Going-to-the-Sun Road explained

Going-to-the-Sun Road
Nrhp Type:nhl
Location:Glacier National Park, Flathead and Glacier counties, Montana, U.S.
Nearest City:West Glacier, Montana
Locmap Relief:1
Map Width:240
Coordinates:48.695°N -113.817°W
Built:1921–1932; dedicated 1933
Architect:National Park Service; Bureau of Public Roads
Designated Nrhp Type:February 18, 1997[1]
Added:June 16, 1983
Refnum:83001070

Going-to-the-Sun Road is a scenic mountain road in the Rocky Mountains of the western United States, in Glacier National Park in Montana. The Sun Road, as it is sometimes abbreviated in National Park Service documents, is the only road that traverses the park, crossing the Continental Divide through Logan Pass at an elevation of 6,646 feet (2,026 m), which is the highest point on the road. Construction began in 1921 and was completed in 1932 with formal dedication in the following summer on July 15, 1933.[2] [3] Prior to the construction of the road, visitors would need to spend several days traveling through the central part of the park, an area which can now be traversed within a few hours, excluding any stops for sightseeing or construction.

The road is the first to have been registered in all of the following categories: National Historic Place,[4] National Historic Landmark[1] and Historic Civil Engineering Landmark.[5] The road is approximately 50 miles (80 km) long and spans the width of the park between the east and west entrance stations. The National Historic Landmark Nomination records a slightly shorter distance of 48.7 miles which is measured from the first main intersection just outside the park's west entrance to Divide Creek in St. Mary, Montana on the east side of the park.

Name

The road is named after Going-to-the-Sun Mountain which dominates the eastbound view beyond Logan Pass. One Native American legend concerns the deity Sour Spirit who came down from the sun to teach the Blackfeet the basics of hunting. While returning to the sun, an image of Sour Spirit was placed on the mountain as an inspiration for the Blackfeet. Another story has suggested that a late-19th-century Euro-American explorer provided the mountain's name and the legend.[6]

Design

Going-to-the-Sun Road, also known as Glacier Route 1 Road, is notable as one of the first National Park Service projects specifically intended to accommodate the automobile-borne tourist. The road was first conceived by superintendent George Goodwin in 1917, who became the chief engineer of the Park Service the following year.[7] As chief engineer, the new road became Goodwin's primary project, and construction began in 1921.

As the project proceeded, Goodwin lost influence with National Park Service director Stephen Mather, who favored landscape architect Thomas Chalmers Vint's alternative routing of the upper portion of the road along the Garden Wall escarpment. Vint's alignment reduced both switchbacks and the road's visual impact, at increased cost.[8] With Goodwin's resignation, Vint's proposal became the preferred alignment. The entire project was finally opened from end to end in 1933, at a cost of $2.5 million.[9]

The western terminus of the road is at U.S. Route 2 in West Glacier, Montana. The eastern terminus is at U.S. Route 89 in St. Mary.

The two-lane Going-to-the-Sun Road is quite narrow and winding, with hairpin turns, especially west of Logan Pass. Consequently, vehicle lengths over the highest portions of the roadway are limited to no longer than 21feet and no wider than 8feet between Avalanche Creek and Rising Sun picnic areas which are located many miles below Logan Pass, on the west and east sides of the pass, respectively. Vehicles over 10feet in height may not have sufficient clearance due to rock overhangs when driving west between Logan Pass and the hairpin turn called the Loop. The speed limits are 45mph in the lower elevations and 25mph in the steeper and winding alpine sections.

Repairs

The road is one of the most difficult roads in North America to snowplow in the spring. Up to 80feet of snow can lie on top of Logan Pass, and more just east of the pass where the deepest snowfield has long been referred to as the Big Drift. The road takes about ten weeks to plow, even with equipment that can move 4,000 tons of snow in an hour. The snowplow crew can clear as little as of the road per day. On the east side of the Continental Divide, there are few guardrails due to heavy snows and the resultant late-winter avalanches that have destroyed protective barriers. The road is generally open from early June to mid October, with its latest opening on July 13, 2022, marking the record for the latest opening since the inaugural date of July 15, 1933.

A restoration project by the National Park Service and the Federal Highway Administration has been repairing road damage from many avalanches and rock slides over the years.[10] The repairs, which started in the 1980s and continue to the present day when weather permits, include fixing retaining walls, replacing the original pavement with reinforced concrete, and work on tunnels, bridges, culverts and overlooks.[11]

Buses

A fleet of vintage 1930s red buses, modernized in 2001 and called Red Jammers, or simply "Reds", continue the tradition of offering guided tours along the road.[12] The original bus drivers became affectionately known as "Gear Jammers" or simply "Jammers" since they had to jam the manual gearbox into low to safely negotiate the steepest road sections.[12] Thirty-three of the original buses were rebuilt with flexible-fuel engines which operate mainly on propane but can use gasoline, and with automatic transmissions, making the Jammer name archaic.[13] [14] Modern-style shuttle buses for shorter trips and Blackfeet tour buses operate on the road as well.[15]

References in popular culture

Going-to-the-Sun Road is shown in the opening credits of the 1980 film The Shining, as aerial flybys of Wild Goose Island and the protagonist's car traveling along the north shore of Saint Mary Lake, through the East Side tunnel and onward, going to a mountain resort hotel for his job interview as a winter caretaker.[16] The road is also featured at night at the climax of the sequel adaptation, Doctor Sleep, when Danny Torrance returns to the Overlook Hotel with Abra to confront the antagonist Rose The Hat.

The road is also seen briefly in the 1994 film Forrest Gump. As Forrest reminisces with Jenny he remembers running across the U.S. and remarks, "Like that mountain lake. It was so clear, Jenny. It looked like there were two skies, one on top of the other." The shots in the background are Going-to-the-Sun Road and Saint Mary Lake.[17]

The road is the subject of the song "Going-to-the-Sun Road" by Fleet Foxes, featured on their 2020 album Shore.

See also

Major points of interest along the road from west-to-east include:

References

Book: Carr , Ethan . Wilderness by Design: Landscape Architecture & the National Park Service . University of Nebraska Press . 1998 . registration . 0-8032-6383-X.

Further reading

External links

Notes and References

  1. Web site: Going-to-the-Sun Road . https://web.archive.org/web/20160109095456/http://focus.nps.gov/nrhp/AssetDetail?assetID=92462260-0dcd-495e-8f70-ff31672c25da . January 9, 2016 . January 9, 2016 . National Historic Landmark summary listing . National Park Service.
  2. News: Scott. Tristan. Glacier's Going-to-the-Sun Road to open July 13, 2nd latest ever. https://web.archive.org/web/20120426204340/http://missoulian.com/news/state-and-regional/article_a91704e2-a909-11e0-ae30-001cc4c03286.html. April 26, 2012. January 9, 2016. Missoulian. April 7, 2011.
  3. News: Session due on Sun Road improvement . Spokesman-Review . July 18, 1967 . 6 .
  4. Web site: National Register of Historic Places Inventory - Nomination Form. June 16, 1983. https://web.archive.org/web/20160109095727/http://focus.nps.gov/AssetDetail/NRIS/83001070. January 9, 2016. National Park Service. January 9, 2016.
  5. Web site: Top 10 Things...#2. January 9, 2016. National Park Service. January 9, 2016.
  6. Web site: Going-to-the-Sun Road FAQs . October 19, 2009 . National Park Service . May 11, 2010 . dead . https://web.archive.org/web/20100528161758/http://www.nps.gov/glac/planyourvisit/gttsrfaq.htm . May 28, 2010 .
  7. Carr, p. 160.
  8. Carr, p. 171.
  9. Carr, p. 186.
  10. Web site: Going-to-the-Sun Road Project. Federal Highway Administration. October 16, 2015. https://web.archive.org/web/20151027075240/http://flh.fhwa.dot.gov/projects/mt/gtsr/. October 27, 2015. live. January 9, 2016.
  11. Web site: Top 10 Things...#3-7. January 9, 2016. National Park Service. January 9, 2016.
  12. Web site: On the Road Again: Glacier National Park's Red Buses . National Park Service . https://web.archive.org/web/20130217084749/http://crm.cr.nps.gov/archive/25-05/25-05-06.pdf . February 17, 2013 . dead . October 4, 2016 .
  13. News: Classic jammers slowly returning to Glacier . Spokesman-Review . Spokane, Washington . Wille . Chris . May 5, 2002 . H4 .
  14. News: Parks take steps to clean air . Sunday Star-News . Wilmington, North Carolina . New York Times News Service . Siano . Joseph . September 1, 2002 . 9D .
  15. Web site: Plan Your Visit-Getting Around. January 9, 2016. National Park Service. January 9, 2016.
  16. Web site: The Shining (1980) - IMDb.
  17. Web site: Montanakids | Forrest Gump.