Gongguoqiao Dam | |
Location Map: | China |
Coordinates: | 25.5862°N 99.3356°W |
Country: | China |
Location: | Yunlong County, Dali Bai Autonomous Prefecture, Yunnan |
Purpose: | Power |
Status: | o |
Construction Began: | 2008 |
Opening: | 2011 |
Dam Type: | Gravity, roller-compacted concrete |
Dam Crosses: | Lancang (Mekong) River |
Dam Length: | 356m (1,168feet) |
Dam Height: | 105m (344feet) |
Res Capacity Total: | 120000000m2 |
Plant Operator: | Huaneng Lancang Hydropower Co Ltd |
Plant Commission: | 2011–2012 |
Plant Type: | Conventional |
Plant Turbines: | 4 x 225 MW Francis-type |
Plant Capacity: | 900 MW |
The Gongguoqiao Dam is a gravity dam on the Lancang (Mekong) River in Yunlong County of Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction began in 2008, and the river was diverted around the dam site in 2009. The next year concrete placement began, and in 2011 the first generator was commissioned. The 900 MW power station was fully operational on 21 June 2012.[1] [2]