G:link explained
G:link |
Imagesize2: | 300px |
Owner: | Translink |
Locale: | Gold Coast, Queensland, Australia |
Transit Type: | Light rail |
Lines: | 1 |
Stations: | 19 (27 after stage 3 completion) |
Chief Executive: | Phil Mumford |
Headquarters: | Southport |
Website: | www.ridetheg.com.au |
Began Operation: | 20 July 2014 |
Operator: | Keolis Downer |
Vehicles: | 18 Bombardier Flexity 2 trams |
Train Length: | 43.5m (142.7feet) |
Headway: | 7-30 minutes |
System Length: | 20km (10miles) (26km (16miles) after stage 3 completion) |
El: | overhead catenary |
Average Speed: | 27km/h |
Top Speed: | 70km/h |
Map State: | collapsed |
Annual Ridership: | 10.74 million (2018/19) |
G:link, also known as the Gold Coast Light Rail and the Gold Coast Tram, is a light rail system serving the Gold Coast in Queensland, Australia, and is the sole light rail system in Queensland. The system forms part of Translink's South East Queensland public transport network and consists of a single 20km (10miles) line of nineteen stations. The Helensvale railway station is the northern terminus of the system, while Broadbeach South is the southern terminus. The line opened on 20 July 2014 and was extended northwest from Gold Coast University Hospital to Helensvale on 17 December 2017.
Background
The Gold Coast is one of the fastest-growing regions in Australia, with an annual population growth of 2–3%.[1] The project was first proposed in the Gold Coast City Council Transport Plan 1996 after some years of consideration and review. In 2002, the Queensland and Federal Governments each contributed $650,000 to fund the Gold Coast Light Rail Feasibility Study.[2] [3] In 2004, the draft summary report was released.[4]
History
Stage 1
In 2009, the Queensland Government committed $464 million to the Gold Coast Rapid Transit (GCRT) project, supplementing $365 million committed by the Federal Government and $120 million provided by Gold Coast City Council.[5]
In June 2011, the GoldLinq consortium comprising Bombardier Transportation, Downer EDI, Keolis, McConnell Dowell and Plenary Group was awarded the contract to build and operate the Gold Coast light rail line for 18 years under a Public Private Partnership.[6] [7] [8]
In August 2012, the cost of the initial 13adj=onNaNadj=on section was estimated at $1.6 billion.[9] Construction began on the Gold Coast University Hospital station shell in July 2010.[10] In late 2010, early roadworks began in Broadbeach and Southport.[11]
By November 2013, much of the work was complete with the southern section at Broadbeach being the only section of trackwork to be completed. Testing commenced on the northern section of the line in October 2013. The line opened on 20 July 2014, with a free travel day, before normal operations began on 21 July.[12] [13] [14]
The system had a significant impact on property both directly and indirectly in the corridor. A total of $170 million was allocated for property resumptions. The Queens Park Tennis Club and Southport Croquet Club were both relocated.[15]
Stage 2
After the successful opening and operations of Stage 1, the Queensland Government announced in February 2016 plans to extend the light rail line from the University Hospital to the Helensvale railway station, providing a connection with the Gold Coast railway line that connects the city with Brisbane, the state capital of Queensland. Financial commitment from the state and federal governments needed to progress with the extension was finalised in late 2016. The new extension includes 7.3km (04.5miles) tracks and 3 new light rail stations, with Helensvale being the new northern terminus for the line. Construction commenced in 2016[16] with plans to be completed in time for the 2018 Gold Coast Commonwealth Games in April 2018. Construction finished early, ahead of schedule with passenger services commencing in December 2017.
Stage 3 extension
The Queensland Government, in conjunction with the Gold Coast City Council and the Federal Government, announced the plan to extend the light rail line 6.4km (04miles) south, from the existing Broadbeach South station to Burleigh Heads back in 2018 with the original completion date to be in 2024. Due to funding disputes among the three levels of government, the COVID-19 pandemic along with rising construction costs in recent years, the project kept getting delayed. In February 2020, three parties were short-listed to build the extension:[17]
It was announced in October 2020 that John Holland had won the contract,[18] with the state government releasing a statement in 2021 saying that the agreement will see the construction consortium undertake detailed construction planning and start establishing a site presence along the 6.7km (04.2miles) corridor.
In July 2022 construction formally started with water, sewerage and gas infrastructure upgrades and relocation on the Gold Coast Highway between Broadbeach and Nobby Beach. Major construction including earthworks and construction of the tracks will commence in 2023 with the project expected to be operational by 2030.
Planned stations
Eight new light rail stations will be constructed with the original cost estimate of the project at $670 million,[19] which has now blown out to $1.2 billion due largely to rising inflation post-pandemic.
Route
The new extension will begin from the current southern terminus, Broadbeach South travelling on the median strip of the Gold Coast Highway for the whole way south to Burleigh Heads. The 6.7km (04.2miles) extension will pass through Mermaid Beach, Nobby's Beach, Miami and Burleigh Heads with the hopes of creating better connectivity, reducing congestion and improving travel times.
Stage 4 extension
The Gold Coast City Transport Strategy 2031 supports a future expansion to Coolangatta via the Gold Coast Airport.[20] The 14km (09miles) extension of the light rail line from Burleigh Heads station would continue south along the Gold Coast Highway, passing through the southern suburbs of Palm Beach and Tugun and connecting the city's international airport with the light rail. A potential light rail corridor has also been identified from the Airport to Coolangatta and will be preserved for possible future expansion.[21] In August 2020, funding was provided to formulate a business case for the extension.[22] Since 2021 community consultation and preliminary works have begun on stage 4.
Route
See main article: article and List of G:link stations. The single 20km (10miles) line runs from Helensvale railway station to Broadbeach South. Beginning at Helensvale railway station, the line runs parallel to the Gold Coast railway line until it meets the Smith Street Motorway, which it then follows, stopping at Parkwood and Parkwood East. The next two stops serve the Gold Coast University Hospital and the Gold Coast campus of Griffith University. The line runs south, passing over the Smith Street Motorway and the depot before reaching Queen Street station and Nerang Street station that services the Southport medical precinct. The next two stops serve the Australia Fair Shopping Centre, and the following stop serves the Broadwater Parklands. The line passes over the Nerang River before reaching the only stop in Main Beach, which serves the Sea World theme park. The next stops are Surfers Paradise North and Cypress Avenue, the latter serving the Chevron Renaissance Shopping Centre and the Funtime amusement park. The next stop, Cavill Avenue serves the heart of Surfers Paradise including the Cavill Avenue pedestrian mall and Paradise Centre shopping centre. The following station services the Q1 residential tower as well as the SkyPoint observation deck. The next stops are Northcliffe, Florida Gardens and Broadbeach North, the latter serving the Gold Coast Convention & Exhibition Centre, The Star Gold Coast, the Oasis Shopping Centre and the Oracle Shopping Centre. The line terminates at Broadbeach South which serves Pacific Fair Shopping Centre and provides bus connections to southern suburbs as well as the Gold Coast Airport. It takes around 44 minutes to travel from one end of the line to the other.
There are nineteen stations on the line. One station is located in Helensvale, two are in Parkwood, seven are in Southport, one is in Main Beach, six are in Surfers Paradise, and two are in Broadbeach. All but one of the stations is street-level open-air structures with passenger canopies on the platforms. The Gold Coast University Hospital station is underground. Eleven stations have side platforms and eight have island platforms. Eight of the stations have kiosks on the platforms. Seven stations offer transfers to bus services and Helensvale also offers transfers to train services. Two of the stations have free park-and-ride lots with a total of 1,400 new parking spaces.[23] [24] The most heavily trafficked station is Cavill Avenue, with an average of 4,729 daily passengers in February 2016.[25]
Infrastructure
The system uses standard gauge tracks with overhead catenary. It primarily operates in a centre-running configuration.
Rolling stock
See main article: article and Flexity 2.
The Gold Coast Rapid Transit fleet consists of 23 Bombardier Flexity 2 trams built in Germany.[26] The trams feature low floors and have dedicated spaces for wheelchairs, prams and surfboards.[27] They have a top speed of 70adj=onNaNadj=on and room for 309 passengers with seating for 80.[28] Fourteen trams were ordered to serve the original section of the line. Four additional trams were ordered in November 2015 to service the Helensvale extension.[29] These were delivered in September and October 2017.[30] A further five were delivered from July 2023 entering service in July 2024
Operation
Services are operated by Keolis Downer, a joint venture between Keolis and Downer. Fares are set by Translink with all stations fitted with go card readers.[31] Translink charges fares that increase as passengers travel through eight concentric zones radiating outward from the Brisbane central business district;[32] All G:link stations are located within zone 5.
Service frequencies (in minutes) from 17 December 2017:[33]
| Weekdays | Weekends |
---|
00:00 to 05:00 | | 30† |
05:00 to 07:00 | 15 | 15 |
07:00 to 19:00 | 7.5 | 10 |
19:00 to 23:30 | 15 | 15 | |
† No service between Helensvale station and Gold Coast University Hospital
On Monday to Friday mornings (midnight to 5 am), light rail services are replaced on most of the routes by Kinetic Group route 700. These buses do not service the section between Helensvale station and Gold Coast University Hospital.
Patronage
Over 1.74 million passengers used the Gold Coast Light Rail in its first 100 days after opening. More than five million paid trips were made in the first nine months of operation.[34] 6.6 million passengers were carried on the line in its first year, and total public transport users on the Gold Coast - across buses and trams - increased by 25 per cent.[35] [36] In February 2016 the Queensland Government announced the ten million passenger milestone had been reached and noted that Cavill Avenue was the busiest station with 4,729 boardings a day.[37]
The following table lists patronage figures for the network during the corresponding financial year. Australia's financial years start on 1 July and end on 30 June. Major events that affected the number of journeys made or how patronage is measured are included as notes.
2014–15 2015–16 | 2016–17 | 2017–18 | 2018–19 | 2019–20 | 2020–21 | 2021–22 | 2022–23 |
Patronage (millions) | 6.28 | 7.68 | 7.97 | 9.49 | 10.74 | 8.46 | 6.12 | 6.34 | 10.39 |
---|
Reference | [38] | [39] | [40] | [41] | [42] | [43] | [44] | [45] | [46] |
---|
| |
Objections
The Gold Coast light rail project was championed by Queensland Premier Anna Bligh, but was subject to prolonged and vigorous protest campaigns from what were probably a minority of vocal objectors. Those who attempted to stop Stage One included Gold Coast Mayor Ron Clarke,[50] former mayor and candidate Lex Bell[51] (who proposed the use of native title to stop the project),[52] [53] and a string of short-lived protest organisations.[54] [55] Their claims included that it was a 'zombie' project and 'white elephant' that would saddle ratepayers with unsustainable debt.[56] The removal of iconic palm trees and poincianas for the construction upset others.[57]
The most prominent and influential objector was a retired property analyst, Alan Midwood. As late as 2016, Midwood was still claiming light rail had been a ‘gross financial disaster’ that had doubled roadway congestion, and calling for it to be scrapped.[58] Other notable objectors who achieved media coverage included the owner of Surfers Paradise shop Condom Kingdom, who feared construction would impact his sales,[59] and Surfers Paradise Meter Maids, who vowed to chain themselves to trees to prevent the project going ahead.[60]
One particularly vocal group operated by a Paradise Waters resident, alleged light rail was "a proven killer"[61]
Notes and References
- http://profile.id.com.au/gold-coast/population-estimate Estimated Resident Population
- Web site: Gold Coast Rapid Transit Corridor Study. City of Gold Coast. 6 December 2013. dead. https://web.archive.org/web/20131211212713/http://www.goldcoast.qld.gov.au/rapid-transit-gcrt-corridor-study-6008.html. 11 December 2013. dmy-all.
- Web site: Gold Coast Light Rail Feasibility . Department of Infrastructure & Regional Development . 14 May 2002 . dead . https://web.archive.org/web/20131214045724/http://www.infrastructure.gov.au/department/statements/2002_2003/media/a13_budget_02.aspx . 14 December 2013 . dmy-all . 14 December 2013 .
- Web site: Gold Coast Light Rail Feasibility Study. Parsons Brinckerhoff. 6 December 2013. https://web.archive.org/web/20110220121415/http://www.pb.com.au/gclightrail/GCLR_Report/PDF%27s/Draft_Summary_Report.pdf. 20 February 2011.
- News: Chambers. Geoff. Chinese in Gold Coast's rapid transit mix. Gold Coast Bulletin. 14 February 2010. 6 December 2013. https://web.archive.org/web/20131104160540/http://www.goldcoast.com.au/article/2010/02/14/188475_gold-coast-news.html. 4 November 2013.
- GoldLinQ Selected for Gold Coast Light Rail. 5 May 2011. Plenary Group. 30 March 2022. live. https://web.archive.org/web/20131212181127/http://plenarygroup.com/news-and-media/news-articles-and-press-releases/2011/goldlinq-selected-for-gold-coast-light-rail.html. 12 December 2013. dmy-all.
- GoldlinQ selected to build Gold Coast light rail. Railway Gazette International. 6 May 2011. 6 December 2013. live. https://web.archive.org/web/20131212193029/http://www.railwaygazette.com/news/single-view/view/goldlinq-selected-to-build-gold-coast-light-rail.html. 12 December 2013. dmy-all.
- GoldLinQ wins £657M Australian rail project. New Civil Engineer. 6 December 2013. 9 May 2011. live. https://web.archive.org/web/20131211215205/http://www.nce.co.uk/news/business/goldlinq-wins-657m-australian-rail-project/8614578.article. 11 December 2013. dmy-all.
- News: Stolz. Greg. Vogler. Sarah. Court bid to halt $1.6 billion Gold Coast light rail project. Herald Sun. 8 August 2012. 6 December 2013.
- News: Light rail work starts this month. Gold Coast Bulletin. 4 July 2010. 6 December 2013. https://web.archive.org/web/20120324052100/http://www.goldcoast.com.au/article/2010/07/04/235021_gold-coast-news.html. 24 March 2012 .
- Book: Gold Coast Rapid Transit. June 2011. Queensland Government.
- Web site: First test tram run in Southport . GoldLinQ . 1 October 2013 . 6 December 2013 .
- Web site: Works updates . GoldLinQ . 4 December 2013 .
- http://www.goldcoastbulletin.com.au/news/gold-coast/all-aboard-gold-coast-light-rail-officially-launches-with-full-tram-cars-for-day-of-free-travel/story-fnj94idh-1226994946028 All aboard: Gold Coast light rail officially launches with full tram cars for day of free travel
- News: Chambers. Geoff. Flurry of Coast rapid transit resumptions. Gold Coast Bulletin. 24 December 2009. 6 December 2013. https://web.archive.org/web/20120324052119/http://www.goldcoast.com.au/article/2009/12/24/172831_gold-coast-news.html. 24 March 2012.
- Web site: Gold Coast Light Rail Stage 2. 2016-07-13. www.tmr.qld.gov.au. en-AU. corporateName=Department of Transport and Main Roads; jurisdiction=Queensland; sector=government. 2018-07-05. https://web.archive.org/web/20180319074036/https://www.tmr.qld.gov.au/Projects/Name/G/Gold-Coast-Light-Rail-Stage-2.aspx. 19 March 2018. live. dmy-all.
- https://web.archive.org/web/20200812002702/https://www.railexpress.com.au/preparation-works-gold-coast-light-rail-stage-3a-construction/ Preparation works continue for Gold Coast Light Rail Stage 3A construction
- Web site: 2020-10-06T13:49:00+01:00 . John Holland to build Stage 3 of Gold Coast light rail . 2020-10-24 . Railway Gazette International . en . 22 October 2020 . https://web.archive.org/web/20201022120953/https://www.railwaygazette.com/john-holland-to-build-stage-3-of-gold-coast-light-rail/57516.article . live .
- Book: Gold Coast Light Rail Stage 3A . City of Gold Coast . 2018 . Gold Coast, Australia.
- Web site: Services. corporateName=Planning, Environment & Transport City Transport Web. Light rail. dead. https://web.archive.org/web/20180710164422/http://www.goldcoast.qld.gov.au/rapid-transit-6004.html. 10 July 2018. 2018-07-03. www.goldcoast.qld.gov.au. en-au. dmy-all.
- Web site: Services. corporateName=Planning, Environment & Transport City Transport Web. Gold Coast City Transport Strategy 2031. live. https://web.archive.org/web/20180415100736/http://www.goldcoast.qld.gov.au/gold-coast-city-transport-strategy-8579.html. 15 April 2018. 2018-07-03. www.goldcoast.qld.gov.au. en-au. dmy-all.
- https://web.archive.org/web/20200812003158/https://www.railwaygazette.com/projects-and-planning/gold-coast-light-rail-extension-study-funded/57139.article Gold Coast light rail extension study funded
- News: Gold Coast light rail stage two and Brisbane link unveiled. Brisbane Times. Fairfax Media. Tony. Moore. 7 August 2015. 10 June 2016. live. https://web.archive.org/web/20160917175432/http://www.brisbanetimes.com.au//queensland/gold-coast-light-rail-stage-two-and-brisbane-link-unveiled-20150806-gisy3c.html. 17 September 2016. dmy-all.
- 21 March 2016. Gold Coast light rail Stage 2 contractor selected. Railway Gazette International. 11 June 2016. live. https://web.archive.org/web/20160626020320/http://www.railwaygazette.com/news/urban/single-view/view/gold-coast-light-rail-stage-2-contractor-selected.html. 26 June 2016. dmy-all.
- News: Gold Coast light rail hits 10 million tram passenger mark as tender announcement nears for stage two . . . Kathleen . Skene . 5 February 2016 . 10 June 2016 . live . https://web.archive.org/web/20170213033732/http://www.goldcoastbulletin.com.au/news/gold-coast/gold-coast-light-rail-hits-10-million-tram-passenger-mark-as-tender-announcement-nears-for-stage-two/news-story/040fda714b58dade31c735393ef24f45 . 13 February 2017 . dmy-all .
- Web site: GoldLinQ CEO Phil Mumford inspects construction of first tram in Germany . GoldLinkQ . 14 September 2012 . 6 December 2013 . dead . https://web.archive.org/web/20131211235657/http://www.goldlinq.com.au/project-updates/news/read/goldlinq-ceo-phil-mumford-inspects-construction-of-first-tram-in-germany/5268 . 11 December 2013 . dmy .
- Web site: The tram . GoldLinkQ . 14 November 2013 . 6 December 2013 . dead . https://web.archive.org/web/20131211233645/http://www.goldlinq.com.au/operating-light-rail/trams-and-stations/ . 11 December 2013 . dmy .
- News: Silva. Kristian. Gold Coast trams unveiled. Brisbane Times. 20 September 2013. 6 December 2013. live. https://web.archive.org/web/20131226211157/http://www.brisbanetimes.com.au/queensland/gold-coast-trams-unveiled-20130920-2u409.html. 26 December 2013. dmy-all.
- Web site: Record of Proceedings (proof) First Session of the Fifty-fifth Parliament Thursday, 12 November 2015. 12 November 2015. Queensland Parliament. 2826. https://web.archive.org/web/20170913231202/http://www.parliament.qld.gov.au/documents/hansard/2015/2015_11_12_WEEKLY.pdf. 13 September 2017. live. 14 September 2017.
- https://www.railexpress.com.au/new-trams-arrive-for-gold-coast-light-rail/ New trams arrive for Gold Coast light rail
- Web site: Gold Coast Light Rail Fare Cost . 16 September 2013 . Gold Coast Light Rail . 16 July 2014 . live . https://web.archive.org/web/20140713211028/http://www.goldcoastlightrail.com.au/gold-coast-light-rail-fare-cost/ . 13 July 2014 . dmy-all .
- Web site: Zones . . . 2016 . 11 June 2016 . live . https://web.archive.org/web/20160601120024/http://translink.com.au/tickets-and-fares/fares-and-zones/zones . 1 June 2016 . dmy-all .
- Web site: Gold Coast Light Rail Stage 2 - Opening 17 December. Translink. Queensland Government. https://web.archive.org/web/20180412075117/https://translink.com.au/about-translink/projects-and-initiatives/gold-coast-light-rail-stage-2. 12 April 2018. live. 17 December 2017. dmy-all.
- News: Five million people jump on board Gold Coast Light Rail since July 2014. Tony Moore. 7 May 2015. 6 May 2015. brisbane times. Fairfax Media. live. https://web.archive.org/web/20150512002934/http://www.brisbanetimes.com.au/queensland/five-million-people-jump-on-board-gold-coast-light-rail-since-july-2014-20150506-ggviij.html. 12 May 2015. dmy-all.
- Web site: Short list named for Gold Coast light rail Stage 2. GoldLinQ. 9 November 2015. 1 October 2015. live. https://web.archive.org/web/20160209103628/http://www.goldlinq.com.au/news-and-media/short-list-named-for-gold-coast-light-rail-stage-2. 9 February 2016. dmy-all.
- Web site: Key statistics. gclrstage2.com. Goldlinq. 5 March 2016. dead. https://web.archive.org/web/20160525222140/http://www.gclrstage2.com/about. 25 May 2016. dmy-all.
- News: Skene. Kathleen. Gold Coast light rail hits 10 million tram passenger mark as tender announcement nears for stage two. Gold Coast Bulletin. 6 February 2016.
- Web site: TMR Annual Report 2014-15 Appendix 2 – Performance statements 2014-15 . Department of Transport and Main Roads . https://web.archive.org/web/20161215111656/http://www.tmr.qld.gov.au/About-us/Corporate-information/Publications/Annual-report/Annual-Report-2014-2015/Appendices/Appendix-2-Performance-statements-2014-15 . 15 December 2016 . dead . 12 October 2016.
- Web site: TMR Annual Report – Appendix 2 – Performance statements 2015–16. Department of Transport and Main Roads. 12 October 2016. 255. live. https://web.archive.org/web/20161201151645/https://publications.qld.gov.au/dataset/2aa1d450-da8b-4432-9125-c8a775a973fb/resource/7bbec4a7-2eca-490b-868b-335cee43a961/download/annual-report-2015-16-appendices.pdf. 1 December 2016. dmy-all.
- Web site: Department of Transport and Main Roads Annual Report 2016–17. Department of Transport and Main Roads. 13 November 2017. 221. live. https://web.archive.org/web/20171202203110/https://publications.qld.gov.au/dataset/15d6df9b-247f-4b15-b7e3-8126fd9444a5/resource/fc9750cb-3420-42e2-bbc5-ecccecbcf3d7/download/tmr-annual-report-2017-appendices.pdf. 2 December 2017. dmy-all.
- Web site: Department of Transport and Main Roads Annual Report 2017–18 - Appendix 2 – Performance Statements 2017–18 . Department of Transport and Main Roads . 3 October 2018 . 242 . 6 February 2023 . https://web.archive.org/web/20230206081202/https://www.publications.qld.gov.au/ckan-publications-attachments-prod/resources/149a8687-a98b-4123-ba72-618bf60ab2a7/appendices-tmr-annual-report-2017-18.pdf?ETag=856bba95772a1be801a15e0d11c2e360 . live .
- Web site: Department of Transport and Main Roads Annual Report 2018–19 - Appendices – Annual Report 2018–19 . Department of Transport and Main Roads . 23 October 2019 . 285 . 28 March 2020 . https://web.archive.org/web/20200328031137/https://www.publications.qld.gov.au/dataset/d9a277e6-e91d-4368-a6e8-2b9856820aaa/resource/cceba6ec-684c-40b2-a7cf-62b4d0e51010/fs_download/appendices-tmr-2018-19-annual-report-9.pdf . live .
- Web site: Department of Transport and Main Roads Annual Report 2019–20 - Appendices – Annual Report 2019–20 . Department of Transport and Main Roads . 18 December 2020 . 186.
- Web site: Department of Transport and Main Roads Annual Report 2020–21 - Appendices – Annual Report 2020–21 . Department of Transport and Main Roads . 27 December 2021 . 175.
- Web site: Department of Transport and Main Roads Annual Report 2021–22 - Appendices – Annual Report 2021–22 . Department of Transport and Main Roads . 22 December 2022 . 206.
- Web site: Department of Transport and Main Roads Annual Report 2022–23 - Appendices – Annual Report 2022–23 . Department of Transport and Main Roads . 14 December 2023 . 218.
- Web site: Adopted Report of the Transport and Infrastructure Committee Meeting . City of Gold Coast Council Chambers . 20 March 2020 . 49 . 28 March 2020 . https://web.archive.org/web/20200328124055/https://www.goldcoast.qld.gov.au/documents/ma/transportandinfrastructure-20191114-adoptedreport.pdf . live .
- Web site: Department of Transport and Main Roads Annual Report 2018–19 - Appendices – Annual Report 2018–19 . Department of Transport and Main Roads . 23 October 2019 . 285 . 28 March 2020 . https://web.archive.org/web/20200328031137/https://www.publications.qld.gov.au/dataset/d9a277e6-e91d-4368-a6e8-2b9856820aaa/resource/cceba6ec-684c-40b2-a7cf-62b4d0e51010/fs_download/appendices-tmr-2018-19-annual-report-9.pdf . live .
- Web site: Cross River Rail to deliver three new stations on the booming Gold Coast line . Cross River Rail Delivery Authority - Queensland Government . 17 January 2020 . 27 February 2020 . https://web.archive.org/web/20200227114343/https://crossriverrail.qld.gov.au/news/cross-river-rail-to-deliver-three-new-stations-on-the-booming-gold-coast-line/ . live .
- 'Public Meeting De-Rails Light Rail', Gold Coast Public Transport Alliance (GCPTA), 25 February 2008; https://web.archive.org/web/20120223061011/http://www.stoplightrail.com/news.html#campaign090811
- Paul Weston; Shannon Willoughby, 'Protesters could cost Coast $3 billion', Gold Coast Bulletin, 10 February 2012; http://www.goldcoast.com.au/article/2012/02/10/389495_city-council-election.html
- Light-rail haters resort to native title, Gold Coast Bulletin, 14 April 2012; http://www.goldcoast.com.au/article/2012/04/14/407785_city-council-election.html
- https://web.archive.org/web/20130502155030/http://www.raragc.com.au/?page_id=153
- Light-rail haters resort to native title, Gold Coast Bulletin, 14 April 2012; http://www.goldcoast.com.au/article/2012/04/14/407785_city-council-election.html
- https://web.archive.org/web/20130502155030/http://www.raragc.com.au/?page_id=153
- Gold Coast Bulletin, 11 April 2012; https://www.goldcoastbulletin.com.au/article/2012/04/11/406861_city-council-election.html
- Gold Coast Bulletin, 9 February 2012; http://www.goldcoast.com.au/article/2012/02/09/389225_gold-coast-news.html
- Denis Doherty, 'A prominent Gold Coast businessman has called for light rail extensions to stop', Gold Coast Bulletin, 10 February 2016; https://www.goldcoastbulletin.com.au/news/gold-coast/a-prominent-gold-coast-businessman-has-called-for-light-rail-extensions-to-stop/news-story/b8c51a6eca1c5bc49156d70acfdb3539
- Gold Coast Bulletin, 12 June 2012; http://www.goldcoast.com.au/article/2012/06/12/423791_gold-coast-news.html
- Gold Coast Bulletin, 9 February 2012; http://www.goldcoast.com.au/article/2012/02/09/389225_gold-coast-news.html
- Gold Coast Public Transport Alliance advertisement, Gold Coast Bulletin, 21March 2012
- Tony Moore, 'Gold Coast City Council votes against light rail stop at Paradise Waters', Brisbane Times, 31 January 2017, https://www.brisbanetimes.com.au/national/queensland/gold-coast-light-rail-too-popular-for-new-stops-20170131-gu26db.html
- New Advertising Campaign Launched, 11 August 2009; [''Gold Coast Public Transport Alliance (GCPTA)'', 25 February 2008; [https://web.archive.org/web/20120223061011/http://www.stoplightrail.com/news.html#campaign090811] that slaughtered at "a rate 2.5 times that of cars".[61] Following the success of the project, in 2017 a group of Paradise Waters residents appealed for a tram stop to be added at their locality, as had been originally planned, but were denied it by Council. A former mayor suggested there was a feeling they "were punished because some of them opposed it at the time."[62]
External links