Future of the French Navy explained
The French Navy's modernization, as is the case with the Army and Air and Space Force, is pursued on the basis of successive 7-year Military Planning Laws (Loi de Programmation Militaire or LPM).[1] The latest LPM covers the 2024-2030 period and is tailored around four strategic priorities: the strengthening of deterrence assets; preparation for high-intensity warfare; protecting national interests in all French territories (notably the Outre-mer), shared spaces and key domains (e.g., maritime, digital, outer space); and finally, the strengthening of international partnerships.[2]
Major programs encompass a wide variety of capabilities; from the replacement of the current generation of ballistic missile submarines, nuclear attack submarines and nuclear-powered aircraft carrier to the ongoing modernization of the first-rank surface combatant fleet as well as offshore patrol and logistic support fleets.
Core Surface and Sub-Surface Capabilities
- 1 PANG new generation nuclear-powered aircraft carrier to succeed the Charles de Gaulle: Scheduled to be commissioned in 2038. In October 2018, the French Ministry of Defence launched an 18-month study for €40 million for the future replacement of the Charles de Gaulle beyond 2030. In December 2020 President Macron announced that the project would proceed. Preliminary design work on new 220 MW K22 nuclear reactors to power the ship was completed in 2023. A production contract for the ship itself is anticipated in about 2025 with hull construction to begin in about 2031. Sea trials are projected to begin in around 2035.[3] The carrier is planned to have a displacement of around 75,000 tons and to carry about 32 next-generation fighters, two to three E-2D Advanced Hawkeyes and a yet-to-be-determined number of unmanned carrier air vehicles.[4] [5]
- 4 SNLE 3G new generation ballistic missile submarines to succeed the Triomphant-class: Studies were initiated in 2017 on the construction of a new class of SSBNs to renew the national nuclear deterrent in the 2030s. Steel cut on the first of the new submarines took place in March 2024[6] with the first new SSBN to enter service in about 2035.[7] [8] [9] Deliveries of the three follow-on boats are expected to occur thereafter at five year intervals.[10]
- 6 Barracuda nuclear-powered attack submarines to succeed the Rubis-class: the contract for the first three of these submarines was signed in 2006. The construction of the first boat in the class also began in 2006 and she was commissioned in 2020.[11] The second vessel was delivered in 2023 while the third began sea trials in mid-2024.[12] Additional boats in the class will enter service through the 2020s, with the sixth submarine planned for service entry in 2030.[13]
- 5 FDI (formerly FTI) frigates to be delivered from 2024 onwards: Construction work on modules for the lead ship of the FDI class, Admiral Ronarc'h, began in October 2019.[14] She was formally laid down on 17 December 2021[15] and launched in November 2022.[16] The FDI program follows on the construction of 8 FREMM multipurpose frigates for the navy, the first of which was delivered in 2012 and the last in 2022.[17] In 2015 the order of FREMM-class units was reduced to 8 ships and it was decided to proceed with the purchase of FDI medium-size frigates instead.[18] [19]
Sovereignty Protection Vessels
- The European Patrol Corvette (EPC) program or Modular and Multirole Patrol Corvette (MMPC): currently under development in cooperation with various European states. In the case of France, the acquisition of 6 units is planned in order to replace the French Navy's aging 6 Floréal-class surveillance frigates from 2030 onwards.[20] [21] [22]
- 7 Patrouilleurs Hauturiers (PH), formerly Patrouilleurs Océaniques (PO) by 2030, plus a further 3 to follow by 2035: this new class of vessels is intended to replace the French Navy's D'Estienne d'Orves-class offshore patrol vessels (previously avisos) based in both the Atlantic and Mediterranean, as well as the PSP Flamant-class coast guard vessels based in Cherbourg. 10 ocean-going patrol vessels of about 2,000-tons were originally planned, with the first unit expected to be delivered in 2025 and all by 2030.[23] [24] [25] [26] However, in the 2024-2030 LPM unveiled on April 4, 2023, it was revealed only 7 vessels are to be in service by 2030, with the first unit being delivered in 2026 and the last in 2029 (this was reportedly due to significant cost increase; Sébastien Lecornu, the Minister of the Armed Forces, having spoken at a Senate hearing on June 28, 2023, about an additional €500 million being needed in the LPM for two more PH vessels[27] as requested by the Senators in an amendment). The remaining 3 units, meanwhile, are to be ordered and delivered between 2030 and 2035.[28] It has been reported so far the ships will be equipped with a hull sonar, enabling them to escort submarines tasked with nuclear deterrence,[29] as well as with the Thales and Nexter 40mm RAPIDFire CIWS.[30] They will also be used for state action at sea, such as fisheries and traffic surveillance.[29] The first seven ships were ordered in November 2023.[31]
- 6 Patrouilleur Outre-mer: these offshore patrol vessels are being delivered between 2023 and 2026[32] and are tasked with the protection of the exclusive economic zones of French overseas territories in the Indian Ocean and the Pacific.[33] [34] Two ships each are to be based in New Caledonia, Tahiti and Réunion respectively.[35] The vessels were ordered in December 2019[36] and construction began in October 2020.[37] In May 2021, it was reported that the delivery of the first of these vessels would be delayed, from an originally planned in-service date of 2022 to 2023.[33] The lead ship of the class, Auguste Benebig, was launched at the Socarenam shipyard in Saint Malo on October 15, 2021, and began sea trials in July 2022.[38] She arrived at her home base in New Caledonia in April 2023.[39] [40] A second vessel arrived in Tahiti in May 2024.[41]
Mine Warfare Vessels
- Système de lutte anti-mines futur (SLAM-F): The program aims to develop a wide variety of systems to replace the French Navy's current mine warfare vessels (Éridan-class minehunters as well as associated sonar towing vessels and EOD diving support vessels). The SLAM-F will consist of 6 motherships (BGDM), 8 unmanned systems, 5 new generation base ships for mine clearance divers (BBPD NG) and 1 Mine Warfare Data Processing System (SEDGM). These will be complemented by 8 Ophrys-class diving support vessels (VSP), the first of which was delivered in November 2022 and the last unit expected to be delivered by 2026.[42] Initial operational capability for the unmanned systems is to be achieved in late 2023 starting with shore-based elements.[43] [44] [45] The first unmanned Mine Warfare Prototype of the system was delivered in November 2021.[46] At Euronaval 2022, a partnership agreement was signed between the Belgian, Dutch and French navies to enhance cooperation between them. As a result, the 6 BDGM motherships that the French Navy will order as part of the SLAM-F program will be a variant of the City-class design intended for the Dutch and Belgian navies.[47] [48] 3 BDGM, 6 unmanned systems, 3 BBPD NG as well as the 8 VSP are expected to be in service by 2030 and all systems planned by 2035.[49]
Amphibious warfare ships
- 14 EDA-S Amphibious Standard Landing Craft: the craft have been ordered to replace CTM landing craft that equip the Mistral-class amphibious assault ships and to restore a light amphibious transport capability to French forces stationed in some of France's overseas territories (Mayotte, New Caledonia, Martinique and French Guiana) and Djibouti. The vessels have a payload capacity of 65 to 80 tonnes and a maximum speed of 11 knots (at full load). The first two EDA-S vessels (Arbalète and Arquebuse) were delivered to the navy in November 2021[50] [51] and entered operational service in July 2022. The next four units are intended for the Toulon naval base and will be delivered from mid-2023 onwards.[52] Deliveries will continue up to 2025.[53]
- 4 Light Force Projection Ships: During the 2023 parliamentary review of the 2024-30 LPM, several amendments were adopted to add a program for light amphibious ships capable of landing on beaches with no major port infrastructure to existing plans in order to restore the rapid intra-theater transport of troops and cargo capabilities lost in New Caledonia, French Polynesia, La Réunion and Martinique when the BATRAL-class landing ship tanks were decommissioned between 2004 and 2017. The concerns were shared by the Minister of Armed Forces. He indicated the government was favorable to this and that feasibility studies would be initiated on the development of the light force projection ships.[54]
Support Ships
- 4 BRF Jacques Chevallier-class new generation replenishment tankers: these vessels are a variant of Italy's Vulcano-class logistic support ship and three are to be delivered to the French Navy between 2023 and 2027. In 2024-2030 LPM, it was decided that the order of the fourth ship of the class was to be delayed beyond 2030.[55] They will replace the current support ships and will be able to carry twice as much fuel, arms and ammunition, spare parts and food. They will possess workshops to perform repairs and carry and support helicopters for maritime operations. The French vessels will be larger than their Italian counterparts due to the need for a greater capacity for aviation fuel.[56] [57] [58] [59] Construction of the lead ship of the class, Jacques Chevallier, began in May 2020.[60] She was launched in April 2022,[61] began sea trials in December[62] and was delivered in July 2023.[63] [64] The second ship of the class (Jacques Stosskopf) began construction in February 2022.[65]
Hydrographic and oceanographic survey vessels
- Capacité Hydrographique et Océanographique Future (CHOF): the program aims at renewing and adapting France's hydrographic and oceanographic data gathering capability. For that purpose, the 3000 tonne-class vessel under development will incorporate many innovations such as a new generation on-board cold atom gravimeter, the use of surface and underwater drones as well as gliders and the development of artificial intelligence solutions for data processing. It is intended to fulfill various missions ranging from general hydrography to strategic defence functions and government action at sea. 2 CHOF vessels are scheduled to enter service by 2030.[66] They will be complemented by a third hydro-oceanographic asset (yet to be determined) by 2035.[67]
Naval Aviation
- 3 E-2D Advanced Hawkeye carrier-based early warning aircraft will be introduced from 2030 onwards to replace the E-2C currently in French service.[68] [69]
- 18 Atlantique 2 Maritime Patrol Aircraft are being upgraded to the “Standard 6” upgrade incorporating a new radar, new acoustic subsystem and other improvements. Eighteen aircraft are being upgraded starting in 2020 in order to remain operationally relevant up to 2035.[70] [71] Three of the enhanced aircraft were delivered by mid-2020 and the system was declared to have reached initial operating capability in December 2020. Full operating capability was achieved in 2021 when the fifth of the upgraded aircraft was delivered. A sixth upgraded aircraft was delivered in December 2021, a seventh in April 2022[72] [73] and the eighth and ninth were received in July.[74] Upgrades of the remaining aircraft in the fleet are to continue until 2024.[75] [76] In November 2022, the upgraded aircraft was said to have reached the milestone of being able to perform the entire spectrum of missions assigned to it.[70]
- PATMAR new generation maritime patrol aircraft program intended to succeed the Atlantique 2: On December 22, 2022, the DGA awarded Airbus Defence and Space and Dassault Aviation two architecture studies for a future maritime patrol system based on one of their aircraft: the A320neo for Airbus Defence and Space and the Falcon 10X for Dassault Aviation, for a total of €10.9 million awarded per study to each manufacturer.[77]
- 7 Falcon 2000 Albatros Maritime Surveillance and Intervention Aircraft (AVSIMAR) were ordered in 2020 and are to be delivered to the French Navy from 2025 onwards. A total of 12 units are planned and all are expected to be in service by 2035.[78] [79]
- 49 Airbus H160M Guépard helicopters are to be delivered to the French Navy from 2029 onwards.[80] [81] Pending delivery of the militarized H160M, the French Navy is to be delivered 6 commercial H160s optimized for search and rescue missions in a lease purchase contract, with delivery to begin in May 2022 onwards. They are to be operated for 10 years.[82] [83] To complement this interim fleet, 12 Dauphin N3 helicopters will also be leased and serve through the 2020s.[84]
- 8 Airbus SDAM unmanned helicopters are scheduled to enter service with the French Navy by 2030 and at least 15 by 2035.[85]
Missiles and other Weapon Systems
- The upcoming Aster 30 B1 NT is being procured to strengthen French first-rank frigates' anti-ballistic missile capabilities.[86]
- MdCN land-attack cruise missiles have been deployed on the 6 ASW/land-attack Aquitaine-class frigates and will also be on all 6 Barracuda-class submarines.
- The Exocet Block 3c, latest variant of the legacy anti-ship missile, is being delivered the French Navy since December 2022.
- The Future Cruise/Anti-Ship Weapon, is currently under development in cooperation with the United Kingdom and Italy. The missiles are to be operational by 2030 and will be replacing the SCALP-EG cruise missile as well as the Exocet anti-ship missile.
- The Anti-Navire Léger lightweight anti-ship missile is also scheduled to enter service in the 2020s.
- The French Navy is working on the integration of DEW on various warships. The Helma-P laser weapon, for example, has been successfully tested on the Horizon-class Forbin destroyer in June 2023.
See also
Notes
- Decision on future French aircraft carrier – December 2020 – https://news.yahoo.com/frances-next-generation-aircraft-carrier-164947235.html
References
- Book: Saunders . Stephen . . 2007 . Jane’s Information Group . Coulsdon .
Notes and References
- Projet de loi programmation militaire pour les années 2003 à 2008
Retrieved on March 23, 2008.
- News: LPM 2024–2030 : 413 milliards d’euros pour « transformer » les armées. 25 January 2023 . ministère des Armées . 22 January 2023.
- Web site: Focus : le porte-avions français de nouvelle génération (PA-NG) . Mer et Marine . Groizeleau . Vincent . 19 June 2023 . 19 June 2023.
- Web site: President Macron Announces Start of New French Nuclear Aircraft Carrier Program. 8 December 2020.
- Web site: France: President Macron confirms that the future aircraft carrier will feature nuclear propulsion . EDR on-line . 8 December 2020 . 19 June 2023.
- Web site: Cherbourg : Naval Group découpe la première tôle du prochain SNLE français . Mer et Marine . Groizeleau . Vincent . 21 March 2024.
- Web site: Cherbourg. La livraison du Duguay-Trouin, 2e sous-marin Barracuda, programmée .
- Web site: Marine nationale : Les programmes qui vont façonner la future flotte française. February 2021.
- Web site: Naval Group Signs First Industrial Orders for the New Generation of French Navy SSBN. 30 June 2021.
- Web site: France launches program for third generation of SSBN SNLE 3G submarines for French Navy.
- Web site: New Suffren Barracuda-class nuclear-powered attack submarine officially commissioned by French Navy.
- Web site: Le SNA Tourville débute ses essais en mer . Groizeleau . Vincent . Mer et Marine . 12 July 2024 . 12 July 2024.
- Web site: Janes | Latest defence and security news.
- Web site: Naval Group starts construction on France's newest frigate. 25 October 2019.
- Web site: French Naval Group holds keel-laying ceremony for first FDI frigate.
- Web site: Naval Group Floats First New FDI Frigate for the French Navy . 7 November 2022 .
- https://www.defense.gouv.fr/marine/actualites/marine-prend-charge-fremm-da-lorraine
- Web site: France accelerates the FDI frigates program.
- Web site: Update to French Military Planning Law Means New Capabilities for Lafayette Class Frigates . Navy Recognition . 2015-05-21.
- Web site: Spain officially joins European Patrol Corvette (EPC) program – Naval Post- Naval News and Information. 11 May 2020.
- Web site: Le ministère des Armées a commandé les six patrouilleurs outre-Mer promis à la Marine nationale. 4 December 2019.
- Web site: The PeSCo’s European Patrol Corvette (EPC) programme gains momentum . edrmagazine . 19 October 2020.
- Web site: Naval Group secures design contract for French Navy's future ocean patrol vessels. 14 October 2021.
- Web site: Airbus to Supply 'SMDM' Aliaca fixed-wing UAV to the French Navy. 11 February 2021.
- Web site: French Navy Ageing PHMS and PSPS Patrol Vessels to be Replaced with 10 new OPVs. 25 June 2020.
- Web site: Euronaval: First details of the Patrouilleurs Océanique (PO) platform unveiled. 23 October 2020.
- Web site: Comptes rendus analytiques officiels du 28 juin 2023 . 28 June 2023.
- Web site: PROJET DE LOI relatif à la programmation militaire pour les années 2024 à 2030 et portant diverses dispositions intéressant la défense . 4 April 2023.
- Web site: La France va se doter de 10 patrouilleurs océaniques pour remplacer une flotte "obsolète". 25 June 2020.
- Web site: RAPIDFire: Thales and Nexter to equip French Navy ships with new CIWS system. 27 October 2020.
- Web site: DGA Orders First Seven Ships of the Offshore Patrol Vessel Program . Sea Waves Magazine . 28 November 2023.
- Web site: Le patrouilleur outre-mer « Teriieroo a Teriierooiterai » a été admis au service actif . zone militaire . Lagneau . Laurent . fr . 18 July 2024 . 16 August 2024.
- Web site: La livraison du premier patrouilleur d'outre-mer repoussée à 2023. 21 May 2021.
- Web site: NEXEYA to Supply CMS for French Navy's POM Offshore Patrol Vessels. 8 May 2020.
- Web site: Communiqué_Les futurs patrouilleurs outre-mer de la Marine nationale porteront les noms de héros ultramarins de la France libre . 2021-09-05 . 2021-09-05 . https://web.archive.org/web/20210905125411/https://www.defense.gouv.fr/salle-de-presse/communiques/communique_les-futurs-patrouilleurs-outre-mer-de-la-marine-nationale-porteront-les-noms-de-heros-ultramarins-de-la-france-libre . dead .
- Web site: France orders six patrol ships, equipped with drones and able to secure prisoners. 6 December 2019.
- Web site: SOCARENAM Begins Construction on French Navy's POM OPV. 9 October 2020.
- Web site: Socarenam begins sea trials of the First POM OPV . 27 July 2022 .
- Web site: EN IMAGES. L'arrivée du patrouilleur "Auguste-Bénébig" à Nouméa . nouvellecaledonie . fr . 3 April 2023 . 4 April 2023.
- Web site: Socarenam Launches First POM OPV for French Navy. 17 October 2021.
- Web site: Le Teriieroo a Teriierooiterai est arrivé . Larcher . Tom . Tahiti Infos . fr . 23 May 2024 . 24 May 2024.
- Web site: La DGA lance la production des vedettes de soutien à la plongée . Ministère des Armées . 23 March 2023.
- Web site: A la découverte du système de drones de Thales de lutte contre les mines | Mer et Marine . 11 July 2022 .
- Web site: France Launches SLAMF Mine Warfare Program but Many Questions Remain. 6 November 2020.
- Web site: French Navy begins broad revamp of its mine-hunting abilities. 6 November 2020.
- Web site: France Takes Delivery of First SLAMF Unmanned Mine Warfare Prototype. 8 December 2021.
- Web site: Frankrijk wil (bijna) zelfde mijnenbestrijdingsvaartuigen als Nederland en België. Marineschepen. 2022-10-19. 2022-10-20. NL.
- Web site: Mine Warfare: France, Belgium And Netherlands Seal Partnership. Naval News. 2022-10-20. 2022-10-20. EN.
- Web site: PROJET DE LOI relatif à la programmation militaire pour les années 2024 à 2030 et portant diverses dispositions intéressant la défense . 4 April 2023.
- Web site: French Navy receives two EDA-S Amphibious Standard Landing Crafts.
- Web site: First Two EDA-S Next Gen Amphibious Landing Craft Delivered to French DGA. 25 November 2021.
- Web site: Flottille amphibie : deux nouveaux EDA-S attendus à Toulon d’ici l’été . Mer et Marine . Groizeleau . Vincent . fr . 1 March 2023 . 1 March 2023 . subscription.
- Web site: French Navy EDA-S landing craft successfully conclude end-user evaluations.
- Web site: LPM 2024-30 : La Marine nationale devrait disposer de quatre nouveaux navires légers de projection de forces . Zone militaire . Lagneau . Laurent . 27 May 2023.
- Web site: Dernière navigation pour le BCR Marne, qui passe le flambeau au BRF Jacques Chevallier . Mer et Marine . fr . Groizeleau . Vincent . 13 April 2023. 13 April 2023.
- Web site: Construction Begins for French Navy's Next Gen Replenishment Tanker Chevallier-class 'BRF'. 18 May 2020.
- Web site: Jacques Chevallier-Class Logistic Support Ships, France.
- Web site: Marine nationale : Le BRF Jacques Chevallier sera livré en 2023. 14 April 2021.
- News: Pétrolier ravitailleur : la France monte à bord du programme italien Vulcano . Michel . Cabirol . 15 June 2018 . Le Tribune.
- Web site: Saint-Nazaire. La ministre Florence Parly aux Chantiers de l'Atlantique.
- Web site: Saint-Nazaire. Chantiers de l’Atlantique : le navire militaire Jacques-Chevallier mis à flot . ouest france . 29 April 2022 . 11 March 2023.
- Web site: En images : première sortie d’essais en mer pour le BRF Jacques Chevallier . Mer et Marine . fr . Groizeleau . Vincent . 22 December 2022 . 23 December 2022.
- Web site: Naval Group Delivers First BRF Supply Ship To French Navy . Naval News . Vavasseur . Xavier . 19 July 2023 . 20 July 2023.
- Web site: Chantiers de l'Atlantique delivers first new logistic support ship to French Navy . Janes . 7 March 2023 . 8 March 2023.
- Web site: Fincantieri Cuts Steel For French Navy Second Logistic Support Ship . Naval News . Vavasseur . Xavier . 7 February 2022 . 29 April 2022.
- Web site: CHOF : Quels futurs moyens hydrographiques pour la marine ?. 8 March 2018.
- Web site: PROJET DE LOI relatif à la programmation militaire pour les années 2024 à 2030 et portant diverses dispositions intéressant la défense . 4 April 2023.
- Web site: La mise en service des E-2D français prévue en 2030 | Mer et Marine. 19 January 2022.
- Web site: France confirms order for 3 US-made E-2D Advanced Hawkeye carrier-capable early warning aircraft.
- Web site: Operational Commissioning of the Atlantique 2 to Standard 6 .
- Web site: French Navy Received First Two Upgraded ATL2s Maritime Patrol Aircraft. 30 October 2019.
- Web site: French Navy Receives Sixth Upgraded ATL2 Maritime Patrol Aircraft. 21 January 2022.
- Web site: La Marine nationale réceptionne son 7ème Atlantique 2 modernisé | Mer et Marine . 5 May 2022 .
- Web site: French Navy Receives 8th and 9th Upgraded ATL2 MPA . 22 July 2022 .
- Web site: French Navy's Upgraded ATL2 MPA Reaches IOC. 23 December 2020.
- Web site: French Navy Receives Fifth Upgraded ATL 2 Maritime Patrol Aircraft. 8 June 2021.
- Web site: La DGA lance deux études d’architectures de l’avion de patrouille maritime futur . 12 January 2023.
- Web site: Falcon 2000 Albatros for the French Navy – SeaWaves Magazine.
- Web site: Atos to equip future surveillance aircraft Falcon 2000 Albatros with develops video system.
- Web site: French MoD Orders 169 HIL Guépard from Airbus Helicopters. 23 December 2021.
- Web site: Airbus H160M on Course for 2026 Service Entry.
- Web site: First H160 SAR Helicopter Delivered to Babcock for the French Navy . 19 May 2022 .
- Web site: French Navy will receive two more Airbus Helicopters H160s.
- Web site: Un nouvel hélicoptère pour la frégate de surveillance Prairial en Polynésie | Mer et Marine . 17 October 2022 .
- Web site: PROJET DE LOI relatif à la programmation militaire pour les années 2024 à 2030 et portant diverses dispositions intéressant la défense . 4 April 2023.
- Web site: France And Italy Procure 700 Aster Surface To Air Missiles | Naval News . 30 January 2023.