021
Opening:2024 Expected
Cost:US$308 million
Plant Capacity:112MW
Plant Annual Gen:580 GWh
Plant Commission:2024 Expected
Location Map:Ivory Coast#Africa#World
Location Map Caption:Location of Gribo–Popoli Dam
Placement on map is approximate
Coordinates:5.6981°N -6.5714°W

The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company.[1]

With partial funding from the Exim Bank of China, the engineering, procurement and construction (EPC) contract was awarded to Sinohydro, the Chinese hydropower engineering and construction company. CI-Energies is the expected off-taker of the energy generated here. Construction is reported to have started in 2021, with commissioning anticipated in 2024.[2]

Location

The power station lies across the Sassandra River, about 15km (09miles) downstream of Soubré Hydroelectric Power Station, outside the city of Soubré.[3] Soubré is located in the Soubré Department of the Nawa Region in the Bas-Sassandra District, in southwestern Ivory Coast. This is approximately 366km (227miles), by road, northwest of Abidjan, the financial capital and largest city in the country.

Overview

This power station is one of three hydroelectric power stations on the Sassandra River, downstream of the Soubré Hydroelectric Power Station. These three dams, when completed, are expected to add a total of 508 MW to the national generation capacity, according to the Ivorian authorities. The dams are Gribo-Popoli HPP: 112 megawatts, Boutoubré HPP: 150 megawatts and Louga HPP: 246 megawatts.[4]

The work at this site includes: (a) building an earth filled dam measuring 4000m (13,000feet) in length (b) six spillway gates (c) an above-ground powerhouse with a total installed capacity of 112 MW (d) a 225kiloVolt switchyard (e) two 8km (05miles) overhead (single circuit) high voltage evacuation transmission lines connecting this power station to the 225kV SoubréSan Pedro high voltage power line (f) 23km (14miles) of permanent access roads.[5]

Construction costs and funding

The estimated cost for the dam and power plant is reported as US$308 million. The Exim Bank of China has lent US$287 million, with the balance contributed by the Ivorian government as equity investment. The table below lays out this information in tabular form.[2]

Rank !!Funding Source!!Amount (USD)!! Percentage!!Notes
1Exim Bank of China
2
Total

Other considerations

This power station will increase the national generation capacity by 112 MW of clean energy and will help to propel the county towards 6 Gigawatts of installed capacity by 2030, that the Ivorian government is aiming at.[1]

See also

External links

Notes and References

  1. Web site: Sinohydro starts building 112 MW hydropower project in Ivory Coast . Enerdata.com . 7 November 2017 . Enerdata . 3 May 2022 . Grenoble, France.
  2. Web site: Construction Review Online . Ivory Coast to receive US $569m for water and electricity projects . 15 August 2021 . Dominic Mandela . 3 May 2022 . Nairobi, Kenya.
  3. Web site: Cote d'Ivoire inaugurates Chinese-built biggest hydropower dam . ChinaDaily.com . 3 November 2017 . Xinhua . 3 May 2022 . Beijing, China.
  4. Web site: Ivory Cost: Sinohydro Will Build Gribo-Popoli Dam . CAC-International.com . 2018 . Ecofin Agency . 3 May 2022 . Douala, Cameroon . CAC-International Quoting Ecofin Agency.
  5. Web site: Otec-Engineering.com . 2018 . Hydroelectric Project of Gribo Popoli - 112MW . Otec Engineering . 3 May 2022 . Beijing China.