Forward Wind Energy Center Explained

Forward Wind Energy Center
Country:United States
Location:near Brownsville, Wisconsin
Coordinates:43.6161°N -88.5122°W
Status:O
Construction Began:2007
Commissioned:2008
Owner:Wisconsin Public Service (44.6%)
Wisconsin Power & Light (42.6%)
Madison Gas and Electric (12.8%)
Ps Units Operational:86 turbines
Ps Units Manu Model:GE 1.6sle 1.6 MW
GE 1.85sle 1.85 MW
Wind Farm Type:Onshore
Ps Electrical Capacity:137.85 MW
Ps Electrical Cap Fac:27.7% (average 2009-2017)
Ps Annual Generation:335 GW·h

The Forward Wind Energy Center is a 137.85 megawatt (MW) wind farm in Dodge and Fond du Lac County, Wisconsin near the village of Brownsville. The wind farm sits on approximately 4,000 acres of land.[1] "Forward" is the state's motto. The facility is sited in close proximity to the Horicon National Wildlife Refuge and the Horicon Marsh State Wildlife Area which provide nesting areas for waterfowl and a resting area for large numbers of migratory birds.[2]

The project cost approximately $178 million dollars (2008 purchase price).[1]

Details

The project was developed by Invenergy and initially proposed in 2004 to be a 200 MW facility with 133 wind turbines. The draft environmental impact statement (EIS) was submitted on March 8, 2005.[3] After a 45-day public comment and review period, the final environmental impact statement was submitted on May 18, 2005. The project area contained within the final environmental impact statement project covers 32,400 acres (~50 square miles) with approximately 11,000 acres dedicated to turbine easements.[4] The Public Service Commission of Wisconsin issued a Certificate of Public Convenience and Necessity (CPCN) on July 14, 2005.[5]

Despite perceived initial support, there grew significant controversy in the siting selection related to the wildlife, visual, and other impacts.[6] These led to further environmental studies, offers of additional monetary compensation, organized opposition, and delays due to legal action. Permitting from an Air Route Surveillance Radar facility to the south also slowed the project.[7] The experience led some communities in the region to pass moratoria on further development, some of which have been challenged by state agencies.[8]

The project was eventually approved to begin construction in 2007.[9] Brownsville-based Michels Corporation provided EPC services.[10] Completed in 2008, the downsized facility includes 85 General Electric SLE 1.6 MW wind turbines and a single GE SLE 1.85 MW turbine. It is setback two-miles from the Horicon Marsh located to the west.[11] Two smaller wind farms named "Cedar Ridge" (68 MW) and "Butler Ridge" (45 MW), as well as the 145 MW Blue Sky Green Field Wind Energy Center, came online within about the same year.[12] [13]

Followup information sessions and academic studies on the environmental and cultural impacts of the project have been pursued. Macalester College has documented the controversy surrounding the project and studied its implications. At the invitation of the Friends of the Horicon National Wildlife Refuge in 2010, the conservation chair of the Wisconsin Society for Ornithology further addressed local concerns on the effects of wind turbines on wildlife.[14] A two-year study of bird and bat mortality at the Forward Wind facility was completed by University of Wisconsin researchers for the Public Service Commission of Wisconsin, with a report published in August 2011. Inline with similar studies elsewhere, it showed a relatively larger number of bat fatalities and a lesser number of added bird deaths. Red-tailed hawks represented around 20% of recorded bird fatalities.[15]

Electricity production

Generation (MW-h) of Forward Wind Energy Center and Capacity Factor[16] !Year!Jan!Feb!Mar!Apr!May!Jun!Jul!Aug!Sep!Oct!Nov!Dec!Annual (Total)!!Capacity Factor (%)
200818,57513,33318,02733,86233,51146,205163,51326.9
200934,43638,00637,82135,36733,83117,84016,09321,5809,96615,30027,58519,392307,21725.4
201034,58719,66037,82141,28126,20817,34818,52019,20427,17929,66238,22732,419342,11628.3
201124,54338,68925,88735,55438,74223,83016,44812,64921,54730,54539,98133,519341,93428.3
201242,55430,09141,17732,12928,39627,02714,48317,08923,57434,80029,54730,376351,24329.1
201343,77932,51728,33540,01829,83916,37315,76213,70021,07626,70140,85428,153337,10727.9
201445,85536,57736,23339,59725,25521,33818,40312,20919,40832,70437,64125,819351,03929.1
201534,71831,53935,60934,54732,99915,67916,58819,74520,38725,34543,68138,539349,37628.9
201630,24134,72826,47231,50726,69519,71417,93612,36923,15725,97932,06339,028319,88926.5
201730,21732,08333,67532,82827,85323,56611,87310,53913,47630,40133,51733,211313,23925.9
201825,72618,70121,08616,83014,3159,8788,2638,93310,03618,11017,22318,881187,98215.6
201936,10731,36435,12038,07626,80223,74815,27113,26520,01030,88929,51839,019339,19928.1
2020141881712615196130351088778066175677511854146731974013667151,122
2021229414726189931130410844890258425624993075151523816436127,648
2022124261411115775184071308410514735753458759140001320416671149,653
2023877518398140581598297215740487368248546

See also

External links

Notes and References

  1. Web site: Forward Wind Park (Wisconsin Public Service). 2020-07-12. accel.wisconsinpublicservice.com.
  2. Web site: Fact Sheet - Forward Wind Park . Wisconsin Public Service Corporation . April 28, 2019.
  3. News: March 8, 2005. Forward Wind Project – Volume 1 Draft Environmental Impact Statement. 1. Public Service Commission of Wisconsin and Wisconsin Department of Natural Resources. July 11, 2020.
  4. News: May 18, 2005. Forward Wind Project – Volume 1 Final Environmental Impact Statement. Wisconsin Public Service Commission and Wisconsin Department of Natural Resources. July 11, 2020.
  5. News: July 14, 2005. Application of Forward Energy LLC for a Certificate of Public Convenience and Necessity to Construct a Wind Electric Generation Facility and Associated High Voltage Electric 9300-CE-100 Transmission Facilities, to be Located in Dodge and Fond du Lac Counties. Public Service Commission of Wisconsin. July 11, 2020.
  6. Web site: Wind Energy Landscapes - Forward Wind . Macalester College . April 28, 2019.
  7. Web site: Horicon wind farm foes find unlikely ally in U.S. Air Force . March 23, 2006 . Milwaukee Journal . Thomas Content.
  8. Web site: Forward Wind - Details . Macalester College . April 28, 2019.
  9. Web site: Invenergy's Forward Energy Wind Project In Wisconsin to Proceed with Construction . July 25, 2007 . Invenergy.
  10. Web site: Michels History . Michels Corporation . April 28, 2019.
  11. Web site: PSC approves wind farm near Horicon Marsh . July 11, 2005 . Electric Light & Power.
  12. Web site: Cedar Ridge Wind Farm . openei.org . April 28, 2019.
  13. Web site: Butler Ridge Wind Farm . openei.org . April 28, 2019.
  14. Web site: Ornithologist discusses the effect of wind turbines on birds . May 14, 2010 . Beaver Dam Daily Citizen . Meagan Sheridan.
  15. Web site: Assessing Bird and Bat Mortality at the Forward Energy Center . Public Service Commission of Wisconsin . August 2011 . April 28, 2019.
  16. Web site: Electricity Data Browser . 2023-12-26 . www.eia.gov.