Gothenburg tram network explained

Box Width:auto
Gothenburg tram network
Imagesize2:320px
Owner:Gothenburg Municipality
Locale:Gothenburg
Mölndal, Sweden
Transit Type:Tram
Lines:12
Stations:132
Annual Ridership:145,000,000[1]
Began Operation:24 September 1879
Operator:Göteborgs Spårvägar
Host:Västtrafik
Vehicles:263
System Length:801NaN1 of double track[2]
Track Gauge:
(standard gauge)
Average Speed:22.7km/h
Top Speed:60km/h allowed
(max 80km/h)
Map State:collapsed

The Gothenburg tramway network (Swedish: Göteborgs spårvägar) is part of the public transport system organised by Göteborgs Spårvägar, controlled by Västtrafik in the Swedish city of Gothenburg.[3] The system's approximately 160km (100miles) of single track - making it the largest tram network in Northern Europe[4] - is used by around 200 trams, which serve twelve day-time and five night-time lines with a combined line length of 190 km. These figures are expected to increase when the second stage of Kringen (short for Kollektivringen, the public transport ring) is finished. The trams perform about 2,000 trips and cover 30,000 km per day. In 2018, 131 million journeys were made (with changes counting as a new journey).

History

The first tram line in Gothenburg was started in 1879 by the English company Gothenburg Tramway Ltd. This was a horse-drawn tramway, which stretched from Brunnsparken to Stigbergsliden. The city of Gothenburg bought the tramway in 1900, and introduced electrically powered trams only two years later when Sigfrid Edström led the electrification of the trams. During the next 40 years, the tram system was heavily expanded, reaching outside the city borders by 1907, and Hisingen in 1940.

In the 1960s, plans for converting the tram system to an underground rapid transit system were created, and the new tram sections to the Tynnered, Angered, Bergsjön and Länsmansgården suburbs were built free from level crossings and partly in tunnels to make a future conversion to underground standards easier. However, after further investigation, it was concluded that it would be too expensive to dig the necessary tunnels under the city centre, as the foundation of the city is partially made up of clay.

When Sweden's switch to right-hand traffic in 1967 made existing unidirectional trams obsolete, Gothenburg was one of only two cities in Sweden to maintain its city-centre tramway, the other such network to survive being the Norrköping tramway.

The expansion of the net through the Kringen is gradually creating a tramway ring around the city centre. In 1999 the first step was started, which most notably included the 1,050 m long Chalmers tunnel which was opened for traffic in 2002, connecting the Chalmers station with the Korsvägen hub. The second and third steps are currently in the planning stage.

Since 2010, the previously used magnetic stripe cards have been replaced with RFID cards. Ticket machines taking coins and credit cards have also been installed on the trams, along with a text message system where tickets may be purchased with mobile phones.[5] From about 2019, a phone app has become the leading mode of ticket purchase.

Lines

LineStretchLengthStopsTravel time[6] Average speedPassengers/day[7]
Tynnered - Östra Sjukhuset15.6 km3347/49 min19.1 km/h32 500
Högsbotorp - Mölndal (via Ullevi)12.9 km2740 min[8]
Marklandsgatan - Kålltorp (via Brunnsparken)12.7 km3044/45 min16.9 km/h32 400
Mölndal - Angered (via Brunnsparken)19.3 km2141/40 min28.2 km/h27 400
Östra Sjukhuset - Länsmansgården (via Korsvägen)13.8 km2939/38 min21.2 km/h25 500
Länsmansgården - Kortedala (via Järntorget-Sahlgrenska-Korsvägen)24.6 km4671/71 min20.7 km/h43 400
Tynnered - Bergsjön21.1 km3554/55 min23.0 km/h35 900
Frölunda - Angered (via Korsvägen)21.3 km2546/47 min27.2 km/h19 600
Kungssten - Angered (via Brunnsparken)19.0 km2143/43 min26.5 km/h25 600
Guldheden - Eketrägatan/Biskopsgården8.8 km[9] 17/2324/31 / 25/32 min21.7 km/h[10] 15 600
Saltholmen - Bergsjön21.8 km3858/58 min22.6 km/h38 000
Planned tram line - rumoured to go from Kortedala to Saltholmen via Brunnsgatan and Marklandsgatan.
 - Saltholmen (going to Saltholmen via Järntorget and Kungssten, but via Marklandsgatan and Korsvägen going to Central Station)7.9 km1323 min
Brämaregården- Nymånegatan. 12 stops
"Liseberg Line" operated by heritage trams. Has the route Central Station – Liseberg – (Sankt Sigfrids plan) (3.5 km; 8 stops).
Instead of route number on cars used for driver training (when not with passengers) and at special events. One example is the European Athletics Championships in August 2006 when the line sign was "Teams Tram" for the European Championship participant.

Most tram lines pass through Brunnsparken, which is effectively the central hub of public transport in Gothenburg. The exceptions are lines 8 and 14. The Central Station is also a major stop, especially because it is the nearest stop not only for train passengers but also passengers coming from the neighbouring Nils Ericson Terminal, where coaches, airport buses to Landvetter Airport and City Airport (not being used for public passenger travel, but remains open for flying schools) and regional buses stop. Korsvägen is another major stop, where lines 6 and 8 meet lines going into the city centre and out to Mölndal. Most tram lines are on the south side of the river, but lines 5, 6, 10 and 14 cross the Hising bridge to the north side.

Rolling stock

The types of tramcars currently running in Gothenburg are:

In 2013 work with deciding new tram stocks began. By April 2016, it was announced that a minimum 40 trams of the new model M33 had been ordered from Bombardier Transportation Sweden AB/Vossloh Kiepe GmbH for delivery by year 2019.[12] In 2022 Västtrafik ordered 40 more trams of the same model, an order that was later expanded to 60. Those will be designated M34, an extended, 45 meter long version of the M33. They will be delivered from late 2023 onwards. When all M33 and M34 trams are delivered in 2026, the old M29 trams still in service will be decommissioned.[13] [14]

There is a fleet of heritage trams used in the network.One of the oldest trams, M1 15, which was built in 1902, is preserved in operational condition.

See also

References

External links

Notes and References

  1. Web site: Resandet med Västtrafik fortsätter öka. Travel with Västtrafik continues to increase. sv. Västtrafik. 2019-02-06. 11 October 2019. 11 October 2019. https://web.archive.org/web/20191011100918/https://www.vasttrafik.se/om-vasttrafik/nyhetsarkiv/resandet-okar/. dead.
  2. Web site: Spårväg Göteborg. Svenska Spårvägssällskapet. sv.
  3. Web site: Gothenburg: A City Built on Rock 'n' Roll. natgeotraveller.in. National Geographic Traveller India. 8 March 2019. 7 June 2022. Zac. O'Yeah. https://web.archive.org/web/20190313071556/http://www.natgeotraveller.in/gothenburg-a-city-built-on-rock-n-roll/. 13 March 2019. live.
  4. Web site: Martin. Rudolphi . A study of the possibility and the potential effects of a tramway tunnel construction in Gothenburg City . Chalmers University of Technology . Masters Thesis . 8 . pdf . 20 April 2013.
  5. Web site: Färdbevis och priser. dead. https://web.archive.org/web/20120323200715/http://www.vasttrafik.se/Priser--Produkter/Fardbevis-och-priser/. 23 March 2012. Västtrafik. sv.
  6. Measured during rush hours, first number along stretch as written, second number in opposite direction.
  7. Measured weekdays in November 2005.
  8. Timetable value, not actually measured
  9. From Guldheden to Eketrägatan.
  10. From Guldheden to Biskopsgården.
  11. Web site: Vasell . Magnus . Persson . Isabella . Botsjö . Markus . 48 spårvagnar tas ur bruk – är trafikfarliga . Göteborgs-Posten . 10 January 2022 . 2021-10-28.
  12. News: Avtalet klart för nya spårvagnsleveranser till Göteborg. 2016-10-11. Göteborgs Spårvägar. sv-SE. 2016-11-10.
  13. Web site: Alstom will deliver 40 new trams to Gothenburg in Sweden . 2023-03-23 . Alstom . en.
  14. Web site: Pressmeddelande . 2023-03-23 . www.vasttrafik.se . sv.