Upper Gotvand Dam | |
Location Map: | Iran |
Location Map Relief: | 1 |
Coordinates: | 32.2661°N 48.9358°W |
Country: | Iran |
Location: | Gotvand, Gotvand County, Khuzestan Province |
Status: | O |
Construction Began: | August 2004 |
Opening: | 2012 |
Owner: | Iran Water & Power Resources Development Co. |
Dam Type: | Earthfill dam |
Dam Height Foundation: | 1800NaN0[1] |
Dam Length: | 7600NaN0 |
Dam Width Crest: | 150NaN0 |
Dam Width Base: | 10750NaN0 |
Dam Volume: | 285000000NaN0 |
Dam Crosses: | Karun River |
Spillway Count: | 4 |
Spillway Type: | Service, controlled ogee-type |
Spillway Capacity: | 175000NaN0 |
Res Name: | Upper Gotvand Reservoir |
Res Capacity Total: | 4500000000m2 |
Res Catchment: | 324250NaN0 |
Res Surface: | 96.50NaN0 |
Plant Commission: | 2012 |
Plant Type: | Conventional |
Plant Turbines: | 4 x 250 MW Francis-type |
Plant Capacity: | 1,000 MW (currently) 2,000 MW (with phase 2) |
Plant Annual Gen: | 4,500 GWh |
Upper Gotvand Dam, or simply the Gotvand Dam (Persian: سد گتوند بالا), is an embankment dam on the Karun River about 12km (07miles) northeast of Gotvand in Khuzestan Province, Iran. It currently has an installed capacity of 1,000 MW with another 1,000 MW in the works for a second phase. Studies for the project on Karun River began in the 1960s and specific designs on the Upper Gotvand were presented in 1967, 1975 and 1982. After the design and location were chosen, a further study was carried out in 1997. Preliminary construction (roads, bridges, river diversion) began the same year. Besides the hydroelectric power production, the dam was also aimed at flood control. The river was diverted by April 2003 and excavation began soon thereafter. After completion of the dam, impounding of its reservoir began on 30 July 2011 during a ceremony attended by Iranian President Mahmood Ahmadinejad. The first generator of phase one was commissioned on 5 May 2012, two more by 18 September 2012 and the final in November 2012.[2] [3] Ahmadinejad was again present for the dam's inauguration on 22 April 2013.[4] Phase 2 is estimated to be complete in 2015 and the dam is going to become one of Iran's largest power stations and is already its tallest earth-fill dam.[5] [6]
Downstream of the Upper Gotvand Dam is the 22m (72feet) high Lower Gotvand Dam at . Constructed from 1975 to 1977, it serves to divert portions of the river into two canals for the irrigation of 42000ha of farmland.[7] [8]
The goals of building this dam are:
Before the water extraction of this dam, one of the important debates and disagreements surrounding the construction of this dam was that in the downstream part of this dam, the ground has salt veins and this can cause the saltiness of the water used by the cities and villages downstream.[11] Engineer Meshkat, a geologist and a member of the team that prepared the geological map of the dam, said that the design team was aware of the problem of the dam lake being located on salt masses. Also, Isa Kalantari, the former head of the Environmental Protection Organization, says: Before the revolution, the Americans examined the Gotvand dam from an environmental point of view and decided to build the dam 15 kilometers higher. He believes that the executors of the Gotvand dam project should be tried for the error in the implementation of this project. He said to the students of Tehran University Geography Faculty and environmental activists: "The salinity of the water below the dam is 5.5 times the salinity of the water in the Persian Gulf, and nothing can be done to solve this problem."
Since before and after the water intake of Gotvand Dam, there have been criticisms about the salinization of the water of the Karun River by the lake of this dam due to its location on the Gachsaran formation and its proximity to the salt mountains. These criticisms had caused widespread concerns, and as a result, the dam's water intake had been postponed several times.[12] [13]