GWR 4073 Class explained

GWR 4073 Castle class
Powertype:Steam
Designer:Charles Collett
Builder:GWR / BR Swindon Works
Builddate:1923–1950
Ordernumber:Lots 224, 232, 234, 280, 295, 296, 303, 310, 317, 324, 357, 367, 375
Totalproduction:171
Uicclass:2′C h4
Leadingdiameter:3feet
Driverdiameter:6feet
Minimumcurve:8chain normal,
7chain slow
Length:65feet over buffers
Width:8feet
Height:13feet
Axleload:
19LT full
Weightondrivers:
58LT full
Locoweight:
79LT full
Tenderweight:
47LT full
Fueltype:Coal
Watercap:Churchward tender:
Boilerpressure:2252NaN2
Firearea:29.36square feet
Boiler:GWR Standard No. 8
Cylindercount:Four (two inside, two outside)
Cylindersize:16x
Valvetype:Piston valves
Tractiveeffort:31625lbf
Fleetnumbers:4073–4099; 5000–5099; 7000–7037.
Axleloadclass:GWR: Red
Locale:Great Western Main Line
Withdrawndate:May 1950 to December 1965
Disposition:Eight preserved, remainder scrapped

The 4073 or Castle Class are 4-6-0 steam locomotives of the Great Western Railway, built between 1923 and 1950. They were designed by the railway's Chief Mechanical Engineer, Charles Collett, for working the company's express passenger trains. They could reach speeds of up to .

Background

The origins of this highly successful design date back to the Star Class of 1907 which introduced the basic 4-cylinder 4-6-0 layout with long-travel valves and Belpaire firebox that was to become characteristic of Great Western Railway (GWR) express passenger locomotives. The Star class was designed to take the top express trains on the GWR, with 61 in service by 1914, but after World War I there was a need for an improved design. To meet this need, Chief Mechanical Engineer George Churchward had in mind an enlarged Star class design with a standard No.7 boiler, as fitted to his GWR 4700 Class express freight 2-8-0. However, this combination would have taken the axle load over the 20-ton limit then set by the civil engineers, and in the end, nothing came of the idea.

Design

Charles Collett succeeded Churchward as Chief Mechanical Engineer of the GWR in 1922 and immediately set about meeting the need for a new locomotive design that would both supplement the Stars and replace them on the heaviest expresses. Collett's solution was to take the basic layout of the Star with an extended frame, and add a newly designed No.8 boiler which was both larger and lighter. The increased amount of steam that this produced allowing an increase in the cylinder diameter from 15x to 16x. The extended frame allowed for a side window cab and an increased grate area. The result was an increase in tractive effort to 31,625 lb, and a locomotive that looked attractive and well proportioned while remaining within the 20-ton axle limit.

Production

Unlike the Star class, there was no prototype. Collett was sufficiently confident of the design to place an order with Swindon Works (Lot 224) for ten locomotives in 1923, although there was a four-month delay between the appearance of the first example in August 1923 and the second in December, to allow for the correction of any teething problems. Thereafter the remaining eight locomotives came out at regular intervals until April 1924. They were 4073–4082, the number series continuing unbroken from the Star class. The last 12 Star class locomotives, which were built in 1922–23, had been given names of abbeys in the western area served by the GWR. The new locomotives were named after castles, also in the west, beginning with Caerphilly Castle.

Over the twenty-seven years from August 1923 to August 1950, 155 Castles were built new at Swindon Works and a further sixteen were converted from other classes. In February 1952, two engines, 4082 Windsor Castle and 7013 Bristol Castle, swapped names and numbers: 7013 was disguised as 4082 to run George VI's funeral train and the numbers were never swapped back. 4082 was withdrawn from service in 1964 as 7013 and 7013 was withdrawn from service as 4082 in 1965.

New builds

The new-builds were as follows.

Great Western Railway

British Railways (Western Region)

These locomotives were built with minimal changes to the dimensions. However, from 5013 Abergavenny Castle there was an alteration to the shape of the front-end casing over the inside cylinders, and from 5043 Earl of Mount Edgcumbe a shorter chimney was fitted. Those built before 1926 were fitted with a 3500impgal tender but thereafter 4000impgal became standard for the class.

Rebuilds

Between January and September 1924, the only Great Western 4-6-2, No.111 The Great Bear, was rebuilt into a member of the Castle Class, although only the "front portion of the original frames and the number plates were used again but probably little else". The new locomotive was renamed Viscount Churchill and survived until withdrawal in July 1953.

In April 1925, Star class No. 4009 Shooting Star was likewise rebuilt as a Castle by extending the frames and fitting a new Castle Class boiler and cab. It was renumbered and renamed 100 A1 Lloyds and was withdrawn in 1950.

In October 1925 a second Star class, No. 4016 The Somerset Light Infantry (Prince Albert's), was similarly converted to a Castle although in this case, it retained its name and number. Two further conversions of Stars were undertaken in 1926; Nos. 4032 Queen Alexandra and 4037 The South Wales Borderers retaining their names and numbers and surviving until 1951 and 1962 respectively.

In November 1929 the prototype for the Star Class, No. 4000 North Star was rebuilt into a Castle, being subsequently withdrawn in 1957.

Between 1937 and 1940 a further ten members of the 'Abbey series' of the Star class (Nos. 4063–4072) were rebuilt as Castles on Lot 317. They were allocated new numbers 5083 to 5092 but retained their original names and were withdrawn between 1958 and 1964.

Publicity and trials

When introduced they were heralded as Britain's most powerful express passenger locomotive, being some 10% more powerful than the Stars. The first, No. 4073 Caerphilly Castle, made its debut at Paddington station on 23 August 1923. The choice of 4082 as Windsor Castle proved fortuitous as this locomotive was used to haul the Royal Train when King George V and Queen Mary visited Swindon Works in 1924, and much publicity was gained when the king was invited to drive the engine back from the works to the station before the return journey, with the Queen and several high-ranking GWR officers also on the footplate.[1]

During 1924, 4073 Caerphilly Castle was exhibited at the British Empire Exhibition at Wembley, alongside Nigel Gresley's Flying Scotsman. The Great Western declared their engine to be more powerful than its bigger LNER rival, and in terms of tractive effort alone they were entitled to do so. As a result of this, GWR General Manager Sir Felix Pole proposed to LNER Southern Area General Manager Alexander Wilson that a trial of the two types should take place via an exchange arrangement.[2] The resulting trials commenced in April 1925 with 4079 Pendennis Castle representing the GWR on the East Coast Main Line and 4474 Victor Wild representing the LNER on GWR tracks. On the first morning Pendennis Castle was to work a 480-ton train from King's Cross to Doncaster, and LNER officials fully expected the smaller, lighter engine to encounter problems climbing Holloway Bank. However, railway writer Cecil J. Allen records that the GWR locomotive made a faster start from King's Cross to Finsbury Park than any LNER Pacific he had recorded up to that time,[2] and over the trial Pendennis Castle kept well within the scheduled time and used less coal, considerably denting LNER pride. For the LNER, Victor Wild was compared on the Cornish Riviera Express to 4074 Caldicot Castle and although it kept to time the longer wheelbase of the Pacific proved unsuited to the many curves on the route. Again the GWR took the honours with Caldicot Castle burning less fuel and always ahead of time, this being illustrated on the last 2 days of the trial by gaining 15 minutes on the schedule in both directions.[2]

In 1926, number 5000 Launceston Castle was loaned to the London, Midland & Scottish Railway (LMS) where it ran trials between London and Carlisle. The locomotive fulfilled the LMS requirements so well that the latter first requested the GWR to build a batch of Castles for use on the West Coast Main Line, and, failing that, a full set of construction drawings. Both proposals were rejected by the GWR Board of Directors. The LMS eventually succeeded in gaining access to the design by recruiting William Stanier, the GWR's Works Manager at its Swindon Works to become the new Chief Mechanical Engineer for the LMS.[3]

In 1935 attention was turning to streamlining locomotives, particularly with the introduction of the LNER A4, and the GWR felt that they could gain publicity in this area. Instructions were passed to Swindon Works to select a suitable locomotive and as 5005 Manorbier Castle was being prepared for test, additions were made to the locomotive to effect some streamlining. The application of shaped steel sheet in an attempt to smooth airflow has been described as a "bodge-up" and certainly lacked either the elegance of the A4 design, or the sense of power associated with the streamlined LMS Coronation Class introduced 2 years later. Once the additions had been added a test run was carried out between Bristol and Swindon during which Manorbier Castle achieved a speed of 100 mph, but the experiment did not have any lasting effect on GWR locomotive design and the additions were later removed.[4]

Performance

The Castles handled all but the heaviest loads, these being entrusted to the 30-strong King Class, themselves a development of the Castles with an even larger boiler and smaller wheels (6 ft 6 in diameter) for both increased tractive effort and to allow for loading gauge clearance.

The Castle class was noted for superb performance overall, and notably on the Cheltenham Flyer during the 1930s: for example, on 6 June 1932 the train, pulled by 5006 Tregenna Castle, covered the 77.25 miles from Swindon to Paddington at an average speed of 81.68 mph start-to-stop (124.3 km at an average speed of 131.4 km/h). This world record for steam traction was widely regarded as an astonishing feat.[1]

Subsequent modification

In 1946 Frederick Hawksworth, Collett's successor, introduced a higher degree of superheat to the Castle boiler with resulting increased economy in water consumption. From 1956 the fitting of double chimneys to selected engines, combined with larger superheaters, further enhanced their capacity for sustained high-speed performance. The fastest recorded speed of a Castle Class engine was 102 mph achieved by 7018 Drysllwyn Castle at Little Somerford in April 1958 while hauling The Bristolian from Bristol to London. The non-stop run over 117.6 miles took 93 minutes 50 seconds, an average speed of more than 75 mph.[5]

Oil firing

See main article: GWR oil burning steam locomotives. Between 1946 and 1948 five engines—100A1, 5039, 5079, 5083 and 5091—were converted to oil-firing, but were soon restored to burn coal. Eleven Halls were also temporarily converted.

Accidents and incidents

Royal connections

On 28 April 1924, King George V drove locomotive No. 4082 Windsor Castle from the Swindon Works to Swindon railway station, accompanied on the footplate by Queen Mary. Plaques to commemorate the event were fixed to the sides of the cab and it was considered to be a royal locomotive from then onwards.[10] At the king's state funeral on 28 January 1936, Windsor Castle was chosen to haul the funeral train from Paddington Station in London to Windsor & Eton. It was preceded at ten-minute intervals by another six trains hauled by Castle-class engines, each carrying royal and other important mourners.[11]

The same locomotive was requested for the funeral of King George VI in February 1952; however, Windsor Castle was under repair at Swindon, so the number, name plate and commemorative plaques were swapped with No. 7013 Bristol Castle for the event. Following the funeral, the two locomotives retained their exchanged names and numbers, but the commemorative plaques were returned. No. 7013 (originally 4082) was scrapped in September 1964 while number 4082 (originally 7013) survived until February 1965.[10]

Withdrawal

Withdrawal of steam power started in the 1950s, with the first 100 A1 Lloyds withdrawn from Old Oak Common in March 1950. The first "new build" Castle, number 4091 Dudley Castle, was withdrawn from Old Oak Common nearly nine years later in January 1959.

The lowest mileage of a Castle was the 580,346 miles run by 7035 Ogmore Castle between August 1950 and June 1964; the highest mileage of any Castle class was by 4080 Powderham Castle which totalled 1,974,461 miles in 40 years and 5 months.

The last three Castles to be withdrawn were all allocated to Gloucester shed,[12] with 5042 Winchester Castle and 7022 Hereford Castle withdrawn in June 1965. The last to be withdrawn was 7029 Clun Castle in December 1965, which worked the last steam train out of Paddington on 27 November 1965.[13]

Table of withdrawals! Year !! Number in
service at
start of year !! Number
withdrawn !! Total
withdrawn !! Locomotive numbers !! Notes
1950 171 1 1 align=left 100A1
1951 170 2 3 align=left 4016/32
1953 168 1 4 align=left 111
1957 167 1 5 align=left 4000
1958 166 1 6 align=left 5086
1959 165 3 9 align=left 4091, 5010/83
1960 162 7 16 align=left 4073/84/97, 5005/09/28/79 4073 preserved
1961 155 4 20 align=left 4037/75/83/92
1962 151 54 74 align=left 4077–78/85–86/94–95/99, 5003–04/06–08/11–13/16–17/19–21/24/27/30/32–36/44–48/52–53/59,5061/62/64/66–69/72/75/77–78/82/84/88/90/94–95,7016
1963 97 49 123 align=left 4074/76/81/87/90/96/98, 5001/15/22–23/25/29/31/38/40–41/43/49–51/58/60/65/71/80–81/87/92–93/97/99,7000–01/06–07/09/15/17–18/20–21/27–28/30–31/33/36–375029, 5043, 5051, 5080 & 7027 preserved
1964 48 36 159 align=left 4079–80/82/88–89/93, 5000/02/18/26/37/39/54–57/70/73–74/76/85/89/91/96/98,7002–05/08/10/12/19/25–26/324079 preserved
1965 12 12 171 align=left 5014/42/63, 7011/13–14/22–24/29/34–35.7029 preserved

List of locomotives

See List of GWR 4073 Class locomotives

Preservation

On 4 March 1967, Nos. 7029 Clun Castle and 4079 Pendennis Castle hauled specials from Banbury and Oxford respectively to Chester, to mark the end of through trains between Paddington and Birkenhead. These two, and six other Castles, survive in preservation.Of the eight Castles to be preserved, six have steamed in preservation and have been operated on the main line. Three were obtained direct from BR, 4073, 4079 and 7029, with the remaining five being rescued from Barry Scrapyard.

No. 4073 Caerphilly Castle was given directly to the National Collection upon withdrawal and has not run since being preserved. It can currently be found at STEAM, the Museum of the Great Western Railway in Swindon. No. 7027 Thornbury Castle was in ex-Barry Scrapyard condition and in July 2016 was sold by Pete Waterman to the Somerset transport firm JJP Holdings SW, transported to Weston-super-Mare on a low loader, then placed on a temporary track in the Crosville Motor Services bus depot. In summer 2018 it was moved briefly to Tyseley Locomotive Works in Birmingham to make an appearance at their open weekend before moving to its planned home at the West Somerset Railway for restoration. It is now located at Loughborough on the Great Central Railway.,[14] but will not be restored to mainline standards as its current owner intends to run it for its first ticket on the GCR before considering future mainline certification.

Two of the eight preserved Castles, nos. 5043 Earl of Mount Edgcumbe and 7029 Clun Castle, are fitted with double chimneys while the remaining six are still fitted with the original single chimney.

4079 was purchased by Sir William McAlpine and hauled a small number of railtours on the main line in its early preservation years before being sold to Hamersley Iron in the Pilbara region of Western Australia and exported in 1977.[15] In 1989 it was moved by road to Perth where it double-headed with 4472 Flying Scotsman operating as far as Esperance.[16] In 2000 it was donated by Rio Tinto to the Great Western Society and restored to operational condition at the Didcot Railway Centre in 2021.[17]

, three Castles are operational. Both 5043 and 7029 have mainline certificates with 4079 restricted to only operate on heritage lines. Two engines, 5029 and 5080, are in the process of undergoing overhauls. 5080 is due to have its boiler assessed in 2024 to ascertain the cost of its overhaul, to speed up the engines return to service only the engines boiler is to be overhauled while its bottom-end remains intact. The engine will only operate on heritage railways at first but a full mechanical overhaul to mainline standards will be undertook once enough money has been raised to cover a full overhaul, the engine will eventually become part of Tyseley's pool of mainline certified alongside classmembers 5043 and 7029.[18] [19] 5029 is undergoing a mainline standard overhaul with a completion set for late 2024.[20] [21]

4079 was originally planned to operate on the mainline following completion of its overhaul, but a later announcement by Didcot that they intend to stop operating on the mainline meant it will only run on heritage railways.[22] Upon completion of its restoration, 7027 is also intended to operate only on heritage railways, however the debate over the restoration of this locomotive continues.

ImageNumberName (Current in Bold)BuiltRenamedWithdrawnChimney fittedTender fittedOwnerLiveryHome BaseCurrent statusMainline CertifiedNotes
4073Caerphilly CastleAugust 1923May 1960SingleChurchwardNational Railway MuseumGWR Lined Green, Great Western LetteringMuseum of the Great Western RailwayOn static displayNo
4079Pendennis CastleFebruary 1924May 1964SingleCollettGreat Western SocietyGWR Lined Green, Great Western Lettering Didcot Railway CentreOperational, (Boiler Certificate 2021–31)No
5029Nunney CastleMay 1934December 1963SingleCollettJeremy HoskingBR Lined Green, TBC (on completion)Crewe Diesel TMDUnder OverhaulNo, to be certifiedOverhaul anticipated for completion in late 2024.
5043Earl of Mount Edgcumbe
(Barbury Castle)
March 1936September 1937December 1963DoubleHawksworthBirmingham Railway MuseumBR Lined Green, Early EmblemTyseley Locomotive WorksOperational (Boiler Certificate 2023–33).Yes (2023-Ongoing)
5051Earl Bathurst
(Drysllwyn Castle)
May 1936August 1937May 1963SingleCollettGreat Western SocietyGWR Lined Green, Shirtbutton LogoDidcot Railway CentreOn static displayNo
5080Defiant
(Ogmore Castle)
May 1939January 1941April 1963SingleCollettBirmingham Railway MuseumGWR Lined Green, GW Lettering (on completion)Tyseley Locomotive WorksUndergoing mainline standard overhaul.[23] No, to be certified5080's tender is undergoing overhaul with completion expected before the end of 2024 and 5080's boiler is due to be assessed in 2024 to ascertain the cost of an overhaul.
7027Thornbury CastleAugust 1949December 1963SingleHawksworthGreat Western Society's 4709 GroupBR Lined Green, TBC (on completion)Great Central RailwayStoredNoInitially undergoing restoration but now sold to the 4709 Group which intends to use the boiler in their project to re-create a GWR 4700 Class.[24] [25] [26]
7029Clun CastleMay 1950December 1965DoubleCollettBirmingham Railway MuseumBR Lined Green, Late CrestTyseley Locomotive WorksOperational, boiler certificate 2017–27Yes (2019-Ongoing)

References

Bibliography

External links

Notes and References

  1. Book: Nock, O.S. . Oswald Nock . Kings & Castles of the G.W.R. . Ian Allan Publishing. Shepperton . 1969 . 2nd . 0-7110-0071-9.
  2. Book: Allen, Cecil J. Cecil J. Allen. Salute to the Great Western. Ian Allan. Shepperton. 1970. 0-7110-0181-2.
  3. Book: 52. Swindon Steam 1921–1951. 1974. Kenneth J. Cook. Ian Allan. Staines, Middlesex .
  4. Bullock. William. August 1992. Swindon Apprentice. Steam World. 62. Peterborough. EMAP Apex Publications. 30–33.
  5. Book: Great Western. Allen. Cecil. 1962. Ian Allan. 64.
  6. Book: Earnshaw, Alan . Trains in Trouble: Vol. 5 . 1989 . Atlantic Books . Penryn . 0-906899-35-4 . 29 .
  7. Light at the end of the tunnel for Severn 'Prairie' . . Bauer Consumer Media Ltd . Peterborough . 17 June 2016 . 455 . 0143-7232 . 40–42.
  8. Four killed and 50 injured in train crash . 1 December 1948 . 4 . 51243 . A-B .
  9. Book: Trevena, Arthur . Trains in Trouble . 1 . 1980 . . Redruth . 0-906899-01-X . 47 .
  10. Web site: Castle Class - Windsor Castle . Daniel . John . www.greatwestern.org.uk . 14 October 2022.
  11. . 15 February 1936 . Workings of Royal Special Trains in connection with the Funeral of the late King . The Locomotive Magazine and Railway Carriage and Wagon Review . 42 . 522 . 42–43 . 14 October 2022 . 28 January 2023 . https://web.archive.org/web/20230128130700/https://steamindex.com/locomag/lcwr42.htm . dead .
  12. Book: Waters, Laurence . Steam in Action 'Castles' . Ian Allan . Shepperton . 1991 . 0-7110-2006-X .
  13. Book: Riley, R.C.. Great Western Album. Ian Allan. Shepperton. 1966. 0-7110-0073-5.
  14. Web site: History of 7027 Thornbury Castle. dead. Castle Class Steam Locomotive Thornbury Castle. Thornbury Castle 7027 Society. en. https://web.archive.org/web/20180922024500/https://www.thornburycastle7027.co.uk/kinlet-history.php. 22 September 2018. 21 September 2018.
  15. Castle goes down under Railway Gazette International July 1977 page 28
  16. The World's Heaviest Driverless Trains Locomotives International issue 125 June 2020 page 24
  17. Homeward Bound The Railway Magazine issue 1187 March 2000 pages 20-26
  18. 5080 Update Trackside issue 32 March 2024 page 13
  19. 5080 Update on future Trackside issue 33 April 2024 page 9
  20. Progress on 5029's ongoing overhaul at Crewe Steam Railway issue 549 September 2023 page 76
  21. Update on 5029's overhaul Steam Railway issue 549 September 2023 page 76
  22. Web site: Holden. Michael. 12 December 2019. Steam locomotive 6023 King Edward II retired from mainline work. 3 July 2020. RailAdvent. en-GB.
  23. http://www.vintagetrains.co.uk/defiant.aspx/ Defiant Club
  24. https://www.railadvent.co.uk/2020/01/steam-locomotive-7027-thornbury-castle-set-for-great-central-railway-restoration.html Steam locomotive 7027 Thornbury Castle set for Great Central Railway restoration
  25. Web site: 4709 Group buys Thornbury Castle – 4709 – The Ultimate British 2–8–0 . 13 August 2022 . 4709 – The Ultimate British 2–8–0 . en-US.
  26. Web site: 4709 Group purchases Great Central Railway-based steam locomotive 7027 Thornbury Castle . 13 August 2022 . RailAdvent . en-GB.