Bridge Name: | Grand Street Bridge |
Carries: | Grand Street and Grand Avenue Q59 (New York City bus) Sidewalk |
Crosses: | Newtown Creek |
Locale: | Brooklyn and Queens, New York City |
Maint: | New York City Department of Transportation |
Id: | 2240390 |
Design: | Swing bridge with through-truss superstructure |
Material: | Steel superstructure and deck with masonry pier |
Length: | 230feet |
Width: | 31.2feet |
Spans: | 1 |
Clearance: | 13.4feet |
Below: | 9.8feet MHW |
Lanes: | 2 |
Begin: | August 1900 |
Cost: | $174,937 |
Traffic: | 10,213 (2016) |
Followed: | Kosciuszko Bridge |
Coordinates: | 40.7165°N -73.9227°W |
References: | [1] [2] |
Bridge Name: | Grand Street Bridge (1890) |
Carries: | Roadway and Brooklyn City Railroad (streetcar) |
Designer: | Dean & Westbrook |
Design: | Swing bridge |
Material: | Iron |
Builder: | Charles A. Cregin |
Begin: | 1889 |
Complete: | July 30, 1890 |
Length: | 120feet |
Spans: | 1 |
Num Track: | 2 |
Width: | 30feet |
Replaces: | Grand Street Bridge (original) |
Replaced By: | Grand Street Bridge (1903) |
Mapframe: | no |
Bridge Name: | Grand Street Bridge (1875) |
Carries: | Roadway and Brooklyn City Railroad (streetcar) |
Design: | Swing bridge |
Complete: | 1875 |
Spans: | 1 |
Num Track: | 1 |
Replaced By: | Grand Street Bridge (1890) |
Mapframe: | no |
Grand Street Bridge is a through-truss swing bridge over Newtown Creek in New York City. The current crossing was completed in 1902, and links Grand Street and Grand Avenue via a two-lane, height-restricted roadway. It is a main connection between the boroughs of Brooklyn and Queens, carrying an average of 10,200 vehicles per day .[3]
According to the New York City Department of Transportation, three distinct swing bridges have spanned Newtown Creek at the location between Grand St. and Grand Avenue.[4] Up until the mid-20th century, the crossing also carried horse-drawn (and later, electrified) streetcars of the Grand Street and Newtown Railroad, which was later leased by Brooklyn City Railroad and eventually became the Brooklyn and Queens Transit Corporation.
One of the earliest references to a permanent crossing is found in an 1864 article from The Brooklyn Daily Times, reporting on the local Board of Aldermen's provision of for the construction of a moveable bridge.[5] Based on sparse details, the first structure apparently featured a deck made of wooden planks and a single-track railroad.[6] [7] It opened in 1875.[8]
Throughout the bridge's life, it was often found to be in a poor state of upkeep,[9] and local newspapers repeatedly wrote of its dangerous condition:[10]
By 1889 the bridge was so deteriorated that on July 14, half of it "fell with a crash into the creek."[11] A year later, residents appeared to be questioning even the basic viability of bridges over Newtown Creek, with one Supervisor of Jamaica, Queens suggesting that the quadruple of Newtown's bridges be replaced with tunnels modeled after contemporary examples in Chicago. An editorial highlighted the claim that the initial cost of a "decently designed" drawbridge was no less than that of a tunnel, but a bridge would incur significantly higher maintenance, operation, and tending costs throughout its lifetime.[12]
In the fall of 1888, the Bridge Committee of the Supervisors of Kings and Queens Counties announced the exploration of replacement options for the original bridge.[13] After a request for proposal process which specified an iron bridge with either a stone or wooden substructure, a construction contract was awarded in July of the following year. The winner, Charles A. Cregin (employing a Dean & Westbrook design), was a native New Yorker who estimated a replacement cost of .[14] [15]
Construction began in the summer of 1889, with expectations of the crossing being closed to road and rail traffic for nearly five months.[16] The project's completion was formally accepted by county Supervisors on July 30, 1890[17] at a final cost of around, including the bridge's rebuilt approaches.[18] Shortly after construction, an additional was approved (controversially) to add a bridge-keeper's shelter.[19] On March 24, 1984, the bridge was electrified to enable trolley service.[20] Installed some time later, electrical machinery which could open and close the span in around "half a minute" was far more advanced than most of Brooklyn's other man-operated moveable bridges.[21]
While the new span was an improvement on its predecessor, the warm welcome would be short-lived. A significant controversy developed just eight years after its opening when local businessmen, represented by Congressman Charles G. Bennett, secured federal funding for dredging Newtown Creek to the tune of . While the new channel depth of 18feet was a boon to shipping interests, it also required reinforcement of the bridge foundation. This had the side-effect of narrowing each draw opening by 6feet and further-complicating the channel's geometry, making it unusable by vessels longer than 125feet LOA (i.e.– most of the freight vessels in operation on the creek at the time).
After receiving complaints from the area's maritime operators, the United States Department of War became involved in the dispute. The agency, which would soon gain federal authority over all domestic waterway navigability with Congress' passage of the Rivers and Harbors Act of 1899, notified the City of its position in a letter:[22]
Citing a lack of funding for a replacement, the city's Department of Bridges desired to keep the crossing in place. At a hearing before the United States Army Corps of Engineers on January 17, 1889, Bridge Commissioner John L. Shea argued that his department had received no formal complaints,[23] and that the existing structure was better than no bridge at all. According to the department's Chief Engineer, "at any rate, they can only condemn the bridge. They cannot make us build another."
Eventually, the weight of the federal government overpowered the city's resistance in a letter from the Secretary of War dated February 15, 1899. It mandated the previous proposal, effectively condemning the existing crossing. City Comptroller Bird Sim Coler was confident that funding could be secured for a replacement, since "the city could not afford to allow important highways to come in danger of being closed to all passage."[24]
On April 21, 1899, the New York City Board of Estimate under Mayor Robert Anderson Van Wyck authorized bonds worth for construction of the third Grand Street Bridge.[25] According to a campaign ad, the measure was one of several concurrent public works in Brooklyn (including the Williamsburg Bridge) totaling over worth of investment.[26] Initial plans, drawn by the New York City Department of Bridges and approved by the Department of War on July 24, 1889, specified a steel through-truss superstructure with a masonry pier and abutments. The 195feet asymmetric span would provide a clear opening of 91feet on the western side of the channel and 55feet on the eastern side.[27] [28] After a lengthy delay before the New York City Board of Aldermen, the bridge was granted final approval in December 1899.[29]
At some point in early 1900, the bridge's specifications were altered to extend the eastern portion of the span, ensuring an equal 91feet of clearance on both sides with a total span of around 230feet.[30] Only two construction bids were received, and local contractor Bernard Rolf was awarded the project on July 23.[31] Work began in August with a projected timeline of 15 months,[32] but the project became plagued with labor strikes, material delays, and accusations by the Department of Bridges of contractor incompetence.[33] During construction, trolleys were detoured along Flushing and Metropolitan Avenues, and a temporary wooden footbridge stood alongside the crossing.[34] After a 13-month delay, the new bridge was finally completed under the direction of city engineers. In a stroke of irony, it opened on December 26, 1902, the very same day that its predecessor re-opened to the public, just downstream, in a second life as a temporary crossing supporting construction of the Vernon Avenue Bridge.[35]
While Newtown Creek (and the new bridge) saw heavy use by maritime traffic through the early and middle decades of the 20th century, a greater trend toward highway and rail transportation in the postwar era also correlated to fewer drawbridge openings as time progressed. According to NYCDOT data, Grand Street Bridge's opening frequency had fallen to fewer than 100 instances per year by 1997. Due to minimal usage, the Coast guard amended federal regulations in 2000 to require a full 2 hours of advance notice for any Newtown Creek drawbridge openings.[36]
In the spring of 1894, a large fight broke out between county law enforcement and workers of the Brooklyn City Railroad when a construction permit dispute turned violent. According to a front-page report in The Standard Union newspaper, the railroad long-intended to install electrified trolley wires on the second Grand Street Bridge, but had failed to obtain permission from municipal engineers of Kings and Queens counties. Just before midnight on March 21, in defiance of local authorities, the railroad dispatched three work wagons and at least 60 men. The workmen swiftly overpowered the few sheriff's deputies who had been warned in advance, resulting in one officer injury and one worker being arrested in the tussle.[37]
While some of the installation was carried out later that night after the deputies retreated, the situation escalated severely on the morning of March 24.[38] When the railroad workers returned that Saturday, they were met with more sheriff's deputies from both Kings and Queens counties, who had been keeping watch all night.[39] A news article, paraphrased below, detailed what happened next:When colleagues of Deputy Mayer attempted to assist his defense of the bridge, they reportedly injured the horses drawing the railroad's wagons across the span. Local constables of the Town of Newtown, sympathetic to the railroad, then arrested the deputies under the charge of animal abuse, after which a town judge held them to a bail bond of . The trolley wires were ultimately completed, and the bridge continuously hosted rail service until the introduction of the B59 (now Q59) bus line in 1949.[40]
On December 9, 1902, three weeks before the current bridge officially opened, a tugboat captain was arrested for attempting to force open the structure using a hawser attached to his vessel.[41]