Göktürk | |
Style: | Istanbul Metro |
Style2: | M11 |
Symbol Location: | istanbul |
Type: | Istanbul Metro rapid transit station |
Address: | Atatürk Cd., Göktürk Merkez, 34077 |
Borough: | Eyüp |
Owned: | Ministry of Transport and Infrastructure |
Operator: | Istanbul Metro |
Platform: | 1 Island platform |
Tracks: | 2 |
Connections: | İETT Bus: 48, 48A, 48C, 48D, 48E, 48G, 48K, 48KA, 48L, 48P, 48Y, 50G |
Structure: | Underground |
Parking: | Yes |
Bicycle: | Yes |
Depth: | 22m (72feet) |
Accessible: | Yes |
Opened: | 22 January 2023 |
Göktürk is an underground station on the M11 line of the Istanbul Metro in Eyüp. It has one entrance located on Atatürk Street in the Göktürk Tree Plantation[1] in the town of Göktürk, Eyüp district, Turkey. The station is among the first five metro stations to be located outside of the city (urban area) of Istanbul.
Construction of the station began in 2016, along with the entire route from Gayrettepe to the Istanbul Airport.
The Göktürk Station was opened on along the rest of the U1 line on 22 January 2023.[2]
Northbound | ← toward (İhsaniye) | |
Southbound | toward Gayrettepe (Kemerburgaz) → |