Geehi Dam | |
Location Map: | New South Wales |
Location Map Caption: | Location of Geehi Dam in New South Wales |
Coordinates: | -36.3047°N 148.3155°W |
Country: | Australia |
Location: | Snowy Mountains, New South Wales |
Status: | O |
Opening: | 1966 |
Owner: | Snowy Hydro |
Dam Type: | E |
Dam Crosses: | Geehi River |
Spillway Count: | 1 |
Spillway Type: | Uncontrolled bell-mouth spillway |
Res Name: | Geehi Reservoir |
Plant Operator: | Snowy Hydro |
Plant Commission: | 1967 |
Plant Type: | C |
Plant Turbines: | 10 |
Geehi Dam is a major ungated rockfill embankment dam across the Geehi River in the Snowy Mountains of New South Wales, Australia. The reservoir impounded by the dam is known as Geehi Reservoir.
The structure was completed by Thiess Brothers in 1966,[1] and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 that is now run by Snowy Hydro.
The dam is located within what is now the Snowy Valleys local government area. It was constructed by Thiess Brothers based on engineering plans developed under contract by the Snowy Mountains Hydroelectric Authority.
The dam wall, comprising of rockfill with an earth core, is high and long. At 100% capacity the dam wall holds back 21093m2 of water. The surface area of Geehi Reservoir is and the catchment area is . The uncontrolled bell-mouth spillway has a diameter of and is capable of discharging up to .[2] [3]
Geehi Reservoir receives water from Island Bend Pondage through the Snowy-Geehi tunnel. Water from Geehi Reservoir is carried via the Murray 1 pressure tunnel to the Murray 1 power station, which is rated for a hydraulic head of and has a total generating capacity of (a net generation of per annum).[4] The outlet structure for the Snowy-Geehi tunnel is shared with the intake of the Murray 1 pressure tunnel and is accessible by a suspended footbridge.