Fuyang–Lu'an railway explained
|
Status: | Operational |
Linelength: | 167.80NaN0 |
Electrification: | 50 Hz 25,000 V |
Speed: | 1600NaN0 |
The Fuyang–Lu'an railway is an electrified single-track railway line in China. It is 167.8km/h long and has a maximum speed of 160km/h.[1]
The line has one passenger station, Huoqiu.
History
Construction of the line began on 10 August 2009. It was opened on 28 December 2013. Passenger service was introduced on 2 July 2014.[2]
Notes and References
- Web site: 30 December 2013. 阜六铁路正式开通运营 历时建设四年多. The official opening and operation of the Six Railways took more than four years to build. dead. https://web.archive.org/web/20140103215051/http://news.hf365.com:80/system/2013/12/30/013667888.shtml. 3 January 2014. 27 March 2021. zh.
- Web site: 7 September 2020. "阜六铁路"给老区人民搭上"幸福车". The Fuyang-Lu'an railway gives the people of the old district a ride of happiness.. 27 March 2021. zh.