Fukae Station Explained
is a railway station in Higashinada-ku, Kobe, Hyōgo Prefecture, Japan. It is owned and operated by private operator Hanshin Electric Railway.
Layout
This station consists of two opposed elevated side platforms serving two tracks.
History
Fukae Station opened on April 12, 1905 along with the rest of the Hanshin Main Line.[2]
On January 17, 1995, the station was damaged by the Great Hanshin earthquake. Service in the affected area was restored by June 26, 1995.[3]
Station numbering was introduced on 21 December 2013, with Fukae being designated as station number HS-21.[4]
Between April 2009 and November 2019, the line between Sumiyoshi Station and Ashiya Station underwent grade separation.[5] [6] The elevated westbound tracks opened for service in December 2015 while the eastbound tracks opened for service on November 30, 2019.
Gallery
External links
Notes and References
- Web site: 2020 . 2020 Handbook Hanshin . live . https://web.archive.org/web/20211112064459/https://www.hanshin.co.jp/handbook/pdf/2020/handbook_all.pdf . 12 November 2021 . 27 February 2022 . Hanshin Railway Online . ja .
- Book: 兵庫の鉄道全駅 私鉄・公営鉄道 . 2012-12-10 . 神戸新聞総合出版センター . 9784343006745 . Kobe, Japan . Kobe Shimbun General Publishing Center . 37 . ja . All railway stations in Hyogo Private railways and public railways.
- Book: 不死鳥レールウェイ . 2010-01-17 . 神戸新聞総合出版センター . 978-4-343-00537-3 . 126 . ja.
- Web site: 30 April 2014 . 阪神「三宮」を「神戸三宮」に駅名変更のうえ、駅ナンバリングを導入し、全てのお客さまに分かりやすい駅を目指します . After changing the station name from Hanshin "Sannomiya" to "Kobe Sannomiya", Introduced station numbering, Aiming for a station that is easy for all customers to understand . live . https://web.archive.org/web/20210410181812/https://www.hankyu-hanshin.co.jp/legacy_data/ir/data/SR201304304N1.pdf . 10 April 2021 . 27 February 2022 . Hanshin News Online . ja .
- Web site: 2019-11-01 . 神戸市:阪神本線住吉・芦屋間連続立体交差事業 魚崎駅~芦屋駅間 上り線高架切替え . Hanshin Main Line Sumiyoshi-Ashiya Continuous Crossing Project Uozaki Station-Ashiya Station Up Line Elevated Switching . dead . https://web.archive.org/web/20210204015553/https://www.city.kobe.lg.jp/a29387/business/20191101press.html . 4 February 2021 . 28 February 2022 . 神戸市都市局市街地整備部都市整備課 . ja .
- Web site: 2019-11-01 . 阪神本線住吉・芦屋間連続立体交差事業 11月30日始発から魚崎駅~芦屋駅間上り線を高架に切替え ~これにより、神戸市内の11か所の踏切がなくなります~ . Hanshin Main Line Sumiyoshi-Ashiya continuous crossing project: From the first train on November 30, the up line between Uozaki Station and Ashiya Station will be switched to an elevated line. . live . https://web.archive.org/web/20210201145501/https://www.hanshin.co.jp/company/press/pdf/20191101-higashinada-kouka.pdf . 1 February 2021 . 28 February 2022 . Hanshin Railway Online . 阪神電気鉄道(経営企画室・広報担当) . ja .