The Georgia Avenue–7th Street Line, designated as Route 70, is a daily bus route that is operated by the Washington Metropolitan Area Transit Authority between Silver Spring station of the Red Line of the Washington Metro and Archives station of the Green and Yellow lines of the Washington Metro. With late night and early morning trips extending to L'Enfant Plaza station of the Blue, Orange, Silver, Green and Yellow Lines of the Washington Metro. The line operates every 12 minutes during the weekdays, 15 minutes during the weekends, and 20 minutes during the late nights. Trips are roughly 60 minutes.
Route 70 operates between Silver Spring station and Archives station with late night and early morning trips extending to L'Enfant Plaza station providing service along the Georgia Avenue and 7th street corridor.[2] The line is one of the most heavily used routes, ranking 2nd in ridership as of 2023, and combined with its limited-stop counterpart, the 79, make up the busiest transit corridor in the system.[3] It is also one of the few Metrobus routes with dedicated bus lanes.[4] The line is one of the most recognized and popular bus routes.[5]
Route 70 currently operates 24 hours a day out of Montgomery division. It is one of the few routes to use articulated buses on its route due to high passenger volume.[6]
See also: Capital Traction Company. Route 70 originally operated under both the Georgia Avenue Line and 7th Street Line. The Georgia Avenue portion was created in 1862 and originally operated by streetcars by the Washington Railway & Electric Company alongside routes 72 and 74.[7] Route 70 operated between Archives and Silver Spring, route 72 operated between Takoma and Downtown DC along Georgia Avenue, and route 74 operated between Soldiers Home in Northwest and Fort McNair.
On October 18, 1888, the day after the Eckington and Soldiers' Home Railway began operation, Congress authorized the Brightwood Railway to electrify the Metropolitan's streetcar line on Seventh Street Extended NW or Brightwood Avenue NW (now known as Georgia Avenue NW) and to extend it to the District boundary at Silver Spring. In 1890 they bought the former Boundary and Silver Spring line from the Metropolitan, but continued to operate it as a horse line. In 1892 it was ordered by Congress to switch to overhead electrical power and complete the line.[8] [9] The next year, the streetcar tracks reached Takoma Park via a spur along Butternut Street NW to 4th Street NW.[10] In 1898, the Brightwood was ordered to switch to underground electric power on pain of having its charter revoked.[11]
Route 70 was later electrified in 1890, followed by route 72 in 1892, and route 74 in 1893.[7]
The 7th Street section was operated by the Capital Traction Company when it was created in 1873. It originally operated between Archives and Half and O Street in Southwest DC. That line was electrified in 1898.[7]
When the Capital Traction Company and the Washington Railway & Electric Company merged, forming the Capital Transit Company in 1933, the Georgia Avenue and 7th Street Lines were merged into one route operated under route 70 between Silver Spring and Half and O Streets.[7] Routes 72 and 74 were not affected by the changes.
In 1956, DC Transit acquired the Capital Transit Company and routes 70, 72, and 74 were acquired by them. This also meant the end of streetcars beginning in 1958. Routes 70, 72 and 74 were converted into buses on January 3, 1960, when the Southern Division (Maine Avenue) Car Barn was closed.[12]
Routes 70, 72, and 74 were later acquired by WMATA to run under Metrobus when DC Transit was acquired by WMATA on January 4, 1973.[7] [13]
Following the changes, route 72 was discontinued and replaced by routes 50, 52, and 54 while 74 was also discontinued and replaced by route 60.[7] A new route 71 was later introduced to operate alongside the 70 during the weekday peak hours between Silver Spring and Buzzard Point via the 70's routing except operating along 2nd Street, V Street, 1st Street, and T street. A new route 73 was also introduced as the Brightwood-Petworth Line to operate alongside the 70 and 71.
In 1978, route 70 was rerouted to serve the newly opened Silver Spring station connecting riders to the Red Line.
On June 25, 2000, route 73 was eliminated and replaced by routes 70 and 71 as route 73 overlapped both routes.[14]
In 2010, WMATA proposed to shorten routes 70 and 71 to Archives station in order to improve reliability and improve on time performance. All route 70 and 71 service past Archives station to Half and O streets and Buzzard Point would be eliminated. Route P6 would be rerouted from M Street SW via Delaware Avenue, Canal Street, P Street, and 4th Street back to M Street to replace Route 70 and via Delaware Avenue, Canal Street, 2nd Street, V Street, Half Street, S Street, 1st Street, P Street, and 4th Street back to M Street to replace route 71.[15]
A year later, WMATA proposed to end route 70 at Archives station and eliminate all route 71 service. The length of these routes, and the congested traffic conditions under which they operate, are subject them to delays, bunching, and overall poor reliability according to WMATA. Service past Archives station to Half and O streets would be replaced by a new route 74 which will operate on weekdays between Chinatown and Buzzard Point during the weekday peak-hours and between Chinatown and Fort McNair during the off-peak hours. During the weekday evenings and all day weekends, route V8 would be extended to Gallery Place station via Fort McNair.
At the time of the proposals, route 70 operated daily between Silver Spring station and Half and O Street with late night trips ending at Archives station while route 71 only operated during the weekday peak hours while serving Buzzard Point.[16]
On September 25, 2011, route 71 was discontinued and all route 70 trips were shortened to Archives station terminating along Constitution Avenue. Service past Constitution Avenue to Half and O Street/Buzzard Point was discontinued on route 70 with a new route 74 operating between Walter E. Washington Convention Center and Half and O Street while running the Buzzard Point loop during the weekday peak hours.[17] [18] The new 74 replaced the 70 and 71 to Half and O Street while also replacing the DC Circulator Convention Center-Southwest Waterfront route.[19] [20]
When the Paul S. Sarbanes Transit Center at Silver Spring station opened, route 70 was rerouted from its terminus along Wayne Avenue to the new transit center. Route 70 were assigned to Bus Bay 220 on level 2.[21] [22]
During the COVID-19 pandemic, the line was reduced to operate on its Saturday supplemental schedule during the weekdays beginning on March 16, 2020.[23] On March 18, 2020, the line was further reduced to operate on its Sunday schedule.[24] On March 21, 2020, weekend service was reduced to operate every 30 minutes.[25] Service was restored to its full service on August 23, 2020.[26]
On May 29, 2022, all late night route 70 service was extended to terminate at L'Enfant Plaza station.[27]