Great Western Main Line Explained

Great Western Main Line
Type:Commuter rail, Higher-speed rail[1]
System:National Rail
Status:Operational
Start:London Paddington
Stations:25
Open:30 June 1841 (complete line)
Owner:Network Rail
Linelength:118miles
Tracks:Four (London to Didcot),
two (Didcot to Bristol)
Electrification:25 kV 50 hz AC OLE (London to Chippenham)
Speed:125mph
Signalling:AWS, TPWS, ATP
Map State:uncollapsed

The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to . It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. The GWML is presently a part of the national rail system managed by Network Rail while the majority of passenger services upon it are provided by the current Great Western Railway franchise.

The GWML was built by the original Great Western Railway company between 1838 and 1841, as a dual track line in the broad gauge. The broad gauge remained in use until 1892, after which standard gauge track has been exclusively used. Between 1877 and 1932, many sections of the GWML were widened to four tracks. During 1908, Automatic Train Control (ATC) was introduced as a safety measure. In 1948, the Great Western Railway, and thus the GWML, was merged into the Western Region of British Railways.

During the 1970s, the GWML was upgraded to support higher line speeds, as a result of which many sections permitted operations, enabling the newly-introduced InterCity 125 high speed train (HST) to make faster journeys. British Rail proposed widespread electrification of the line in the late 1970s, although this was not speedily implemented. During the mid 1990s, a stretch of the GWML between London Paddington and Hayes & Harlington was electrified using overhead lines for the Heathrow Express. Further, although not total, electrification was carried out during the 2010s; this permitted the replacement of diesel-powered trains such as the InterCity 125 and with electric and bi-mode train sets such as the Hitachi Super Express high speed trains, specifically the and . Due to budget overruns, the British government deferred electrification of the section through Bath Spa from Royal Wootton Bassett to Bristol in 2016.

Communities served by the GWML include West London (including Acton, Ealing, Hanwell, Southall, Hayes, Harlington and West Drayton); Iver; Langley; Slough; Burnham; Taplow; Maidenhead; Twyford; Reading; Tilehurst; Pangbourne; Goring-on-Thames; Streatley; Cholsey; Didcot; Swindon; Chippenham; Bath; Keynsham; and Bristol. The route includes dozens of listed buildings and structures, including tunnel portals, bridges and viaducts, stations, and associated hotels. Presently, the GWML is electrified between London Paddington and Royal Wootton Bassett. In the long term, Network Rail plans to install European Rail Traffic Management System (ERTMS) in-cab signalling across the entire line.

History

Construction

The construction of what would become the GWML was motivated by several factors, one of the more influential being the sizeable merchant community of Bristol, which keenly advocated for such a railway to be built to help maintain the city's position as the second port of the country as well as the chief one for American trade.[2] More specifically, fearing rising competition from Liverpool and railway developments to its favour, the sought railway was to be preferably built to superior standards as to out-perform any of the lines serving the North West of England. Thus, the line built by the Great Western Railway and engineered by Isambard Kingdom Brunel was originally a dual track line using a wider broad gauge.[3] The line's construction costs were considerably higher due to the use of this broad gauge.

The route of the GWML includes dozens of listed buildings and structures, including tunnel portals, bridges and viaducts, stations, and associated hotels. Part of the route passes through and contributes to the Georgian Architecture of the City of Bath World Heritage Site; the path through Sydney Gardens has been described as a "piece of deliberate railway theatre by Brunel without parallel". Grade I listed structures on the line include London Paddington, Wharncliffe Viaduct, the 1839 Tudor gothic River Avon Bridge in Bristol, and Bristol Temple Meads station.

The line was opened in stages between 1838 and 1841. The first section, between Paddington Station and Maidenhead Bridge station opened on 4 June 1838, while the final section, between Chippenham and Bath, was opened on completion of the Box Tunnel, the longest railway tunnel driven by that time, in June 1841.[4] [5] The line's alignment was so level and straight it was nicknamed "Brunel's billiard table".[6]

Changes under the Great Western Railway

The track was supplemented with a third rail for dual gauge operation, allowing standard gauge trains to also operate on the route, in stages between 1854 and 1875. Dual gauge was introduced as follows: London to Reading (October 1861), Reading to (December 1856), Didcot to (February 1872), Swindon to Thingley Junction, (June 1874), Thingley Junction to (March 1875), Bathampton to Bristol (June 1874), Bristol station area (May 1854). The broad gauge remained in use until 1892, at which point the last 500 miles of track were converted to standard gauge.[6] [7]

Between 1877 and 1899, the original dual tracks were widened to four in numerous places, mainly in the east half of the line: Paddington to (October 1877), Southall to (November 1878), West Drayton to (June 1879), Slough to east side of Maidenhead Bridge (September 1884), Maidenhead Bridge to (June 1893), Reading station (1899), Reading to (July 1893), Pangbourne to Cholsey and Moulsford (June 1894), Cholsey and Moulsford to Didcot (December 1892); also short sections between Didcot and Swindon, and at Bristol.

Following the Slough rail accident of 1900, in which five passengers were killed, improved vacuum braking systems were used on locomotives and passenger rolling stock; furthermore, Automatic Train Control (ATC) was introduced in 1908.[8]

Further widenings of the line took place between 1903 and 1910; another round of widening works occurred between 1931 and 1932. By the 1930s, trains traversing the GWML were reportedly attaining the highest average speeds in the world.[6]

A legacy of the broad gauge was that trains for some routes could be built slightly wider than was normal in Britain; examples included the 1929-built "Super Saloons" used on the boat train services that conveyed transatlantic passengers to London in luxury.[9] When the company celebrated its centenary during 1935, new "Centenary" carriages were built for the Cornish Riviera Express, which again made full use of the wider loading gauge on that route.

At the outbreak of the First World War in 1914, the Great Western Railway, and thus the GWML, was taken into government control, as were most major railways in Britain. After the conflict, the companies were reorganised into the "big four" companies, of which the Great Western Railway was one. The railways, including the GWML, returned to direct government control during the Second World War before being nationalised to form British Railways (BR) in 1948, thus bringing the line into public ownership.[10] [11]

British Rail era

Unlike the other BR regions, which introduced diesel-electric locomotives, the Western Region, to which the GWML belonged, decided to procure a complete range of diesel-hydraulic locomotives to fulfil its type 1 to type 4 power requirements. These included the Warship locomotives, which were based on proven West German designs, the British-designed Class 14, Hymek and Western types. However, these were all eventually withdrawn and replaced with more standard British Rail diesel-electric classes such as the Class 37 and Class 47.

During the 1970s, the line speed of the GWML was upgraded to permit faster operations; this work was in preparation for the introduction of the InterCity 125 high speed train (HST).[12] [13] The HST brought about considerable improvements in service and reduced journey times.[14] [15]

In 1977, the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network and, by 1979, British Rail had presented a range of options that included electrifying the line from Paddington to Swansea by 2000.[16] Under the 1979–90 Conservative governments that succeeded the 1976–79 Labour government, the proposal was not implemented.

In the mid 1990s, the line between London Paddington and Hayes & Harlington was electrified as part of the Heathrow Express scheme, which was officially launched in June 1998.[17] [18]

Privatisation era

As part of the privatisation of British Rail, the Great Western InterCity franchise was awarded by the Director of Passenger Rail Franchising to Great Western Holdings in December 1995, and it began operations on 4 February 1996.[19] [20] Via multiple contract extensions, this operator, which currently trades as Great Western Railway has been the primary operator of passenger services on the GWML for multiple decades.[21] [22] [23]

In August 2008, it was announced that a number of speed limits on the relief lines between Reading and London had been raised, so that 86% of the line could be used at .[24]

By 2019, the partial electrification of the GWML permitted the replacement of InterCity 125 and sets by new Hitachi Super Express high speed trains – the and . The procurement programme for these trains, known as the Intercity Express Programme, was highly impacted by the GWML's electrification scheme, particularly the abandonment of diesel-only trains in favour of bi-mode trains, which were elongated and outfitted with a second transformer to maximise their use of the electrified sections. The electrification of the line also allowed the introduction of other rolling stock, such as EMUs, to conduct shorter-distance services.[25]

Route

Communities served by the Great Western Main Line include West London (including Acton, Ealing, Hanwell, Southall, Hayes, Harlington and West Drayton); Iver; Langley; Slough; Burnham; Taplow; Maidenhead; Twyford; Reading; Tilehurst; Pangbourne; Goring-on-Thames; Streatley; Cholsey; Didcot; Swindon; Chippenham; Bath; Keynsham; and Bristol.[26]

From London to Didcot, the line follows the Thames Valley, crossing the River Thames three times, including on the Maidenhead Railway Bridge. Between Chippenham and Bath the line passes through Box Tunnel, and then follows the valley of the River Avon.

A junction west of Swindon allows trains to reach Bristol by an alternative route along the South Wales Main Line. Other diversionary routes exist between Chippenham and Bath via and the Wessex Main Line, although this involves a reversal at Bradford Junction; and from Reading to Bath via the Berks and Hants Line.

Services

Most services are provided by Great Western Railway (GWR). The stations served by trains between London Paddington and Bristol Temple Meads are,,,, and . Some trains between London and Bristol do not call at Didcot Parkway.

The Elizabeth line runs on the Great Western Main Line between London and Reading.

Fast Heathrow Express trains from Paddington to London Heathrow Airport are operated by GWR on behalf of Heathrow Airport Holdings.[27]

CrossCountry operate trains between Reading and Oxford, using the Great Western Main Line as far as Didcot.

Great Western Railway also operate a train between London Paddington – Cardiff Central every 30minutes, with hourly extensions to Swansea. At Swansea/Cardiff there is a connecting Transport for Wales boat train to/from Fishguard Harbour for the Stena Line ferry to Rosslare Europort in Ireland. An integrated timetable is offered between London Paddington and Rosslare Europort with through ticketing available.[28] Daytime and nocturnal journeys are offered in both directions daily (including Sundays).

Infrastructure

Between London and Didcot there are four tracks, two for each direction. The main lines are mostly used by the faster trains and are on the south side of the route. The relief lines on the north side are used for slower services and those that call at all stations, as only London Paddington, Slough, Maidenhead, Twyford, Reading and Didcot Parkway stations have platforms on the main lines (although a few others have main line platforms that can be used in an emergency). Between Didcot and Royal Wootton Bassett, a series of passing loops allow fast trains to overtake slower ones. This section is signalled for bi-directional running on each line but this facility is usually only used during engineering working or when there is significant disruption to traffic in one direction.

The summit of the line is at Swindon, and falls away in each direction: Swindon is 270feet above Paddington, and 292feet above Bristol Temple Meads. The maximum gradient between Paddington and Didcot is 1 in 1320 (0.75 or 0.075%); between Didcot and Swindon it is 1 in 660 (1.5‰ or 0.15%) but west of Swindon, gradients as steep as 1 in 100 (10‰ or 1%) are found in places, such as Box Tunnel and to the east of .

The line is electrified between Paddington and Langley Burrell (just east of Chippenham) using overhead supply lines; the Reading to Taunton line (as far as Newbury) and the South Wales Main Line (as far as Cardiff Central) are also electrified.

The line speed is .[29] The relief lines from Paddington to Didcot are limited to as far as Reading, and then to Didcot. Lower restrictions apply at various locations.[30] The line is one of two Network Rail-owned lines equipped with the Automatic Train Protection (ATP) system, the other being the Chiltern Main Line.[31]

Tunnels, viaducts and major bridges

Major civil engineering structures on the Great Western Main Line include the following.[32]

Tunnels, viaducts and major bridges on the Great Western Main Line!Railway structure!Length!Distance from London Paddington!Location
Subway Tunnel (LU)117yd0chain67chain – 0chain73chainWest of Royal Oak
Spring Bridge Road Car Park Tunnel121yd5chain70chain – 5chain76chainWest of Ealing Broadway
Hanwell Viaduct44yd7chain35chain – 7chain38chainWest of Hanwell
Wharncliffe Viaduct297yd7chain43chain – 7chain56chain
Hanwell Bridge4chain8chain0chain – 8chain4chain
Maidenhead Viaduct (River Thames)237yd23chain21chain – 23chain32chainEast of Maidenhead
Seven Arch Viaduct68yd31chain19chain – 31chain22chainWest of Twyford
River Loddon Viaduct70yd31chain43chain – 31chain46chain
Kennet Bridge (Kennet & Avon Canal)4chain34chain77chain – 35chain1chainEast of Reading
Gatehampton Viaduct (River Thames)99yd44chain0chain – 44chain5chainEast of Goring & Streatley
Moulsford Viaduct (River Thames)147yd47chain27chain – 47chain34chainEast of Cholsey
River Avon Viaduct72yd90chain77chain – 91chain0chainEast of Chippenham
Chippenham viaduct90yd94chain8chain – 94chain13chainWest of Chippenham
Box Tunnel1yd1452yd99chain12chain – 100chain78chainBetween Chippenham and Bath Spa
Middle Hill Tunnel198yd101chain39chain – 101chain48chain
Sydney Gardens East Tunnel77yd106chain24chain – 106chain28chainEast of Bath Spa
Sydney Gardens West Tunnel99yd106chain29chain – 106chain33chain
Dolemeads Viaduct355yd106chain49chain – 106chain60chain
Arches and St James Viaduct600yd106chain68chain – 107chain20chainWest of Bath Spa
Twerton Viaduct638yd108chain29chain – 108chain58chainBetween Oldfield Park and Keynsham
Twerton Short Tunnel45yd108chain70chain – 108chain72chain
Twerton Long Tunnel264yd109chain3chain – 109chain15chain
Saltford Tunnel176yd111chain57chain – 111chain65chain
St Annes Park Arches Viaduct4chain115chain25chain – 115chain29chainBetween Keynsham

and Bristol Temple Meads

St Annes Park No.3 Tunnel (or Foxes Wood Tunnel)1017yd115chain58chain – 116chain25chain
St Annes Park or (Bristol) No.2 Tunnel154yd116chain41chain – 116chain48chain
Main River Viaduct (River Avon)108ydc. 117chain24chain
Main Down Viaduct (River Avon)141yd117chain21chain – 117chain27chain
The Feeder117chain51chain
Floating Harbour3chain118chain16chain – 118chain19chain

Line-side monitoring equipment

Line-side train monitoring equipment includes hot axle box detectors (HABD) and 'Wheelchex' wheel impact load detectors (WILD), sited as follows.[33]

Line-side monitoring equipment on the Great Western Main Line!Name & Type!Line!Location (distance from Paddington)
Maidenhead HABDUp Relief24chain3chain
Up Main24chain10chain
Waltham WILDUp Relief, Down Relief, Up Main, Down Main26chain21chain
Twyford HABDDown Relief, Down Main32chain2chain
Basildon HABDUp Relief, Down Relief, Up Main(Down Main disconnected December 2016)43chain42chain
Cholsey WILDUp Relief, Down Relief, Up Main, Down Main49chain5chain
Wantage Road HABDUp Main59chain57chain
Bourton HABDDown Main72chain20chain
Studley HABDUp Main81chain40chain
Twerton HABD Down Main108chain60chain

Recent developments

See main article: 21st-century modernisation of the Great Western Main Line. Since 2011, the Great Western has been undergoing a £5billion modernisation by Network Rail.

Reading railway station saw a major redevelopment with new platforms, a new entrance, footbridge and lifts; the work was completed a year ahead of schedule[34] in July 2014.[35] [36]

Electrification

The eastern section from Paddington to was electrified in 1998. The Crossrail project covered electrification of the line from Airport Junction to Maidenhead and, following a number of announcements and delays, the government announced in March 2011 that it would electrify the line as far as Bristol Temple Meads.[37] [38]

Following delays to the work and a large increase in costs,[39] the Conservative government announced in July 2017 that, for the time being, electrification would only be completed as far as Thingley Junction, 2miles west of Chippenham.[40] [41] Electrification as far as Didcot Parkway was completed in December 2017,[42] and to Thingley Junction in December 2019.

Electrification of associated lines, including Bristol Parkway to Temple Meads and Didcot to Oxford, was also postponed indefinitely; electrification of the route between London and Cardiff was completed in 2019.[43] The government argued that bi-mode trains would fill in the gaps pending completion of electrification, although the Class 800 trains are slower in diesel mode than under electric power.

Other proposals

Network Rail plans to install European Rail Traffic Management System (ERTMS) in-cab signalling on the Great Western line;[44] this is a pre-requisite for the Super Express trains to run at 140mph (225km/h).[45] Some of this resignalling work was undertaken during the electrification work.[44] Furthermore, Network Rail has envisaged the deployment of ERTMS to function as the replacement for the aging ATP system.[46]

Further capacity improvements are also scheduled at Swindon, adding to recent changes and the new Platform 4.

Crossrail services are planned to terminate at Reading. Some of the current suburban services into London Paddington are planned to be transferred to the new Crossrail service, which will free up some surface-level capacity at Paddington.

Other more distant aspirations include resignalling and capacity improvements at Reading; the provision of four continuous tracks between Didcot and Swindon (including a grade-separated junction at Milton, where the westbound relief line switches from the north side of the line to the south); and resignalling between Bath and Bristol to enable trains to run closer together.

Access to Heathrow Airport from the west remains an aspiration and the 2009 Heathrow Airtrack scheme, abandoned in 2011, proposed a route south of the Great Western Main Line to link the airport with Reading. Plans for electrification of the line will make it easier to access Heathrow from Reading, since lack of electrification between Reading station and Airport Junction (near West Drayton station) was a limiting factor. Plans under consideration in 2014 included new tunnels between Heathrow and Langley.[47]

Signalling Solutions is to resignal the 12miles from Paddington to, including the Airport branch, as part of the Crossrail project.[48]

Calls for station reopenings

There are calls for the reintroduction of Corsham station due to recent growth of the town.[49] The original station was closed to passengers in 1965.

A local group is campaigning for the reopening of Saltford station between Bath and Bristol, to coincide with electrification.[50]

There have also been calls to reopen the former Wantage Road station.[51] Oxfordshire County Council included a proposal for a new station to serve Wantage and Grove in their 2015–2031 local transport plan.[52]

Major incidents

Rolling stock

Commuter trains

ClassImageTypeTop speedCars per setNumberOperatorRoutesBuilt
mphkm/h
Diesel Multiple Unit90145222Great Western Railway
  • Cardiff Central – Portsmouth Harbour
  • Cardiff Central/Bristol Temple Meads – Exeter St Davids
  • Bristol Temple Meads – Weymouth
1989–92
319
220Great Western Railway
  • Reading – Redhill or Gatwick Airport
  • Reading – Basingstoke
  • Reading or Didcot Parkway – Oxford or Banbury
  • Twyford – Henley-on-Thames
  • Maidenhead – Marlow
  • Slough – Windsor & Eton Central
  • West Ealing – Greenford
  • Bristol Temple Meads – Avonmouth or Severn Beach
  • Great Malvern – Bristol Temple Meads – Southampton Central or Weymouth
  • Swindon – Gloucester or Weymouth
  • Cardiff Central – Portsmouth Harbour
1990-92
316
321Great Western Railway1992-93
Electric Multiple Unit90145970Elizabeth lineLondon Paddington to Heathrow Terminal 4, Heathrow Terminal 5 and Reading2015-19
110177436Great Western RailwayLondon Paddington to Didcot Parkway
London Paddington and Reading to Newbury
2016–17

High speed trains

ClassImageTypeTop speedCars per setNumberOperatorRoutesBuilt
mphkm/h
DEMU1252014 or 534CrossCountry
22
Bi-Mode Multiple Unit140225536Great Western RailwayLondon Paddington to:2014-18
921
522London Paddington to: 2017-20
914

Sleeper trains

ClassImageTypeTop speedNumberOperatorRoutesBuilt
mphkm/h
Diesel locomotive951524 to (The Night Riviera)1998-2004
Mark 3Passenger coach125200181975-88

Notes

The reference for the route map diagram is:-

See also

References

Sources

Further reading

Notes and References

  1. News: Bowen . Douglas John . Hitachi Rail Europe taps Huber+Suhner . 2 December 2014 . Railway Age . 1 December 2014 . 4 March 2016 . https://web.archive.org/web/20160304212329/http://www.railwayage.com/index.php/communications/hitachi-rail-europe-taps-huber-suhner.html . dead.
  2. Book: Channon, Geoffrey . Bristol and the Promotion of the Great Western Railway, 1835 . 0-901388-45-9 . Bristol Historical Association . 1985 . Bristol, UK . 1985 . en-GB.
  3. Clark . GT . G. T. Clark . The Birth and Growth of the Broad Gauge . Gentleman's Magazine . 279 . 489–506 . 1895.
  4. Web site: Victoria County History: Wiltshire: Vol 4: Railways . 1959 . Crittall . Elizabeth . british-history.ac.uk . University of London . 27 December 2017 . 16 July 2021 . https://web.archive.org/web/20210716084149/https://www.british-history.ac.uk/vch/wilts/vol4/pp280-293 . live . en-GB.
  5. Book: Swift, Andrew . The Ringing Grooves of Change . 2006 . Akeman Press . 0-9546138-5-6 . 215–249 .
  6. The Great Western: the world's first high speed railway . Gareth . Dennis . Rail . 873 . 27 February 2019.
  7. Book: Clinker, C. R. . New light on the Gauge Conversion . 1978 . Avon-Anglia . Bristol, UK . 0-905466-12-8 . 15–16 .
  8. Book: Faith, Nicholas . 2000 . Derail: Why Trains Crash . London, UK . . 53 . 9780752271651.
  9. Book: Harris, Michael . Great Western Coaches From 1890 . David and Charles . 1985 . 3rd . Newton Abbot . 0-7153-8050-8 . 83.
  10. January–February 1948 . British Railways . . Westminster, UK . Railway Publishing Company . 1 January 1948 . 94 . 573 . 72 . en-GB.
  11. March–April 1948 . The Minor British Railways and the Joint Lines . . Westminster, UK . Railway Publishing Company . 1 March 1948 . 94 . 574 . 126 . en-GB.
  12. High speed track on the Western Region of British Railways . Collins . R.J. . Proceedings of the Institution of Civil Engineers . 1978 . 64 . 2 . 207–225 . . 10.1680/iicep.1978.2755 . en-GB.
  13. News: New train speeds into service . 15 May 2019 . BBC News . 4 October 1976 . en-GB.
  14. News: Owen . A.D. . Phillips . G.D.A. . . The Characteristics of Railway passenger demand . 234 . en-GB.
  15. News: High Speed Train marks 30 years . BBC News . 29 April 2009 . 4 October 2006 . Joe . Campbell . en-GB.
  16. Book: Railway Electrification . Winter 1979 . British Railways Board (Central Publicity Unit) . 0–2, 8.
  17. Web site: Heathrow Express . 30 June 2020 . Railway Technology . en-GB . 15 August 2018 . https://web.archive.org/web/20180815045612/https://www.railway-technology.com/projects/heathrow-express/ . live.
  18. News: 23 June 1998 . Heathrow Express takes off . live . https://web.archive.org/web/20201220201437/http://news.bbc.co.uk/2/hi/uk_news/118180.stm . 20 December 2020 . 6 August 2016 . BBC News . en-GB.
  19. News: The passenger train . Bellos . Alex . 20 September 1997 . The Guardian . London, UK . 4 September 2020 . en-GB.
  20. Web site: Railway Organisations Research Paper 99/80 . House of Commons Library . 20 September 1999 . en-GB.
  21. Critical rail services protected in new GWR and Southeastern . Department for Transport . 30 March 2020.
  22. https://web.archive.org/web/20200401051953/https://www.railwaygazette.com/uk/firstgroup-says-new-great-western-contract-has-appropriate-balance-of-risk-and-reward/56134.article . 1 April 2020 . FirstGroup says new Great Western contract has appropriate balance of risk and reward . Railway Gazette International . London, UK . 30 March 2020.
  23. Web site: First Greater Western Limited 2022 national rail contract . Department for Transport . 14 June 2022 . 5 March 2023.
  24. Web site: First Great Western Customer Panel . 24 November 2008 . . 11 October 2010 . https://web.archive.org/web/20101011164756/http://firstgreatwestern.co.uk/Documents/Custom/Customer%20panel/East%20Customer%20Panel%209.10.08%20minutes%20-%20WEBSITE.pdf . dead . en-GB.
  25. Web site: 24 March 2015 . Derby to build new trains for First Great Western . 2 January 2017 . railnews.co.uk . 16 July 2021 . https://web.archive.org/web/20210716084228/https://www.railnews.co.uk/news/2015/03/24-derby-to-build-new-trains.html . live . en-GB.
  26. Web site: Western Route specification . 13 March 2020 . 16 July 2021 . https://web.archive.org/web/20210716084203/https://www.networkrail.co.uk/wp-content/uploads/2016/11/Network-Specification-2016-Western-Route.pdf . live.
  27. GWR to manage Heathrow Express service . Railway Gazette International . 3 August 2024 . 3 June 2020 . https://web.archive.org/web/20200603162618/https://www.railwaygazette.com/gwr-to-manage-heathrow-express-service/46205.article . live.
  28. Web site: Sail and Rail to Britain – Train and Ferry Travel to England & Wales – Stena Line . Stenaline.ie . 16 September 2013 . https://web.archive.org/web/20131203005619/http://www.stenaline.ie/ferry/rail-and-sail/fishguard/ . 3 December 2013 . dead . en.
  29. Web site: About Great Western Main Line . Agility Trains . 20 December 2015 . https://web.archive.org/web/20151222115910/http://www.agilitytrains.com/great-western-main-line . 22 December 2015 . dead . en-GB.
  30. Web site: Route Plans 2007 Route 13 Great Western Main Line . Network Rail . 20 December 2015 . https://web.archive.org/web/20120925215820/http://www.networkrail.co.uk/browse_documents/BusinessPlan2007/PDF/Route_2013_Great_Western_Main_Line.pdf . 25 September 2012 . dead . en-GB.
  31. Web site: Great Western Main Line ATP Pilot Scheme . Train Testing . 20 December 2015 . 23 December 2015 . https://web.archive.org/web/20151223114737/http://www.traintesting.com/GWML%20ATP.htm . live.
  32. Book: Bridge, Mike . Railway Track Diagrams Book 3 Western . Tackmaps . 2010 . 978-0-9549866-6-7 . Bradford on Avon, UK . en-GB . 1–5.
  33. Web site: HABD and WILD equipment . railwaycodes.org.uk.
  34. News: Reading rail station revamp 'a year ahead of schedule' . BBC News . 9 July 2012 . 11 December 2015 . 16 July 2021. https://web.archive.org/web/20210716084222/https://www.bbc.com/news/uk-england-berkshire-18769442 . live . en-GB.
  35. Web site: £425M transformation planned at Reading . railnews.co.uk . 30 October 2011 . 16 July 2021 . https://web.archive.org/web/20210716084206/https://www.railnews.co.uk/news/general/2008/09/10-reading-station-boost.html . live . en-GB.
  36. Web site: Queen opens revamped Reading station . https://web.archive.org/web/20210716084204/https://www.bbc.co.uk/news/uk-england-berkshire-28334188 . 16 July 2021 . BBC News . 17 July 2014 . en-GB.
  37. Web site: 1 March 2011 . Great Western electrification and IEP to go ahead . 1 July 2020 . railnews.co.uk . 16 July 2021 . https://web.archive.org/web/20210716084207/https://www.railnews.co.uk/news/general/2011/03/01-great-western-electrification-and-iep.html . live . en-GB.
  38. Web site: Network Rail . June 2011 . Modernising the Great Western . dead . https://web.archive.org/web/20130413065743/http://www.networkrail.co.uk/uploadedFiles/networkrailcouk/Contents/Improvements/The_Great_Western/WesternVision.pdf . 13 April 2013 . 24 August 2016 . en-GB.
  39. Web site: 21 October 2015 . Cost of Great Western mainline electrification project triples to £2.8bn . live . https://web.archive.org/web/20210716084235/https://www.theguardian.com/uk-news/2015/oct/21/cost-to-electrify-great-western-mainline-triples-to-28bn-risking-other-schemes . 16 July 2021 . 26 December 2016 . . en-GB.
  40. News: Topham . Gwyn . 20 July 2017 . Grayling sparks fury by scrapping rail electrification plans . en-GB . The Guardian . live . 23 December 2017 . https://web.archive.org/web/20210716084149/https://www.theguardian.com/uk-news/2017/jul/20/grayling-sparks-fury-by-scrapping-rail-electrification-plans . 16 July 2021 . 0261-3077.
  41. Web site: 8 November 2016 . Great Western electrification projects deferred . live . https://web.archive.org/web/20210716084147/https://www.railwaygazette.com/infrastructure/great-western-electrification-projects-deferred/43474.article . 16 July 2021 . 1 July 2020 . Railway Gazette International . en.
  42. Web site: 2 January 2018 . GWR Electrostar fleet enters service after electrification completed . live . https://web.archive.org/web/20180517214212/http://www.railtechnologymagazine.com/Rail-News/gwr-electrostar-fleet-enters-service-after-electrification-completed . 17 May 2018 . 29 February 2024 . Railway Technology Magazine.
  43. Web site: 30 January 2020 . Major projects update: January . dead . https://web.archive.org/web/20200131104248/https://www.networkrail.co.uk/stories/major-projects-update-january . 31 January 2020 . 28 January 2023 . Network Rail . en-GB.
  44. Web site: DfT Rail Electrification paper . Department for Transport . 16 September 2013 . dead . https://web.archive.org/web/20090805225151/http://www.dft.gov.uk/pgr/rail/pi/rail-electrification.pdf . 5 August 2009 . en-GB.
  45. See Hitachi Super Express article
  46. Web site: Network Rail Train Infrastructure Interface Specification . Department for Transport . 16 September 2013 . dead . https://web.archive.org/web/20091122073905/http://www.dft.gov.uk/pgr/rail/pi/iep/iepinvitationtotender/infrastructureinterface.pdf . 22 November 2009 . en-GB.
  47. News: Heathrow rail link plan unveiled by Network Rail . 11 April 2015 . BBC News . 6 February 2014 . 16 July 2021 . https://web.archive.org/web/20210716084240/https://www.bbc.com/news/uk-england-26064200 . live . en-GB.
  48. . 671 . 17 . GWML signalling contract signed . 1–14 June 2011 . Nigel . Harris.
  49. News: Hicks . Amber . Corsham Station campaigners meet Department for Transport officials . 11 April 2015 . Wiltshire Times . Newsquest (Oxfordshire and Wiltshire) . 30 October 2014 . 17 April 2015 . https://web.archive.org/web/20150417034244/http://www.wiltshiretimes.co.uk/news/latestheadlines/11568345.Corsham_Station_campaigners_meet_Department_for_Transport_officials/ . live . en-GB.
  50. News: Rail-ly good news over station plan for Saltford . 11 April 2015 . Bath Chronicle . Local World . 13 December 2014 . https://web.archive.org/web/20150923192602/http://www.bathchronicle.co.uk/Rail-ly-good-news-station-plan/story-25616274-detail/story.html . 23 September 2015 . dead . en-GB.
  51. News: MPS call for direct rail service between Oxford and Bristol . BBC News . 30 September 2014 . 21 June 2018 . 16 July 2021 . https://web.archive.org/web/20210716084151/https://www.bbc.co.uk/news/uk-england-29430204 . live . en-GB.
  52. Web site: Connecting Oxfordshire: Local Transport Plan 2015–2031 . 26 August 2015 . 16 July 2021 . https://web.archive.org/web/20210716084155/https://www2.oxfordshire.gov.uk/cms/sites/default/files/folders/documents/roadsandtransport/transportpoliciesandplans/localtransportplan/ConnectingOxfordshirevol1policyandoverallstrategy.pdf . live . en-GB.
  53. News: The Railway Accident at Slough . The Times . London, UK . 21 June 1900 . 11 . Newspapers.com.
  54. Web site: Report on the Derailment that occurred on 19th December 1973 near West Ealing in the Western Region British Railways . I. K. A. . McNaughton . railwaysarchive.co.uk . 3 September 1974 . Department of the Environment.
  55. Web site: The Southall Rail Accident Inquiry Report . John . Uff . John Uff . HSE Books . 7 November 2011 . en-GB.
  56. Web site: Record fine after Southall crash . BBC News . 27 July 1999 . en-GB.
  57. Web site: Thames Trains fined £2m for Paddington crash . The Guardian . 5 April 2004 . 17 December 2016 . 16 July 2021. https://web.archive.org/web/20210716084227/https://www.theguardian.com/uk/2004/apr/05/transport.ladbrokegrove . live . en-GB.
  58. News: Paddington crash prompts £4m fine . BBC News . 30 March 2007 . 30 October 2011 . 16 July 2021 . https://web.archive.org/web/20210716084221/https://secure-uk.imrworldwide.com/v51.js . live . en-GB.