Gloucester station (MBTA) explained

Style:MBTA
Gloucester
Address:75 Railroad Avenue
Coordinates:42.6168°N -70.6683°W
Other: CATA:
Tracks:1
Parking:100 spaces ($4.00 fee)
Bicycle:5 spaces
Passengers:296 (weekday average boardings)
Pass Year:2018
Opened:December 1847
Rebuilt:September 2005
Accessible:Yes
Zone:7
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail
Zoom:12

Gloucester station is an MBTA Commuter Rail station in Gloucester, Massachusetts. Located off Railroad Avenue and Washington Street in downtown Gloucester, it serves the Rockport branch of the Newburyport/Rockport Line. The station consists of a single side platform serving the line's single track. The station has a mini-high platform, making it accessible.

History

Eastern Railroad and B&M

The Eastern Railroad built their Gloucester Branch in 1847, reaching Gloucester on December 1.[1] The station was located in downtown Gloucester, at the intersection of Railroad and Maplewood Avenues. Gloucester was the end of the line until November 4, 1861, when the Rockport Railroad extended the branch to Rockport station. Due to the new curve heading to Rockport, a new station was built to the west near Washington Street. The old depot, now on a short spur, was still used for freight service for several decades to come.[2]

Initially, Rockport trains were operated by the Eastern Railroad and met Eastern mainline trains at Beverly. In 1864, trains began to be through-routed to Boston to increase frequencies on the inner part of the trunk line.[3] The Eastern Railroad bought the Rockport Railroad in 1868, but the branch is still known as the Gloucester Branch. By the 1870s, regular commuter service was available. The Eastern was leased by the Boston and Maine Railroad in 1885 and merged into it in 1890. In 1911, the branch was doubled-tracked to Gloucester. (Today, the double track ends west of the station). Commuter service continued in the same fashion for decades, with 13 inbound round trips in 1906, 14 trips in 1950, and 11 trips in 1962.

MBTA era

Gloucester has seen nearly continuous service to Boston since 1848. When the newly formed MBTA began funding commuter rail service in 1965, communities outside the funding district were left to pay for trains to continue stopping. Gloucester and neighboring Rockport initially declined to subsidize service. Service past Manchester was discontinued on January 28, 1965, along with the outer sections of the Fitchburg Line and Central Mass Branch. The MBTA rushed to reach subsidy agreements with out-of-district towns, and after negotiations service was to resume on June 6. After a lawsuit in which the Eastern Massachusetts Street Railway challenged the right of the MBTA to provide out-of-district service, Rockport service resumed on June 28, 1965.[4]

The MBTA bought most B&M commuter assets, including the Gloucester Branch, on December 27, 1976. The station building was gone by that time, with a gas station in its place.[5] On January 20, 1984, the North Station approach trestles were destroyed by a fire. Gloucester Branch trains were terminated at a temporary station near Sullivan or bussed from Lynn. On November 16, 1984, the Beverly Draw bridge connecting Salem to Beverly burned, cutting the Rockport Branch and the Ipswich Line from the rest of the system. (All lines running north and west of Newburyport were abandoned by 1984, leaving no route to move equipment to the rest of the northside.) A shuttle train was run from Rockport to Beverly Depot until January 7, 1985, when it was replaced by bus service. The locomotives used were then trucked to Danvers so they could be repaired at the MBTA's main maintenance facility. A new bridge opened on December 1, 1985, reconnecting Gloucester to the larger system.

On June 3, 2004, the MBTA board approved a renovation of the station, including new parking spaces, lighting, and signage, as well as a "mini-high" platform for handicapped accessibility.[6] The $3.4 million rebuilt station was opened in September 2005.[7]

On April 29, 2020, service between West Gloucester and Rockport was indefinitely replaced by buses due to a failure of the old bridge.[8] That June, the MBTA indicated the closure would continue until the completion of the bridge replacement.[9] Regular service to Rockport over the bridge resumed on May 23, 2022.[10]

External links

Notes and References

  1. Book: The Rail Lines of Southern New England . Karr, Ronald Dale . Branch Line Press . 1995 . 0942147022 . 264–65.
  2. Web site: Gloucester . 1891 . Topographical Atlas of Massachusetts . Walker Lithograph & Publishing Co. . Ward Maps.
  3. Book: Boston's Commuter Rail: The First 150 Years . Humphrey, Thomas J. . Clark, Norton D. . Boston Street Railway Association . 1985 . 9780685412947 . 75–77.
  4. Book: Boston's Commuter Rail: Second Section . Humphrey, Thomas J. . Clark, Norton D. . Boston Street Railway Association . 1986 . 9780938315025 . 10.
  5. News: There's no depot like an old depot . Alan P. . Henry . Boston Globe . August 10, 1977 . 3 . Newspapers.com.
  6. Web site: https://web.archive.org/web/20101116081320/http://bostonmpo.org/bostonmpo/4_resources/2_transreport/archive/trpt0704.pdf . 16 November 2010 . MBTA Board Approves Improvements for Gloucester and Walpole Stations . TRANSreport . July 2004 . Boston Metropolitan Planning Organization.
  7. Web site: Upgrades at Gloucester Commuter Rail Station . TRANSreport . October 2005 . Boston Metropolitan Planning Organization . 29 December 2012 . https://web.archive.org/web/20110116153523/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt1005.pdf . 16 January 2011.
  8. Web site: https://web.archive.org/web/20200501214142/https://www.mbta.com/diversions/rockport-line . May 1, 2020 . Rockport Line Service Changes . Massachusetts Bay Transportation Authority . April 29, 2020.
  9. Newburyport/Rockport Trains between Rockport and West Gloucester Replaced with Shuttle Buses through Summer 2021 . June 9, 2020 . Massachusetts Bay Transportation Authority.
  10. MBTA Commuter Rail Spring/Summer Schedule to Take Effect May 23 . May 10, 2022 . Keolis Commuter Services . May 10, 2022 . May 13, 2022 . https://web.archive.org/web/20220513000252/https://www.keoliscs.com/news/mbta-commuter-rail-spring-summer-schedule-to-take-effect-may-23/ . dead .